OSHA Inspection: WILFREDO GALVEZ BONILLA

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of WILFREDO GALVEZ BONILLA in 6364 FRANTZ ROAD, DUBLIN, OH 43017 (NAICS 238140). OSHA activity number 339864530.

Watch Wilfredo Galvez Bonilla — free Get an email when a new federal OSHA severe-injury report for Wilfredo Galvez Bonilla is published. One employer, no account, unsubscribe in one click.
Site address
6364 FRANTZ ROAD
City
DUBLIN
State
OH
ZIP
43017
Mailing
805 LAUREL DRIVE, JEFFERSONVILLE, IN 47130
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
9
Ownership type
A

8 citations on file for this inspection.

1926.300 B01

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $1600.00 · Current $800.00 Reduced
29 CFR 1926.300(b)(1): When power operated tools are designed to accommodate guards, they shall be equipped with such guards when in use.    a. In the south/east side of the building where an employee was using a portable mortar mixer to mix mortar, the guard for the opening was removed while the mixer was in operation, thereby exposing the employee to a caught-in hazard.
Recent events (2)
  • — I (S) $800
  • — Z (S) $1600

1926.451 A06

Serious Gravity 10 1 instance 8 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $1400.00 Reduced
29 CFR 1926.451(a)(6): Scaffolds shall be designed by a qualified person and shall be constructed and loaded in accordance with that design. Non-mandatory Appendix A to this subpart contains examples of criteria that will enable an employer to comply with paragraph (a) of this section.    a. At the south/west side of the worksite where employees were working from a tubular frame scaffold, the scaffold was not designed by a qualified person, thereby exposing employees to fall hazards.    b. At the south/east side of the worksite where employees were working from a tubular frame scaffold, the scaffold was not designed by a qualified person, thereby exposing employees to fall hazards.
Recent events (2)
  • — I (S) $1400
  • — Z (S) $2800

1926.451 B01

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $1400.00 Reduced
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:    a. At the south/west side of the building where an employee was working from a scaffold removing plastic from the 4th story window, the working level was not fully planked, thereby exposing the employee to a 35 foot fall hazard.
Recent events (2)
  • — I (S) $1400
  • — Z (S) $2800

1926.451 B02

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.451(b)(2): Except as provided in paragraphs (b)(2)(i) and (b)(2)(ii) of this section, each scaffold platform and walkway shall be at least 18 inches (46 cm) wide.  a. On the south/west side of the building where an employee was working from a scaffold, the platform the employee was working from was 10 inches wide, thereby exposing the employee to a 35 foot fall hazard.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 B06

Serious Gravity 10 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $1400.00 Reduced
29 CFR 1926.451(b)(6): On scaffolds where scaffold planks are abutted to create a long platform, each abutted end shall rest on a separate support surface. This provision does not preclude the use of common support members, such as "T" sections, to support abutting planks, or hook on platforms designed to rest on common supports.    a. At the south/east side of the building where employees were working from a scaffold, the abutted ends were laid across non-structural 2 inch by 4 inch lumber wedged across the scaffold frames, thereby exposing employees to a fall hazard.
Recent events (2)
  • — I (S) $1400
  • — Z (S) $2800

1926.451 F07

Serious Gravity 10 1 instance 8 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $1400.00 Reduced
29 CFR 1926.451(f)(7): Scaffolds shall be erected, moved, dismantled, or altered only under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration. Such activities shall be performed only by experienced and trained employees selected for such work by the competent person.    a. At the worksite where employees erected and dismantled scaffolds, there was no competent person qualified to supervise and direct the erection or dismantling of scaffolds. The employees who conducted this work were not trained due to there being no competent person, thereby exposing employees to 16 to 35 foot fall hazards.
Recent events (2)
  • — I (S) $1400
  • — Z (S) $2800

1926.451 G04 I

Serious Gravity 10 2 instances 8 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $1400.00 Reduced
29 CFR 1926.451(g)(4)(i): Guardrail systems shall be installed along all open sides and ends of platforms. Guardrail systems shall be installed before the scaffold is released for use by employees other than erection/dismantling crews.    a. On the south/east side of the building where employees were installing stone to the exterior of the building, guardrails were not installed along all open sides and ends of the platforms, thereby exposing employees to a 16 foot fall hazard.    b. On the south/west side of the building where an employee was removing plastic window coverings of the forth floor windows, guardrails were not installed along all open sides and ends of the platform, thereby exposing employees to a 35 foot fall hazard.
Recent events (2)
  • — I (S) $1400
  • — Z (S) $2800

1926.452 C02

Serious Gravity 10 1 instance 8 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $1400.00 Reduced
29 CFR 1926.452(c)(2): Frames and panels shall be braced by cross, horizontal, or diagonal braces, or combination thereof, which secure vertical members together laterally. The cross braces shall be of such length as will automatically square and align vertical members so that the erected scaffold is always plumb, level, and square. All brace connections shall be secured.    a. On the south/east side of the building where scaffold frames were erected to support the scaffold between two roofs, the frame was not braced, thereby exposing employees to a 16 foot fall hazard.
Recent events (2)
  • — I (S) $1400
  • — Z (S) $2800