OSHA Inspection: DS MASONRY, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of DS MASONRY, INC. in 661 CAPISTRANO, PUEBLO WEST, CO 81007 (NAICS 238140). OSHA activity number 339899684.

Watch DS Masonry, INC. — free Get an email when a new federal OSHA severe-injury report for DS Masonry, INC. is published. One employer, no account, unsubscribe in one click.
Establishment
DS MASONRY, INC.
Site address
661 CAPISTRANO
City
PUEBLO WEST
State
CO
ZIP
81007
Mailing
1985 ASPEN CIRCLE, PUEBLO, CO 81006
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
9
Ownership type
A

5 citations on file for this inspection.

1903.19 C01

Other-than-serious 2 instances 9 exposed
Issued
Abate by
Penalty
Initial $400.00 · Current $400.00
29 CFR 1903.19(c)(1): The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated:  (a)  The employer did not submit abatement certification and documentation for Citation 1, Items 1, 2a, and 2b of this inspection, originally issued on November 3, 2014.  (b)  The employer did not submit abatement certification for Citation 2, Item 1, of this inspection, originally issued on November 3, 2014.    Abatement Note:  Abatement certification is required for this item (see enclosed "Certification of Corrective Action Worksheet").
Recent events (1)
  • — Z (O) $400

5(a)(1)

Serious Gravity 5 1 instance 9 exposed
Issued
Abate by
Penalty
Initial $1600.00 · Current $1600.00
OSH ACT of 1970 Section (5)(a)(1): The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to crushing and struck-by hazards:  (a)  On or about August 12, 2014, and at times prior, the employer did not ensure the Cat TH63 rough terrain fork truck had the capacity ratings in a location that the operator could see them.  Abatement Note:  Abatement certification and documentation are required for this item (see enclosed "Certification of Corrective Action Worksheet").
Recent events (1)
  • — Z (S) $1600

1926.405 G02 III

Serious Gravity 10 1 instance 9 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $2800.00
29 CFR 1926.405(g)(2)(iii): Flexible cords were not used in continuous lengths without splice or tap:  (a) On or about August 12, 2014, and at times prior, employees were exposed to electrical and fire hazards from the electrical cord of the Target 19 inch, 208V, masonry saw that was spliced.  The original black cord and was still connected to the temporary electrical panel and a tied with wire nuts to a blue cord that was connected to the saw.    Abatement Note:  Abatement certification and documentation are required for this item (see enclosed "Certification of Corrective Action Worksheet").
Recent events (1)
  • — Z (S) $2800

1926.405 G02 IV

Serious Gravity 10 2 instances 9 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.405(g)(2)(iv): Flexible cords were not connected to devices and fittings so that strain relief is provided to prevent pull from being directly transmitted to joints or terminal screws:  (a)  On or about August 12, 2014, employees were exposed to shock and other electrical hazards from the cord that connected the secondary construction trailer to the temporary electrical panel on the east side of the auditorium that was under construction because the cord insulation was not connected to the fitting thus placing strain directly on the live conductors.   (b)  On or about August 12, 2014, employees were exposed to shock and other electrical hazards from the extension cord that connected the mason's hammer drill to a generator, in that the cord insulation was pulled back from the plug placing strain directly on the live conductors.    Abatement Note:  Abatement certification and documentation are required for this item (see enclosed "Certification of Corrective Action Worksheet").
Recent events (1)
  • — Z (S) $0

1910.1200 H03 IV

Other-than-serious 1 instance 9 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.1200(h)(3)(iv):   The details of the hazard communication program developed by the employer, did not include an explanation of the labels received on shipped containers and the workplace labeling system used by their employer; the safety data sheet, including the order of information and how employee could obtain and use the appropriate hazard information:  (a)  On or about August 12, 2014, and at times prior, the employer had not train employees on the new label elements, signal words and safety data sheets format that was required to be completed by December 1, 2013.     Abatement Note:  Abatement certification is required for this item (see enclosed "Certification of Corrective Action Worksheet").
Recent events (1)
  • — Z (O) $0

View DS MASONRY, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339899684.