OSHA Inspection: KAZIMIERZ MALESZEWSKI

Unprogrammed Other inspection · Safety discipline

On , OSHA opened an unprogrammed Other safety inspection of KAZIMIERZ MALESZEWSKI in 33 MAPLE AVE., GREENWICH, CT 06830 (NAICS 238350). OSHA activity number 340121268.

Watch Kazimierz Maleszewski — free Get an email when a new federal OSHA severe-injury report for Kazimierz Maleszewski is published. One employer, no account, unsubscribe in one click.
Site address
33 MAPLE AVE.
City
GREENWICH
State
CT
ZIP
06830
Mailing
64 SOUTH MAIN ST. APT. 2A, SPRING VALLEY, NY 10977
Inspection type
Unprogrammed Other (I)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238350
Employees
3
Ownership type
A

6 citations on file for this inspection.

1926.451 A06

Serious Gravity 10 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $1600.00 Reduced
29 CFR 1926.451(a)(6): Scaffolds were not designed by a qualified person.    Worksite: The one piece section of the extension ladder that was used as a scaffold platform was not designed as an adequate scaffold platform by a qualified person.
Recent events (2)
  • — I (S) $1600
  • — Z (S) $2800

1926.1053 B04

Serious Gravity 10 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.1053(b)(4): Ladder(s) were used for purposes other than the purpose for which they were designed.  Worksite: A one piece section of an extension ladder that was used as a scaffold platform was not used for the purpose in which it was designed.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 F07

Serious Gravity 10 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $1600.00 Reduced
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration:; Such activities were not performed only by experienced and trained employees selected for such work by the competent person.    Worksite: The pump jack scaffold that the employees were working from at a height above 10 feet was not erected under the supervision of a person competent in scaffold erection.
Recent events (2)
  • — I (S) $1600
  • — Z (S) $2800

1926.454 A01

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.454(a)(1): The employer failed to have each employee who performs work while on a scaffold trained regarding the nature of any electrical hazards, fall hazards and falling object hazards in the work area.  Worksite: The employees who were working from the pump jack scaffold that was not erected properly and without fall protection at a height above 10 feet were not trained to recognize the hazards associated with the type of scaffold being used.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 G01 VII

Serious Gravity 10 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $1600.00 Reduced
29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section.    Worksite: The employees who were working from the pump jack scaffold platform at a height above 10 feet were not protected from fall hazards by the use of guardrails, personal fall arrest systems or nets.
Recent events (2)
  • — I (S) $1600
  • — Z (S) $2800

1926.452 J02

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $2000.00 · Current $1400.00 Reduced
29 CFR 1926.452(j)(2): Poles shall be secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary. When the pump jack has to pass bracing already installed, an additional brace shall be installed approximately 4 feet (1.2 m) above the brace to be passed, and shall be left in place until the pump jack has been moved and the original brace reinstalled.    Worksite: The pump jack scaffold that employees were working from was not braced or secured at the bottom of the scaffold poles.
Recent events (2)
  • — I (S) $1400
  • — Z (S) $2000