COLORADO SPRINGS, CO —
OSHA Inspection: DIEGO MARTINEZ
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of DIEGO MARTINEZ in 4806 RUSTY NAIL POINT, COLORADO SPRINGS, CO 80916 (NAICS 238160). OSHA activity number 341925550.
Where did this inspection happen?
- Establishment
- DIEGO MARTINEZ
- Site address
- 4806 RUSTY NAIL POINT
- City
- COLORADO SPRINGS
- State
- CO
- ZIP
- 80916
- Mailing
- 1022 FLORENCE AVE, COLORADO SPRINGS, CO 80905
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238160
- Employees
- 4
- Ownership type
- A
Citations
2 citations on file for this inspection.
1926.102 A01
- Issued
- Abate by
- Penalty
- Initial $2138.00 · Current $1069.00 Reduced
General-duty citation text
29 CFR 1926.102(a)(1): Eye and face protective equipment were not used when machines or operations presented potential eye or face injury from physical, chemical, or radiation agents: (a) On or about November 10, 2016, employees were exposed to eye injury while working with and around pneumatic nail guns without eye protection. Abatement Note: Abatement certification is required for this item (see enclosed "Certification of Corrective Action Worksheet").
Recent events (2)
- — I (S) $1069
- — Z (S) $2138
1926.501 B13
- Issued
- Abate by
- Penalty
- Initial $3741.00 · Current $2131.00 Reduced
General-duty citation text
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b): (a) On or about November 10, 2016, the employer did not did not ensure employees were protected from fall hazards of 21 feet and greater while engaged in residential re-roofing operations. Abatement Note: Abatement certification and documentation is required for this item (see enclosed "Certification of Corrective Action Worksheet").
Recent events (2)
- — I (S) $2131
- — Z (S) $3741
More inspections in this industry (NAICS 238160)
SIOUX FALLS, SD—2026-07-13
H & R ROOFING OF SOUTH DAKOTA, INC.
HENDERSON, NV—2026-07-13
INTEGRITY ROOFING LLC
CORTLANDT MANOR, NY—2026-07-13
LG BUILDERS INC.
CAMDEN, OH—2026-07-13
ALBERTO MORALES
BLOOMINGTON, IL—2026-07-13
UNKNOWN CONTRACTOR
More inspections in CO
CASTLE ROCK, CO—2026-07-10
MASTER MAGNETICS, INC.
STRASBURG, CO—2026-07-08
JUNIOR ROOFING LLC
FORT COLLINS, CO—2026-07-08
EDWARDS SEMICONDUCTOR SOLUTIONS LLC
CENTENNIAL, CO—2026-07-08
JORDY CONSTRUCTION
HIGHLANDS RANCH, CO—2026-07-08
HOWELL CONSTRUCTION
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341925550.