SYRACUSE, NY —
OSHA Inspection: DRISCOLL MASONRY RESTORATION, INC.
Unprogrammed Other inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Other safety inspection of DRISCOLL MASONRY RESTORATION, INC. in VA HOSPITAL 800 IRVING AVENUE, SYRACUSE, NY 13210 (NAICS 236220). OSHA activity number 341767655.
Where did this inspection happen?
- Establishment
- DRISCOLL MASONRY RESTORATION, INC.
- Site address
- VA HOSPITAL 800 IRVING AVENUE
- City
- SYRACUSE
- State
- NY
- ZIP
- 13210
- Mailing
- 4562 JORDAN ROAD, SKANEATELES FALLS, NY 13153
What kind of inspection was it?
- Inspection type
- Unprogrammed Other (I)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236220
- Employees
- 15
- Ownership type
- A
Citations
5 citations on file for this inspection.
1926.502 D08
- Issued
- Abate by
- Penalty
- Initial $5487.00 · Current $3292.00 Reduced
General-duty citation text
29 CFR 1926.502(d)(8): Horizontal lifelines were not designed, installed, and used under the supervision of a qualified person, as part of a complete personal fall arrest system, which maintained a safety factor of at least two: a) At the jobsite, on the roof, on or about 9/9/16: The employer did not ensure that employees working near a roof ledge with a fall potential of 5 stories to the lower level, had effective fall protection utilizing systems provided by the employer that had multiple critical flaws. Abatement documentation must be submitted for this item.
Recent events (3)
- — F (S) $3292.2
- — C (S) $5487
- — Z (S) $5487
1926.502 D06 II
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.502(d)(6)(ii): Snaphooks were attached to each other that were incompatibly shaped or dimensioned in relation to the snaphook such that unintentional disengagement could occur by the connected object being able to depress the snaphook keeper and release itself. a) At the jobsite, on the roof, on or about 9/9/16: The employer did not ensure that employees using a fall protection system where snaphooks were attached to each other and not designed for this purpose were protected from unintentional disengagement in the event of loading the system. Abatement certification must be submitted for this item.
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
1926.502 D09
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.502(d)(9): Lanyards and/or vertical lifelines did not have a minimum breaking strength of 5,000 pounds (22.2 kN): a) At the jobsite, on the roof, on or about 9/9/16: The employer did not ensure that employees using a fall protection system where a retractable lanyard was connected to the cross-bracing of a tubular welded frame scaffolding as an anchor point would provide the minimum strength of 5,000 lbs. Abatement certification must be submitted for this item.
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
1926.502 D16 III
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.502(d)(16)(iii): Personal fall arrest systems, when stopping a fall, were not rigged such that an employee could not free fall more than 6 feet (1.8 m) nor contact any lower level: a) At the jobsite, on the roof, on or about 9/9/16: The employer did not ensure that employees using a fall protection system where a retractable lanyard was connected to a lifeline, attached at a single point, would have prevented a free-fall greater than 6 feet if employed. Abatement certification must be submitted for this item.
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
1926.451 E01
- Issued
- Abate by
- Penalty
- Initial $7839.00 · Current $4703.00 Reduced
General-duty citation text
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used: At the jobsite, on the roof, on or about 9/9/16: The employer did not ensure that workers who were accessing a scaffold system did not have to transit approximately 3 feet horizontally and 3 feet vertically. Driscoll Masonry Restoration was previously cited for a violation of this occupational safety and health standard or its equivalent standard 29 CFR 1926.451(e)(1), which was contained in OSHA inspection number 994971, citation number 1, item number 3, and was affirmed as a final order on 10/30/14, with respect to a workplace located at Binghamton Material Handling, 295 Court Street, Binghamton, NY.
Recent events (3)
- — F (R) $4703.4
- — C (R) $7839
- — Z (R) $7839
More inspections in this industry (NAICS 236220)
NEWPORT BEACH, CA—2026-07-16
KPRS CONSTRUCTION SERVICES, INC.
CHANDLER, AZ—2026-07-16
SUN STATE BUILDERS
ROCHESTER HILLS, MI—2026-07-16
ICON RESTORATION SERVICES
WAUSAU, WI—2026-07-16
MIRON CONSTRUCTION CO. INC.
PONCE, PR—2026-07-15
FC CONSTRUCTION LLC
More inspections in NY
MAYVILLE, NY—2026-07-16
MAYVILLE VILLAGE DPW
NEW HYDE PARK, NY—2026-07-16
NORTH HEMPSTEAD TN MICHAEL J TULLY PARK
CONESUS, NY—2026-07-16
CONESUS TN HIGHWAY DEPT
COMSTOCK, NY—2026-07-15
NYSDOCCS WASHINGTON CORRECTIONAL FACILITY
BALDWINSVILLE, NY—2026-07-15
LYSANDER TOWN HIGHWAY DEPARTMENT
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341767655.