On , OSHA opened a federal Agency safety inspection of BERTHELOT DESIGN CONSTRUCTION, INC. in 15151 HWY 603, KILN, MS 39556 (NAICS 238120). OSHA activity number 340900380.
Where did this inspection happen?
- Establishment
- BERTHELOT DESIGN CONSTRUCTION, INC.
- Site address
- 15151 HWY 603
- City
- KILN
- State
- MS
- ZIP
- 39556
- Mailing
- 15081 CHICKASAW ROAD, KILN, MS 39556
What kind of inspection was it?
- Inspection type
- Federal Agency (M)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238120
- Employees
- 5
- Ownership type
- A
Citations
3 citations on file for this inspection.
1926.703 A02
- Issued
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.703(a)(2): 29CFR1926.703(a)(2): Drawings or plans including all revisions for jack layout, formwork, (including shoring equipment), working decks and scaffolds were not available at the jobsite. (a) Construction Site - On or about September 8, 2015 approved engineered drawings were not available at the jobsite for the structural design changes from an elevated wood floor to a concrete floor. The changes were not submitted to the designer and engineer to develop new drawings for the changes.
Recent events (1)
- — Z (S) $0
1926.703 B01
- Issued
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.703(b)(1): Shoring equipment (including equipment used in reshoring operations) was not inspected prior to erection to determine that the equipment met the requirements specified in the formwork drawings: (a) Construction Site - On or about September 8, 2015, the employer failed to install shoring equipment to support the structure changes to the building and floor for changing the wood floor to a concrete floor.
Recent events (1)
- — Z (S) $0
1926.703 A01
- Issued
- Penalty
- Initial $5000.00 · Current $5000.00
General-duty citation text
29 CFR 1926.703(a)(1): Formwork was not designed, fabricated, erected, supported, braced and maintained so that it would be capable of supporting without failure all vertical and lateral loads that could reasonably be anticipated to be applied to the form: (a) Construction Site - On or about September 8, 2015 the formwork was not designed for a concrete floor. The approved engineered building plans were not followed for the construction of a wood floor. The building plans called for "Z" purlins on 12-inch center but were switched to "C" purlins on 16-inch center and used for a concrete floor.
Recent events (1)
- — Z (W) $5000
More inspections in this industry (NAICS 238120)
GARDENDALE, AL—2026-07-09
ANDINO'S IRON WORKERS, LLC
MIDLOTHIAN, VA—2026-07-09
B & J STEEL CONSTRUCTION, INC.
LYNCHBURG, VA—2026-07-09
GRAY'S WELDING LLC
CHESAPEAKE, VA—2026-07-08
MODERN STEEL AND STAIR LLC
YAKIMA, WA—2026-07-07
WA317991949 - H & A STEEL ERECTORS LLC
More inspections in MS
LAUREL, MS—2026-07-01
THERMO-KOOL
HORN LAKE, MS—2026-07-01
NEWLY WEDS FOODS, INC.
GAUTIER, MS—2026-07-01
DOUBLE R GAUTIER, LLC
OLIVE BRANCH, MS—2026-06-30
HYVE SOLUTIONS