YORK, PA —
OSHA Inspection: SUPERIOR EXTERIOR RESTORATION
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of SUPERIOR EXTERIOR RESTORATION in BETHANY UNITED METHODIST CHURCH 1401 MOUNT ROSE AVE., YORK, PA 17403 (NAICS 238140). OSHA activity number 340998202.
Where did this inspection happen?
- Establishment
- SUPERIOR EXTERIOR RESTORATION
- Site address
- BETHANY UNITED METHODIST CHURCH 1401 MOUNT ROSE AVE.
- City
- YORK
- State
- PA
- ZIP
- 17403
- Mailing
- 226 ROCKDALE AVE., YORK, PA 17403
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 1
- Ownership type
- A
Citations
4 citations on file for this inspection.
1910.1200 E01
- Issued
- Abate by
- Penalty
- Initial $2400.00 · Current $1200.00 Reduced
General-duty citation text
29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met: a) Construction Site - 1401 Mount Rose Ave, York, PA: the employer had not developed and or implemented a Hazard Communication Program for employee(s) engaged in tuckpointing operations using such products as, but not limited to, Portland Cement, Sand and Coloring Agents on or about October 9, 2015. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date, and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $1200
- — Z (S) $2400
1926.451 B01
- Issued
- Abate by
- Penalty
- Initial $2800.00 · Current $1400.00 Reduced
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) a) Construction Site - 1401 Mount Rose Ave, York, PA: On or about October 9, 2015 an employee was observed preforming masonry mortar joint repair from a welded tubular frame scaffold that was not fully planked between the front uprights and the rear uprights, thereby exposing employees to fall hazards. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date, and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $1400
- — Z (S) $2800
1926.451 C02
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, and uprights did not bear on base plates and mud sills or other adequate firm foundation. Supported scaffold was erected on soft soil. a) Construction Site - 1401 Mount Rose Ave, York, PA: On or about October 9, 2015 an employee was observed preforming masonry mortar joint repair from a welded tubular frame scaffold that was erected on soft bedding soil and grass without the use of base plates and mud sills. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date, and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 G01
- Issued
- Abate by
- Penalty
- Initial $2800.00 · Current $1400.00 Reduced
General-duty citation text
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level were not protected from falling to that lower level. a) Construction Site - 1401 Mount Rose Ave, York, PA: On or about October 9, 2015 an employee was observed preforming masonry mortar joint repair from a welded tubular frame scaffold and was not protected from falls by use of guardrails or a personal fall arrest system. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date, and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $1400
- — Z (S) $2800
More inspections in this industry (NAICS 238140)
MARIANNA, FL—2026-07-13
PRIMETIME MOBILE MASONRY LLC
LOMPOC, CA—2026-07-10
UNKNOWN EMPLOYER
FREEHOLD, NJ—2026-07-10
CRAIG'S MASONRY & HARDSCAPE LLC
CINCINNATI, OH—2026-07-09
ALL AMERICAN CONCRETE LLC
NEW YORK, NY—2026-07-08
JEY CONSTRUCTIONS WORKS CORP
More inspections in PA
MILTON, PA—2026-07-10
HOMETOWN FOODS CHEF BOYARDEE CO.
SUNBURY, PA—2026-07-10
DEMPSEY UNIFORM & LINEN SUPPLY, INC
LANDISVILLE, PA—2026-07-10
FAIRVIEW DEMOLITION LLC
YORK, PA—2026-07-10
AMERICAN SPECIALTY SYSTEMS INC.
WILLIAMSPORT, PA—2026-07-10
INTERNATIONAL PAINT PROS
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340998202.