WASHINGTON, DC —
OSHA Inspection: JWG CONSTRUCTION
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of JWG CONSTRUCTION in 1813 HOBAN RD NW, WASHINGTON, DC 20007 (NAICS 238130). OSHA activity number 340374917.
Where did this inspection happen?
- Establishment
- JWG CONSTRUCTION
- Site address
- 1813 HOBAN RD NW
- City
- WASHINGTON
- State
- DC
- ZIP
- 20007
- Mailing
- 4611 FORGE ROAD, PERRY HALL, MD 21128
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238130
- Employees
- 6
- Ownership type
- A
Citations
2 citations on file for this inspection.
1926.501 B13
- Issued
- Penalty
- Initial $2800.00 · Current $2800.00
General-duty citation text
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b): a) On February 3, 2015 and at times prior thereto; east area; employees framing a new residential home were observed walking the top plate and working on the outside wall without fall protection in place to prevent them from falling 25 feet to ground level.
Recent events (1)
- — Z (S) $2800
1910.178 L04 III
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.178(l)(4)(iii): An evaluation of each powered industrial truck operator's performance was not being conducted at least once every three years: a) On February 3, 2015 and at times prior thereto; front of residence (Northside); employees were operating an all-terrain powered industrial truck without being re-evaluated at least every three years. The last time the operator was tested was on April 2006. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (O) $0
More inspections in this industry (NAICS 238130)
FAIRHOPE, AL—2026-07-16
FRANCISCO ARES
WOODHAVEN, MI—2026-07-16
G.J. PERELLI CO., L.L.C.
PHILADELPHIA, PA—2026-07-16
URUS CONSTRUCTION CORPORATION
BERLIN, NJ—2026-07-16
URUS CONSTRUCTION CORPORATION
MERIDIAN, ID—2026-07-15
TRIPLE R CONSTRUCTION LLC
More inspections in DC
WASHINGTON, DC—2026-06-30
U.S. DEPARTMENT OF AGRICULTURE
WASHINGTON, DC—2026-06-16
MACY'S
WASHINGTON, DC—2026-06-02
RIGO MULTISERVICES
WASHINGTON, DC—2026-06-02
DDC CPL LLC
WASHINGTON, DC—2026-06-02
DDC CPL LLC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340374917.