OSHA Inspection: FORCIER CONTRACTING AND BUILDING SERVICES, INC.

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of FORCIER CONTRACTING AND BUILDING SERVICES, INC. in 33 PINE STREET, NASHUA, NH 03060 (NAICS 238130). OSHA activity number 342059409.

Watch Forcier Contracting AND Building Services, INC. — free Get an email when a new federal OSHA severe-injury report for Forcier Contracting AND Building Services, INC. is published. One employer, no account, unsubscribe in one click.
Site address
33 PINE STREET
City
NASHUA
State
NH
ZIP
03060
Mailing
32 WILLIAMS ST., NASHUA, NH 03060
Inspection type
Referral (C)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238130
Employees
9
Ownership type
A

4 citations on file for this inspection.

5(a)(1)

Serious Gravity 10 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $3803.00 · Current $3803.00
OSH ACT of 1970 Section (5)(a)(1): Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which was free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to struck by and caught between hazards associated with the installation of inadequately braced prefabricated roof trusses:       (a) Site- Employees were exposed to struck by and caught between hazards when prefabricated wood roof trusses collapsed due to not being adequately braced during installation.
Recent events (2)
  • — I (S) $3803
  • — Z (S) $3803

1926.451 B01

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $2716.00 · Current $1358.00 Reduced
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii)    (a) Jobsite - The carpenter bracket scaffolding was not fully planked.
Recent events (2)
  • — I (S) $1358
  • — Z (S) $2716

1926.502 D18

Serious Gravity 5 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $2716.00 · Current $1358.00 Reduced
29 CFR 1926.502(d)(18): body belts, harnesses and/or components of a personal fall arrest system were used for hoisting materials.    (a) Jobsite - A rope lifeline was used a s a tag line.
Recent events (2)
  • — I (S) $1358
  • — Z (S) $2716

1926.1430 B

Serious Gravity 5 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $2716.00 · Current $0.00 Reduced
29 CFR 1926.1430(b): The employer did not train employees in the signal qualifications.    (a) Jobsite - Employees were not trained in signaling the crane.
Recent events (2)
  • — I (S) $0
  • — Z (S) $2716

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342059409.