Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,214Inspections Most recent open 2026-07-16 Last loaded 2026-07-20

OSHA Inspection: SPACE ELECTRONICS, LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of SPACE ELECTRONICS, LLC in 81 FULLER WAY, BERLIN, CT 06037 (NAICS 334511). OSHA activity number 341970721.

Watch Space Electronics, LLC — free Get an email when a new federal OSHA severe-injury report for Space Electronics, LLC is published. One employer, no account, unsubscribe in one click.
Site address
81 FULLER WAY
City
BERLIN
State
CT
ZIP
06037
Mailing
81 FULLER WAY, BERLIN, CT 06037
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
334511
Employees
21
Ownership type
A

12 citations on file for this inspection.

1910.23 C01

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $3622.00 · Current $2600.00 Reduced
29 CFR 1910.23(c)(1): Open-sided floors and/or platforms four feet or more above adjacent floor or ground level were not guarded with standard railings (or equivalent) and toeboards:  Note:  Toeboards are only required when persons can pass, there is moving equipment or there is equipment with which falling materials could create a hazard.    A.  On or about December 16, 2016, Electrical Assembly Area:  The front edge of a storage mezzanine above an office area was not provided with a standard guardrail.  The opening measured 8 feet, 9 inches along the face and exposed employees to falls of 9 feet to the concrete floor below.
Recent events (2)
  • — I (S) $2600
  • — Z (S) $3622

1910.37 B02

Serious Gravity 5 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $3622.00 · Current $2000.00 Reduced
29 CFR 1910.37(b)(2): Each exit was not clearly visible and marked by a sign reading "Exit":    A.  On or about December 16, 2016, Main Production Area:  The side-hinged emergency exit door adjacent to the roll-up garage door was not provided with an EXIT sign.
Recent events (2)
  • — I (S) $2000
  • — Z (S) $3622

1910.38 B

Serious Gravity 5 1 instance 21 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.38(b): An emergency action plan was not in writing, kept in the workplace, and available to employees for review:  A.  On or about December 16, 2016, Facility-Wide:  The employer had not developed or implemented an emergency action plan directing employees to either evacuate the building or use portable fire extinguishers in case of emergency.  Portable fire extinguishers were mounted and available for use throughout the production areas.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.212 A03 II

Serious Gravity 5 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $3622.00 · Current $2800.00 Reduced
29 CFR 1910.212(a)(3)(ii): Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s):    A.  On or about December 16, 2016, Main Production Area:  The Do-All metal-cutting band saw had a 7-inch unused portion of the blade which was unguarded, exposing employees to amputation injuries.
Recent events (2)
  • — I (S) $2800
  • — Z (S) $3622

1910.304 G05

Serious Gravity 1 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $2173.00 · Current $2000.00 Reduced
29 CFR 1910.304(g)(5): The path to ground from circuits, equipment, and enclosures was not permanent, continuous, and effective:    A.  On or about December 16, 2016, Electrical Assembly Bench:  A Wel-Bilt metal encased inspection light was not grounded.  The light had a two-wire cord which did not provide a ground, exposing employees to electric shock hazards.
Recent events (2)
  • — I (S) $2000
  • — Z (S) $2173

1910.305 B02 I

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.305(b)(2)(i): Each outlet box in completed installations did not have a cover, faceplate, or fixture canopy   A.  On or about December 16, 2016, Electrical Assembly Area:  A four-receptacle outlet box on the wall behind the electrical assembly bench was missing a faceplate, exposing the live electrical parts.  The outlets were energized and provided power to a blue extension cord, which in turn powered a blue extension cord, which powered a three way splitter, which in turn provided power to an orange extension cord and two relocatable power taps which energized various electrical equipment in the area.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.1200 E01

Serious Gravity 5 1 instance 21 exposed
Issued
Abate by
Penalty
Initial $3622.00 · Current $2000.00 Reduced
29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met:      A.  On or about December 16, 2016, facility-wide:  The employer had not developed or implemented a hazard communication program which provided training to employees on the hazards of the chemicals with which they worked, including:  Petroleum distillate, triethanolamine, isoprpanol, diethanolamine, toluene, methyl ethyl ketone, light aliphatic solvent naphtha, n-Heptane, kerosene and propane, among others.
Recent events (2)
  • — I (S) $2000
  • — Z (S) $3622

1910.303 B02

Serious Gravity 1 5 instances 21 exposed
Issued
Abate by
Penalty
Initial $2173.00 · Current $2500.00
29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling:    A. On or about December 16, 2016, in the following instances, electrical equipment was not used as listed and labeled  1.  Electronic Assembly Area:     a.  A flexible extension cord with a three-way splitter powered a four-outlet relocatable power tap on the ground underneath the electrical assembly bench.  The relocatable power tap was listed to be powered directly through a wall outlet.     b. The three-way splitter also powered a six-outlet relocatable power tap located on the electrical assembly bench.  The power tap was used to energize equipment on the electronic assembly bench.  The relocatable power tap was listed to be powered directly through a wall outlet.      2.  Main Production Area:     a.  A six-outlet Wiremold relocatable power tap was energized through an orange extension cord.  The relocatable power tap was listed to be powered directly through a wall outlet.
Recent events (2)
  • — I (S) $2500
  • — Z (S) $2173

1910.305 G01 IV A

Serious Gravity 1 9 instances 21 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure:    A.  On or about December 16, 2016, in the following instances, flexible extension cords were used in lieu of the fixed wiring of the building:  1.  Electronic Assembly Area:       a.  A blue extension cord was used to power a yellow cordset to a three way splitter.     b. The three-way splitter powered a four-outlet relocatable power tap on the ground underneath the electrical assembly bench, which powered a computer and de-soldering station.     c. The three-way splitter powered an orange extension cord which was available for use.     d.  The three-way splitter powered a six-outlet relocatable power tap on the electrical assembly bench, which powered a laptop computer, charger, inspection lamp, plasma lamp and speaker.     2.  Main Production Area:     a. An orange extension cord was used in lieu of the fixed wiring of the building to energize a Wiremold six-outlet relocatable power tap, which was used to energize a computer and peripherals.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.303 G01 II

Serious Gravity 5 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $2897.00 · Current $0.00 Reduced
29 CFR 1910.303(g)(1)(ii): The required working space about electric equipment rated 600 volts, nominal, or less to ground, was used for storage:    A.  On or about December 16, 2016, Main Production Area:  The work space in front of the 480-V General Electric panelboard, #SW3127, was used for the storage of eight 5-gallon containers of tapping oil.  In case of electrical emergency, access to the electrical panel would be delayed.
Recent events (2)
  • — I (S) $0
  • — Z (S) $2897

1910.22 D01

Other-than-serious 2 instances 10 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.22(d)(1): On every building or other structure, or part thereof, used for mercantile, business, industrial or storage purposes, the loads approved by the building official were not marked on plates of approved design and securely affixed in a conspicuous place in each space to which they relate:  A.  On or about December 16, 2016, in the following locations, mezzanines used for storage were not provided with conspicuous rated capacity plates:  1.  Electrical Assembly Area, above the Executive Vice President of Engineering office.  2.  Main Production Area, near exit to loading dock.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

1910.242 B

Other-than-serious 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.242(b): Compressed air used for cleaning purposes was not reduced to less than 30 p.s.i.:   A.  On or about December 16, 2016, Main Production Area:  Near the Craftsman 1/3 HP grinder, compressed air used for cleaning was measured at 40 p.s.i..
Recent events (2)