OSHA Inspection: PORTOFINO, LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of PORTOFINO, LLC in 1528 5TH. ST., NW, WASHINGTON, DC 20006 (NAICS 236118). OSHA activity number 340072529.

Watch Portofino, LLC — free Get an email when a new federal OSHA severe-injury report for Portofino, LLC is published. One employer, no account, unsubscribe in one click.
Establishment
PORTOFINO, LLC
Site address
1528 5TH. ST., NW
City
WASHINGTON
State
DC
ZIP
20006
Mailing
1610 11TH. ST., NW, SUITE 4A, WASHINGTON, DC 20001
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236118
Employees
1
Ownership type
A

2 citations on file for this inspection.

1926.100 A

Serious Gravity 5 1 instance 2 exposed
Issued
Penalty
Initial $1600.00 · Current $1600.00
29 CFR 1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets:   a) 5th Street, NW, Exposure - On or about 11/07/2014, two mason tenders working at or around the base of a fabricated frame scaffold were exposed to a struck-by hazard from unrestrained loose brick and hand tool and were not provided with head protection.
Recent events (1)
  • — Z (S) $1600

1926.451 C01 II

Serious Gravity 5 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $2000.00 · Current $2000.00
29 CFR 1926.451(c)(1)(ii): 29 CFR 1926.451(c)(1)(ii): Supported scaffolds with a height to base width ratio of more than four to one (4:1) were not restrained from tipping by installing guys, ties, and braces at each end of the scaffold and/or at horizontal intervals not to exceed 30 feet (9.1 m):    a)  5th Street, NW, Exposure  On or about 11/07/2014, masons laying brick from a two fabricated frame scaffold systems were exposed to a potential scaffold collapse for the scaffolds, which were both 24 feet tall and five feet wide, were not otherwise restrained of attached or secured to the face of the building by guying or some similar method of providing stability.     Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.