Safety Incidents OSHA Severe Injury Reports · 2015–2025
4,113,118Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: JOSE ANTONIO VILLAGAS

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of JOSE ANTONIO VILLAGAS in 3 LANIER CT LOT #4, POOLER, GA 31322 (NAICS 238140). OSHA activity number 340503101.

Watch Jose Antonio Villagas — free Get an email when a new federal OSHA severe-injury report for Jose Antonio Villagas is published. One employer, no account, unsubscribe in one click.
Site address
3 LANIER CT LOT #4
City
POOLER
State
GA
ZIP
31322
Mailing
4711 OGEECHEE RD, SAVANNAH, GA 31405
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
4
Ownership type
A

7 citations on file for this inspection.

1926.51 F01

Serious Gravity 1 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $1200.00 · Current $720.00 Reduced
29 CFR 1926.51(f)(1): The employer did not provide adequate washing facilities for employees engaged in the application of paints, coatings, herbicides, or insecticides, or in other operations where contaminants may be harmful to the employees:    (a) Pooler construction site, on or about and at times preceding to March 31, 2015, hand soap was not provided for mixing mortar and laying brick, exposing employees to contact with Portland cement which can contain hexavalent chromium, exposing employees to skin burns.
Recent events (2)
  • — I (S) $720
  • — Z (S) $1200

1926.102 A01

Deleted Serious Gravity 1 1 instance 4 exposed
Issued
Penalty
Initial $1200.00 · Current $0.00 Reduced
29 CFR 1926.102(a)(1): Eye and face protective equipment were not used when machines or operations presented potential eye or face injury from physical, chemical, or radiation agents.  (a) Pooler construction site, on or about and at times preceding to March 31, 2015, for employees cutting bricks and performing masonry work, eye protection was not utilized.
Recent events (2)
  • — I (S) $0
  • — Z (S) $1200

1926.451 C02

Serious Gravity 5 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $1600.00 · Current $960.00 Reduced
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, and uprights did not bear on base plates and mud sills or other adequate firm foundation:    (a) Pooler residential construction site, on or about and at times preceding to March 31, 2015, for employees who were performing masonry work, base plates were not utilized to secure polls on tubular frame scaffold and the frames were set up on bricks, exposing employees to a 15-foot fall hazard.
Recent events (2)
  • — I (S) $960
  • — Z (S) $1600

1926.451 E01

Serious Gravity 5 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $1600.00 · Current $960.00 Reduced
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, sturcure, personnel hoist, or similar surface was not used.  Crossbraces were used as a means of access.    (a) Pooler construction site, on or about and at times preceding to March 31, 2015, tubular welded frame scaffold was not equipped with an access ladder for employees laying brick 15 feet above the ground.
Recent events (2)
  • — I (S) $960
  • — Z (S) $1600

1926.451 G01 VII

Serious Gravity 5 1 instance 2 exposed
Issued
Penalty
Initial $1700.00 · Current $1020.00 Reduced
29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section:    (a) Pooler residential construction site, on or about and at times preceding to March 31, 2015, fall protection was not provided for tubular welded scaffold being used for brick laying, exposing employees to a 15-foot fall hazard.
Recent events (2)
  • — I (S) $1020
  • — Z (S) $1700

1926.454 B

Serious Gravity 1 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $1200.00 · Current $720.00 Reduced
29 CFR 1926.454(b): The employer did not have each employee who was involved in erecting, disassembling, moving, operating, repairing, maintaining, or inspecting a scaffold trained by a competent person:    (a) Pooler construction site, on or about and at times preceding to March 31, 2015, the employer did not provide adequate training in the proper safe installation of scaffolding components for employees erecting and working from tubular welded frame scaffold while laying bricks, resulting in a 15 foot fall hazard.
Recent events (2)
  • — I (S) $720
  • — Z (S) $1200

1910.1200 H01

Other-than-serious 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.1200(h)(1): Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area: (Construction Reference: 1926.59).  (a) Pooler construction site, on or about and at times preceding to March 31, 2015, the employer did not provide training about hazardous chemicals for employees who were exposed to chemicals such as, but not limited to silica from cutting bricks and Portland cement in mortar, resulting in lung and skin hazards.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340503101.