Safety Incidents OSHA Severe Injury Reports · 2015–2025
4,113,118Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: DELTA STUCCO & STONE, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of DELTA STUCCO & STONE, INC. in BUILDING 5422 FORT JACKSON, COLUMBIA, SC 29207 (NAICS 238140). OSHA activity number 339886236.

Watch Delta Stucco & Stone, INC. — free Get an email when a new federal OSHA severe-injury report for Delta Stucco & Stone, INC. is published. One employer, no account, unsubscribe in one click.
Site address
BUILDING 5422 FORT JACKSON
City
COLUMBIA
State
SC
ZIP
29207
Mailing
3088 PROCESS DRIVE, NORCROSS, GA 30071
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
12
Ownership type
A

3 citations on file for this inspection.

1926.451 H04 II

Other-than-serious 1 instance 6 exposed
Issued
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.451(h)(4)(ii):  Toeboards securely fastened in place at the outermost edge of the platform had more than 1/4 inch (0.7 cm) clearance above the walking/working surface.   a) West side of Building E-2: The toeboard secured to the north end of the tubular welded frame mason's scaffold had an opening of approximately 1.5 inches between it and the edge of the working platform.
Recent events (1)
  • — Z (O) $0

1910.1200 E01

Other-than-serious 1 instance 12 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met: (Construction Reference: 1926.59:  a) Worksite: The employer could not produce a written Hazard Communication Program which covered employees working with hazards at the site such as; EIFS system containing;  Primus acrylic-modified adhesive and base coat; Portland cement; Dryvit reinforcing fabric; and a DPR finish coat.  ABATEMENT CERTIFICATION IS REQUIRED
Recent events (1)
  • — Z (O) $0

1910.1200 G08

Other-than-serious 1 instance 12 exposed
Issued
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.1200(g)(8):   The employer did not maintain in the workplace copies of the required safety data sheets for each hazardous chemical, and did not ensure that they were readily accessible during each work  shift to employees when they were in their work area(s)  a) Worksite: The employer could not produce a material safety data sheet for Portland cement used by employees at the worksite.
Recent events (1)
  • — Z (O) $0

View DELTA STUCCO & STONE, INC.'s full OSHA safety record →