OSHA Inspection: ENERGY TRANSFER PARTNERS L.P., GODLEY GAS PLANT

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of ENERGY TRANSFER PARTNERS L.P., GODLEY GAS PLANT in 8711 CR 916, GODLEY, TX 76044 (NAICS 211112). OSHA activity number 340190008.

Watch Energy Transfer Partners L.P., Godley GAS Plant — free Get an email when a new federal OSHA severe-injury report for Energy Transfer Partners L.P., Godley GAS Plant is published. One employer, no account, unsubscribe in one click.
Site address
8711 CR 916
City
GODLEY
State
TX
ZIP
76044
Mailing
8711 CR 916, GODLEY, TX 76044
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
211112
Employees
22
Ownership type
A

2 citations on file for this inspection.

1910.37 B02

Serious Gravity 5 1 instance 9 exposed
Issued
Abate by
Penalty
Initial $3400.00 · Current $2040.00 Reduced
29 CFR 1910.37(b)(2): Each exit was not clearly visible and marked by a sign reading "Exit."   In the MCC Room, employees were exposed to entrapment and fire hazards where the employer did not ensure that the exit route door was identified and clearly marked with an exit sign.
Recent events (2)
  • — I (S) $2040
  • — Z (S) $3400

1910.119 J04 I

Serious Gravity 10 10 instances 15 exposed
Issued
Abate by
Penalty
Initial $7000.00 · Current $4200.00 Reduced
29 CFR 1910.119(j)(4)(i): The employer did not perform inspection and tests on process equipment.   The employer does not perform inspections and tests on process equipment.    The violation occurred in the Godley Energy Transfer Partners facility on or about January 13, 2015 and at times prior thereto where employees were exposed to fire and inhalation hazards when the employer failed to perform testing and inspections of controls designated as safeguards such as but not limited to:    a.     Pressure control valve PCV-2301A (P&ID D-062601-003 rev.0) b.     Pressure control valve PCV-2301B (P&ID D-062601-003 rev.0) c.      Process control valve PCV-2301C (P&ID D-062601-003 rev.0 d.     Pressure control valve PCV-2013 (P&ID D-5978-P04-200 rev.0) e.     Pressure alarm high PAH- 2013 (P&ID D-5978-P04-200 rev.0) f.      Pressure switch/alarm high high PSHH-2001(P&ID D-5978-P04-200 rev.0) g.     Emergency shutdown (ESD) valve XV-2000 (P&ID D-5978-P04-200 rev.0) h.     Pressure control valve PCV-2110 (P&ID D-5978-P04-202 rev.1) i.      Level switch high high LSHH-2172 (P&ID D-5978-P04-204 rev.2) j.      Pressure differential  alarm high high PDAHH-2232 (P&ID D-5978-P04-204 rev.2)    Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date the employer must submit documentation showing that it is in compliance with the standard, including describing the steps it is taking to ensure inspections and tests on process equipment are performed.
Recent events (2)
  • — I (S) $4200
  • — Z (S) $7000