OSHA Inspection: EXCELLENT MASONRY & CONSTRUCTION CORP.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of EXCELLENT MASONRY & CONSTRUCTION CORP. in 420 S. HOME AVE., PARK RIDGE, IL 60068 (NAICS 238140). OSHA activity number 341316669.

Watch Excellent Masonry & Construction Corp. — free Get an email when a new federal OSHA severe-injury report for Excellent Masonry & Construction Corp. is published. One employer, no account, unsubscribe in one click.
Site address
420 S. HOME AVE.
City
PARK RIDGE
State
IL
ZIP
60068
Mailing
2405 GROVE ST., RIVER GROVE, IL 60171
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
7
Ownership type
A

4 citations on file for this inspection.

1910.178 L01 I

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $2000.00 · Current $1000.00 Reduced
29 CFR 1926.602(d): Note: The requirements applicable to construction work under paragraph (d) of this section are identical to those set forth at paragraph (l) of 29 CFR 1910.178:       29 CFR 1910.178(l)(1)(i): The employer did not ensure that each powered industrial truck operator was competent to operate a powered industrial truck safely, as demonstrated by the successful completion of the training and evaluation specified in this paragraph (l):      a) On or about March 10, 2016, the employer did not train and evaluate employees operating the Lull 644E-42 all-terrain forklift.     In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $1000
  • — Z (S) $2000

1926.100 A

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $1600.00 · Current $800.00 Reduced
29 CFR 1926.100(a):  Employees were not protected by protective helmets while working in areas where there was a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns:      a) On March 10, 2016, employees were not wearing protective helmets where there was a possible danger of head injury.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $800
  • — Z (S) $1600

1926.451 B01

Serious Gravity 10 1 instance 1 exposed
Issued
Penalty
Initial $2800.00 · Current $1800.00 Reduced
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii):        a)  On March 10, 2016, employees were exposed to the hazard of falling approximately 23 feet to the ground, while performing masonry work from tubular welded frame scaffold platform that was not fully planked.     No abatement certification or documentation is required for this item.
Recent events (2)
  • — I (S) $1800
  • — Z (S) $2800

1926.451 G01

Serious Gravity 10 1 instance 1 exposed
Issued
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level was not protected from falling to that lower level:  a)  On March 10, 2016, employees were exposed to the hazard of falling approximately 23 feet to the ground, while performing masonry work from tubular welded frame scaffold platform.     No abatement certification or documentation is required for this item.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0