Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,214Inspections Most recent open 2026-07-16 Last loaded 2026-07-20

OSHA Inspection: WEBB'S SUPERGRO PRODUCTS, INC.

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of WEBB'S SUPERGRO PRODUCTS, INC. in 30 PENNSYLVANIA AVENUE, MILL HALL, PA 17751 (NAICS 325314). OSHA activity number 341614428.

Watch Webb'S Supergro Products, INC. — free Get an email when a new federal OSHA severe-injury report for Webb'S Supergro Products, INC. is published. One employer, no account, unsubscribe in one click.
Site address
30 PENNSYLVANIA AVENUE
City
MILL HALL
State
PA
ZIP
17751
Mailing
PO BOX C, MILL HALL, PA 17751
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
325314
Employees
21
Ownership type
A

9 citations on file for this inspection.

1910.23 C01

Serious Gravity 1 1 instance 1 exposed
Issued
Penalty
Initial $1020.00 · Current $765.00 Reduced
29 CFR 1910.23(c)(1): Open-sided floors and/or platforms four feet or more above adjacent floor or ground level were not guarded with standard railings (or equivalent) and toeboards:    a) Main building: The guardrail was missing from along a portion of the elevated mezzanine storage area exposing employees to a 7 foot fall hazard, as observed on or about July 12, 2016.    Abatement Observed During Inspection.
Recent events (2)
  • — I (S) $765
  • — Z (S) $1020

1910.27 D03

Serious Gravity 1 1 instance 1 exposed
Issued
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.27(d)(3): The side rails of through or side-step ladder extensions did not extend 3 1/2 feet above paraphets and landings:  a) Main building: The side rails of the through ladder, used as access to the mezzanine, only extended 12 inches above the landing, as observed on or about July 12, 2016.  Abatement Observed During Inspection
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.219 F03

Serious Gravity 5 2 instances 1 exposed
Issued
Abate by
Penalty
Initial $1360.00 · Current $1020.00 Reduced
29 CFR 1910.219(f)(3): Sprocket wheels and chains which were seven -7 feet or less above floors or platforms were not enclosed:    a) Main building: The chain and sprockets on the rear of the fertilizer mixing drum were not enclosed, as observed on or about July 12, 2016.    Abatement Certification Required    b) Main building: The chain and sprocket on the fertilizer bagging conveyor were not enclosed, as observed on or about July 12, 2016.    Abatement Observed During Inspection.
Recent events (2)
  • — I (S) $1020
  • — Z (S) $1360

1910.305 G02 III

Serious Gravity 1 1 instance 1 exposed
Issued
Penalty
Initial $1020.00 · Current $765.00 Reduced
29 CFR 1910.305(g)(2)(iii): Flexible cords were not connected to devices and fittings so that tension would not be transmitted to joints or terminal screws:    a) Main building: The flexible cord used to supply power to the bag conveyor was not provided with strain relief at either the plug or motor ends , as observed on or about July 12, 2016.    Abatement Observed During Inspection.
Recent events (2)
  • — I (S) $765
  • — Z (S) $1020

1910.303 B08 I

Serious Gravity 1 1 instance 1 exposed
Issued
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.303(b)(8)(i): Electrical equipment was not firmly secured to the surface on which it was mounted:  a) Main building: The electrical light switch box was not secured to the wall surface, as observed on or about July 12, 2016.  Abatement Observed During Inspection
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.22 A02

Other-than-serious 2 instances 1 exposed
Issued
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.22(a)(2): Floor(s) of workroom(s) were not maintained in a clean and, so far as possible, a dry condition:  a) Main building: The floors of the main building were slippery due to spilled fertilizer and humid weather conditions creating a potential slip hazard for employees and forklift traffic, as observed on or about July 12, 2016.  Abatement Certification Required  b) Main building: A chemical (Spray Aide) had leaked on the floor of the pesticide storage area, as observed on or about July 12, 2016.  Abatement Observed During Inspection
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

1910.1200 E01

Other-than-serious 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met:    a) Main building: The employer did not develop and maintain a written hazard communication program for the handling of chemicals including, but not limited to, fertilizers, pesticides and herbicides, on or about July 12, 2016.    Abatement Certification Required.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

1910.1200 H03 IV

Other-than-serious 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.1200(h)(3)(iv): Employee training did not include the details of the hazard communication program developed by the employer, including an explanation of the labeling system and the material safety data sheet, and how employees can obtain and use the appropriate hazard information:  a) Main building: The employer did not train employees on the new GHS label elements (e.g., pictograms and signal words) and the new SDS format (e.g., section order and type of information contained in each section), on or about July 12, 2016.  Abatement Certification Required.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

1904.1 A02

Other-than-serious 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $340.00 · Current $255.00 Reduced
29 CFR 1904.1(a)(2): The company has more than ten (10) employees at any time during the last calendar year and did not keep OSHA injury and illness records:    a) Office: The company failed to maintain OSHA injury and illness logs, on or about July 12, 2016.    Abatement Certification Required.
Recent events (2)
  • — I (O) $255
  • — Z (O) $340

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341614428.