NEW ALBANY, OH —
OSHA Inspection: CARLISLE MASONRY CONSTRUCTION, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of CARLISLE MASONRY CONSTRUCTION, INC. in 245 E. MAIN STREET, NEW ALBANY, OH 43054 (NAICS 238140). OSHA activity number 341903797.
Where did this inspection happen?
- Establishment
- CARLISLE MASONRY CONSTRUCTION, INC.
- Site address
- 245 E. MAIN STREET
- City
- NEW ALBANY
- State
- OH
- ZIP
- 43054
- Mailing
- 6300 VAN FOSSEN ROAD, JOHNSTOWN, OH 43031
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 27
- Ownership type
- A
Citations
3 citations on file for this inspection.
1926.451 G04 II
- Issued
- Penalty
- Initial $4770.00 · Current $3339.00 Reduced
General-duty citation text
29 CFR 1926.451(g)(4)(ii): The top edge height of toprails or equivalent member on supported scaffolds manufactured or placed in service after January 1, 2000 shall be installed between 38 inches (0.97 m) and 45 inches (1.2 m) above the platform surface. The top edge height on supported scaffolds manufactured and placed in service before January 1, 2000, and on all suspended scaffolds where both a guardrail and a personal fall arrest system are required shall be between 36 inches (0.9 m) and 45 inches (1.2 m). When conditions warrant, the height of the top edge may exceed the 45-inch height, provided the guardrail system meets all other criteria of paragraph (g)(4). a. On or before November 10, 2016 where employees were working from a scaffold, a 2x4 was used as the only guardrail and was not placed between 38 and 44 inches from the platform surface, thereby exposing the employees to a 17 foot fall hazard.
Recent events (2)
- — I (S) $3339
- — Z (S) $4770
1926.451 G04 IV
- Issued
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.451(g)(4)(iv): When midrails are used, they shall be installed at a height approximately midway between the top edge of the guardrail system and the platform surface. a. On or before November 10, 2016 where employees were working from a scaffold, the midrail was not installed at an even height approximately midway between the top edge of the guardrail system and the platform surface, thereby exposing the employees to a 17 foot fall hazard.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 H02 II
- Issued
- Penalty
- Initial $3816.00 · Current $2671.00 Reduced
General-duty citation text
29 CFR 1926.451(h)(2)(ii): A toeboard shall be erected along the edge of platforms more than 10 feet (3.1 m) above lower levels for a distance sufficient to protect employees below, except on float (ship) scaffolds where an edging of 3/4 x 1 1/2 inch (2 x 4 cm) wood or equivalent may be used in lieu of toeboards. a. On or before November 10, 2016 where employees were working from a scaffold, a toeboard was not installed along the opening where two scaffolds joined, thereby exposing employees below to a struck-by hazard.
Recent events (2)
- — I (S) $2671.2
- — Z (S) $3816
More inspections in this industry (NAICS 238140)
RENO, NV—2026-07-16
DC MASONRY
WINNETKA, IL—2026-07-15
CHICAGO STUCCO CO.
LODI, NJ—2026-07-15
J & O MASONRY CONTRACTORS
DORAVILLE, GA—2026-07-14
SUDLOW CONCRETE, INC.
FLAGLER BEACH, FL—2026-07-14
PLANET DESIGN SERVICES, INC.
More inspections in OH
WELLINGTON, OH—2026-07-16
WHIRLAWAY CORPORATION
WAUSEON, OH—2026-07-16
WATSON WELL DRILLING INC.
SEVEN HILLS, OH—2026-07-15
STONEY ACRES BUILDERS LLC