WASHINGTON, DC —
OSHA Inspection: MELVIN BOWRIN
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of MELVIN BOWRIN in 1101 9TH STREET, NE, WASHINGTON, DC 20002 (NAICS 423320). OSHA activity number 340664887.
Where did this inspection happen?
- Establishment
- MELVIN BOWRIN
- Site address
- 1101 9TH STREET, NE
- City
- WASHINGTON
- State
- DC
- ZIP
- 20002
- Mailing
- 8500 OLIVER STREET, NEW CARROLLTON, MD 20784
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 423320
- Employees
- 2
- Ownership type
- A
Citations
3 citations on file for this inspection.
1926.451 B01
- Issued
- Abate by
- Penalty
- Initial $2800.00 · Current $2800.00
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): a) Front of Building - On or about May 28, 2015, workers were doing stucco work while working from the platform of a scaffold system that was not fully planked thereby exposing employees to a fall hazard of 14 feet 9 inches to the ground. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $2800
1926.451 E01
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used. a) Front of Building - On or about May 28, 2015, workers were doing stucco work while working from the platform of a scaffold system and they were not provided with a ladder for access thereby exposing employees to a fall hazard of 14 feet 9 inches to the ground. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $0
1926.451 G01 VII
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section: a) Front of Building - On or about May 28, 2015, workers were cleaning a block wall while working from the platform of a scaffold system that did not have guardrails installed and were not provided with personal fall arrest system to protect against falls exposing employees to a fall hazard of 14 feet 9 inches to the ground. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $0
More inspections in this industry (NAICS 423320)
DOVER FOXCROFT, ME—2026-07-14
REDI-ROCK OF CENTRAL MAINE
BUTLER, PA—2026-07-14
EFCO CORPORATION
GIBSONIA, PA—2026-06-30
FORM TECH CONCRETE FORMS
BLOOMSDALE, MO—2026-06-25
RICHARDS BRICK COMPANY
SAN JOSE, CA—2026-06-24
STONEVILLE USA, INC.
More inspections in DC
WASHINGTON, DC—2026-06-30
U.S. DEPARTMENT OF AGRICULTURE
WASHINGTON, DC—2026-06-16
MACY'S
WASHINGTON, DC—2026-06-02
RIGO MULTISERVICES
WASHINGTON, DC—2026-06-02
DDC CPL LLC
WASHINGTON, DC—2026-06-02
DDC CPL LLC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340664887.