CODEN, AL —
OSHA Inspection: WILLIAMS ENERGY, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of WILLIAMS ENERGY, INC. in 6000 ROCK ROAD, CODEN, AL 36523 (NAICS 211111). OSHA activity number 339828311.
Where did this inspection happen?
- Establishment
- WILLIAMS ENERGY, INC.
- Site address
- 6000 ROCK ROAD
- City
- CODEN
- State
- AL
- ZIP
- 36523
- Mailing
- 8106 DAUPHIN ISLAND PARKWAY, THEODORE, AL 36582
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 211111
- Employees
- 12
- Ownership type
- A
Citations
2 citations on file for this inspection.
1910.119 D03 I D
- Issued
- Penalty
- Initial $4250.00 · Current $4250.00
General-duty citation text
29 CFR 1910.119(d)(3)(i)(D): Information pertaining to the equipment in the process did not include relief system design and design basis: a) Mobile Bay Gas Plant: On June 24, 2014 and at times prior to employees were exposed to fire and explosion hazard when operating the Stabilizer feed separator on skid PK-0804 due to the employer not having the relief design basis for PSV 1036 on Piping and instrumentation drawing MOB-8-P-010A which is set at 260 psig.
Recent events (1)
- — Z (S) $4250
1910.119 D03 II
- Issued
- Penalty
- Initial $4250.00 · Current $4250.00
General-duty citation text
29 CFR 1910.119(d)(3)(ii): The employer shall document that equipment complies with recognized and generally accepted good engineering practices. a) Mobile Bay Gas Processing Plant - On June 25, 2014 and at times prior employees were exposed to fire and explosion hazards due to a car seal missing on the four inch gate valve 040019 which is down stream from PSV 4001 on drawing MOB-8-P-040. Drawing MOB-8-P-040 did not show a car seal open on gate valve 040019 which is up stream from PSV 4001. The employer did not comply with the provisions of API 520 Part II Paragraph 6.5 Sizing, Selection and Installation of Pressure -Relieving Devices which requires that administrative control be in place that will prohibit the inappropriate closing of isolation valves in pressure relief system piping b) Mobile Bay Gas Processing Plant - On June 25, 2014 and at times prior employees were exposed to fire and explosion hazards due to drawing MOB-P-039 missing a car seal open on the 1 1/2 inch gate valve 039019 which is up stream from pressure control valve 3905. The employer did not comply with the provisions of API 520 Part II Paragraph 6.5 Sizing, Selection and Installation of Pressure -Relieving Devices which requires that administrative control be in place that will prohibit the inappropriate closing of isolation valves in pressure relief system piping .
Recent events (1)
- — Z (S) $4250
More inspections at WILLIAMS ENERGY, INC.
GALENA PARK, TX—2003-10-14 00:00:00
WILLIAMS ENERGY, INC.
GALENA PARK, TX—2001-07-02 00:00:00
WILLIAMS ENERGY, INC.
View WILLIAMS ENERGY, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 211111)
MORGANTOWN, WV—2024-08-21 00:00:00
ANDERSON EXCAVATING, LLC
PINEVILLE, NC—2024-03-05 00:00:00
156148 - WESTERN INTERNATIONAL, INC.
SOUTH BEND, IN—2021-10-06 00:00:00
112385 - MERCURIA
GEARY, OK—2021-03-23 00:00:00
DEVON ENERGY CORPORATION
BAKERSFIELD, CA—2021-02-12 00:00:00
CHEVRON U.S.A. INC.
More inspections in AL
FAIRHOPE, AL—2026-07-16
FRANCISCO ARES
LOXLEY, AL—2026-07-16
CARLOS CHE
TRUSSVILLE, AL—2026-07-16
ALL SOUTH STEELWORX, LLC
CLANTON, AL—2026-07-14
C & S CANOPY, INC.
BIRMINGHAM, AL—2026-07-14
SCHOLAR CRAFT PRODUCTS, INC.
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339828311.