OSHA Inspection: SUPERIOR EXTERIOR RESTORATION

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of SUPERIOR EXTERIOR RESTORATION in BETHANY UNITED METHODIST CHURCH 1401 MOUNT ROSE AVE., YORK, PA 17403 (NAICS 238140). OSHA activity number 340998202.

Watch Superior Exterior Restoration — free Get an email when a new federal OSHA severe-injury report for Superior Exterior Restoration is published. One employer, no account, unsubscribe in one click.
Site address
BETHANY UNITED METHODIST CHURCH 1401 MOUNT ROSE AVE.
City
YORK
State
PA
ZIP
17403
Mailing
226 ROCKDALE AVE., YORK, PA 17403
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
1
Ownership type
A

4 citations on file for this inspection.

1910.1200 E01

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $2400.00 · Current $1200.00 Reduced
29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met:  a) Construction Site - 1401 Mount Rose Ave, York, PA: the employer had not developed and or implemented a Hazard Communication Program for employee(s) engaged in tuckpointing operations using such products as, but not limited to, Portland Cement, Sand and Coloring Agents on or about October 9, 2015.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date, and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $1200
  • — Z (S) $2400

1926.451 B01

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $1400.00 Reduced
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii)        a) Construction Site - 1401 Mount Rose Ave, York, PA: On or about October 9, 2015 an employee was observed preforming masonry mortar joint repair from a welded tubular frame scaffold that was not fully planked between the front uprights and the rear uprights, thereby exposing employees to fall hazards.      Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date, and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $1400
  • — Z (S) $2800

1926.451 C02

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, and uprights did not bear on base plates and mud sills or other adequate firm foundation. Supported scaffold was erected on soft soil.     a) Construction Site - 1401 Mount Rose Ave, York, PA: On or about October 9, 2015 an employee was observed preforming masonry mortar joint repair from a welded tubular frame scaffold that was erected on soft bedding soil and grass without the use of base plates and mud sills.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date, and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 G01

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $1400.00 Reduced
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level were not protected from falling to that lower level.     a) Construction Site - 1401 Mount Rose Ave, York, PA: On or about October 9, 2015 an employee was observed preforming masonry mortar joint repair from a welded tubular frame scaffold and was not protected from falls by use of guardrails or a personal fall arrest system.     Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date, and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $1400
  • — Z (S) $2800