GODLEY, TX —
OSHA Inspection: ENERGY TRANSFER PARTNERS L.P., GODLEY GAS PLANT
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of ENERGY TRANSFER PARTNERS L.P., GODLEY GAS PLANT in 8711 CR 916, GODLEY, TX 76044 (NAICS 211112). OSHA activity number 340190008.
Where did this inspection happen?
- Establishment
- ENERGY TRANSFER PARTNERS L.P., GODLEY GAS PLANT
- Site address
- 8711 CR 916
- City
- GODLEY
- State
- TX
- ZIP
- 76044
- Mailing
- 8711 CR 916, GODLEY, TX 76044
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 211112
- Employees
- 22
- Ownership type
- A
Citations
2 citations on file for this inspection.
1910.37 B02
- Issued
- Abate by
- Penalty
- Initial $3400.00 · Current $2040.00 Reduced
General-duty citation text
29 CFR 1910.37(b)(2): Each exit was not clearly visible and marked by a sign reading "Exit." In the MCC Room, employees were exposed to entrapment and fire hazards where the employer did not ensure that the exit route door was identified and clearly marked with an exit sign.
Recent events (2)
- — I (S) $2040
- — Z (S) $3400
1910.119 J04 I
- Issued
- Abate by
- Penalty
- Initial $7000.00 · Current $4200.00 Reduced
General-duty citation text
29 CFR 1910.119(j)(4)(i): The employer did not perform inspection and tests on process equipment. The employer does not perform inspections and tests on process equipment. The violation occurred in the Godley Energy Transfer Partners facility on or about January 13, 2015 and at times prior thereto where employees were exposed to fire and inhalation hazards when the employer failed to perform testing and inspections of controls designated as safeguards such as but not limited to: a. Pressure control valve PCV-2301A (P&ID D-062601-003 rev.0) b. Pressure control valve PCV-2301B (P&ID D-062601-003 rev.0) c. Process control valve PCV-2301C (P&ID D-062601-003 rev.0 d. Pressure control valve PCV-2013 (P&ID D-5978-P04-200 rev.0) e. Pressure alarm high PAH- 2013 (P&ID D-5978-P04-200 rev.0) f. Pressure switch/alarm high high PSHH-2001(P&ID D-5978-P04-200 rev.0) g. Emergency shutdown (ESD) valve XV-2000 (P&ID D-5978-P04-200 rev.0) h. Pressure control valve PCV-2110 (P&ID D-5978-P04-202 rev.1) i. Level switch high high LSHH-2172 (P&ID D-5978-P04-204 rev.2) j. Pressure differential alarm high high PDAHH-2232 (P&ID D-5978-P04-204 rev.2) Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date the employer must submit documentation showing that it is in compliance with the standard, including describing the steps it is taking to ensure inspections and tests on process equipment are performed.
Recent events (2)
- — I (S) $4200
- — Z (S) $7000
More inspections in this industry (NAICS 211112)
MAYSVILLE, OK—2021-02-23 00:00:00
ONEOK FIELD SERVICES COMPANY, L.L.C.
WRIGHT, WY—2021-01-21 00:00:00
EOG RESOURCES, INC
HURRICANE, WV—2020-11-04 00:00:00
PILLAR ENERGY LLC
MONT BELVIEU, TX—2020-09-17 00:00:00
TARGA RESOURCES
MONT BELVIEU, TX—2020-09-16 00:00:00
S OLIVER & ASSOCIATES, LLC
More inspections in TX
SPRING, TX—2026-07-10
DORSTENER WIRE TECH INC.
FORT WORTH, TX—2026-07-10
RC PROFESSIONAL ROOFING OF TEXAS LLC
CYPRESS, TX—2026-07-10
FEDERICO CARVAJAL GARCIA
SAN ANTONIO, TX—2026-07-10
ED LONG'S METAL WORKS
SAN ANTONIO, TX—2026-07-09
WAREHOUSE RACK COMPANY, LP
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340190008.