HARLEM, GA —
OSHA Inspection: DIXIELAND EQUIPMENT SALES, INC.
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of DIXIELAND EQUIPMENT SALES, INC. in 1 HENRY MILLER STREET, HARLEM, GA 30814 (NAICS 321920). OSHA activity number 340745116.
Where did this inspection happen?
- Establishment
- DIXIELAND EQUIPMENT SALES, INC.
- Site address
- 1 HENRY MILLER STREET
- City
- HARLEM
- State
- GA
- ZIP
- 30814
- Mailing
- 3887 ATHENS HWY., TALMO, GA 30575
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 321920
- Employees
- 32
- Ownership type
- A
Citations
4 citations on file for this inspection.
1910.147 C04 II
- Issued
- Abate by
- Penalty
- Initial $2975.00 · Current $1785.00 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(ii): Procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, 29 CFR 1910.147(c)(4)(ii)(A), (c)(4)(ii)(B), (c)(4)(ii)(C) and (c)(4)(ii)(D): a) Plant - On or about 06/22/15 and at times prior thereto employees conducted maintenance and repairs of equipment including (but not limited to) the 5.0 HP Chop Saw, Baker Saw, Main transformer 150 KVA, Single Head Resaw, Pallet Saw #1, 30 HP Compressor, Gang Saw, Saw Dust System, 7.5 HP Chop Saw, Trim Saw, Pallet Saw #2, Notcher Machine, Auto Nailer Machine, Cardboard Baler, Heat Treater, and 5-Head Brewer Saw. The employer applied individual lockout/tagout procedures which did not clearly outline: a) the equipment and intended use, b) the types of energies and the specific procedural steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy, c) the specific procedural steps for the placement, removal and transfer of lockout devices or tagout devices and the responsibility for them, and d) the specific requirements for testing a machine or equipment to determine and verify the effectiveness of lockout devices, tagout devices, and other energy control measures. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $1785
- — Z (S) $2975
1910.95 D01
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.95(d)(1): When information indicated that any employee's exposure equaled or exceed the 8-hour time-weighted average of 85 decibels, the employer did not develop and implement a monitoring program: a) Plant - On or about 06/22/15 and at times prior thereto employees operated nail guns for the assembly of pallets. The employer did not assess the level of noise in the plant and the exposure of employees to determine whether a Hearing Conservation Program was needed to protect the workers. (Instantaneous noise measurements indicated 85.4 dB, 94.8 dB, 99.2 dB, and 95.6 dB). In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (O) $0
- — Z (O) $0
1910.147 C06 II
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.147(c)(6)(ii): The employer did not certify that periodic inspections of the energy control procedures had been performed. a) Plant - On or about 06/22/15 and at times prior thereto employees conducted maintenance and repairs of equipment including (but not limited to) the 5.0 HP Chop Saw, Baker Saw, Main transformer 150 KVA, Single Head Resaw, Pallet Saw #1, 30 HP Compressor, Gang Saw, Saw Dust System, 7.5 HP Chop Saw, Trim Saw, Pallet Saw #2, Notcher Machine, Auto Nailer Machine, Cardboard Baler, Heat Treater, and 5-Head Brewer Saw. Employees applied individual lockout/tagout procedures, and the employer did not certify that periodic and at least annual inspections of the procedures had been performed. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (O) $0
- — Z (O) $0
1910.147 C07 IV
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.147(c)(7)(iv): The employer did not certify that employee training had been accomplished and kept up to date: a) Plant - On or about 06/22/15 and at times prior thereto employees conducted maintenance and repairs of equipment including (but not limited to) the 5.0 HP Chop Saw, Baker Saw, Main transformer 150 KVA, Single Head Resaw, Pallet Saw #1, 30 HP Compressor, Gang Saw, Saw Dust System, 7.5 HP Chop Saw,Trim Saw, Pallet Saw #2, Notcher Machine, Auto Nailer Machine, Cardboard Baler, Heat Treater, and 5-Head Brewer Saw. Employees applied individual lockout/tagout procedures, and the employer did not certify that training for authorized and affected employees was complete and kept up to date. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections in this industry (NAICS 321920)
LAKELAND, FL—2026-07-16
ELIJAH WHOLESALE, LLC.
DECATUR, GA—2026-07-15
PALLETS ACQUISITION LLC
CLANTON, AL—2026-07-14
SPECWOOD PRODUCTS, INC.
FITCHBURG, MA—2026-07-10
KELLEY WOOD PRODUCTS, INC.
WASHINGTON COURT HOUSE, OH—2026-07-09
HALLIDAY LUMBER, LLC
More inspections in GA
GREENSBORO, GA—2026-07-16
PURE BEAUTY FARMS, INC.
FOREST PARK, GA—2026-07-16
POLYNT COMPOSITES USA INC.
AUGUSTA, GA—2026-07-16
GF CASTING SOLUTIONS AUGUSTA, LLC
CHAMBLEE, GA—2026-07-16
U.S. DEPARTMENT OF TREASURY
DECATUR, GA—2026-07-15
PALLETS ACQUISITION LLC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340745116.