CALDWELL, ID —
OSHA Inspection: DMG MORI NEW WEST
Unprogrammed Other inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Other safety inspection of DMG MORI NEW WEST in 1312 INDUSTRIAL WAY, CALDWELL, ID 83605 (NAICS 811310). OSHA activity number 342184421.
Where did this inspection happen?
- Establishment
- DMG MORI NEW WEST
- Site address
- 1312 INDUSTRIAL WAY
- City
- CALDWELL
- State
- ID
- ZIP
- 83605
- Mailing
- 7990 SOUTH 1530 WEST, WEST JORDAN, UT 84088
What kind of inspection was it?
- Inspection type
- Unprogrammed Other (I)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 811310
- Employees
- 1
- Ownership type
- A
Citations
3 citations on file for this inspection.
1910.147 D04 I
- Issued
- Abate by
- Penalty
- Initial $7243.00 · Current $3622.00 Reduced
General-duty citation text
29 CFR 1910.147(d)(4)(i): Lockout or tagout devices were not affixed to each energy isolating device by authorized employees. a) On or about March 7, 2017 or prior there to, on NMW-C, Vertical 5-axis Mill: DMG Mori New West employees did not utilize energy control procedures before servicing the control mechanism of the Mill. Power was disengaged prior to maintenance activities by turning a rotational power switch without utilizing a lock out mechanism. NOTE: Abatement certification is required for this item.
Recent events (2)
- — I (S) $3621.5
- — Z (S) $7243
1910.147 F02 I
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.147(f)(2)(i): Outside servicing personnel were engaged in activities covered by the scope and application of this standard, and the on-site employer and the outside employer did not inform each other of their respective lockout or tagout procedures. a) On or about March 7, 2017 or prior there to, on NMW-C, Vertical 5-axis Mill: The outside servicing employer, DMG Mori New West, did not review energy control procedures with Quality Machine Products before servicing the control mechanism of the Mill. Power was disengaged by the contractor prior to maintenance activities by turning a rotational power switch without a lock out mechanism. NOTE: Abatement certification is required for this item.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.333 B02
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.333(b)(2): Employees were exposed to contact with parts of fixed electric equipment or circuits which were de-energized, and the circuits energizing the parts were not locked out or tagged or both in accordance with the requirements of this paragraph. a) On or about March 7, 2017 or prior there to, on NMW-C, Vertical 5-axis Mill: DMG Mori New West employees did not utilize energy control procedures before servicing the control mechanism of the Mill. Power was disengaged prior to maintenance activities by turning a rotational power switch without utilizing a lock out mechanism. NOTE: Abatement certification is required for this item.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections in this industry (NAICS 811310)
CHRISTIANSBURG, VA—2026-07-09
BGIS GLOBAL INTEGRATED SOLUTION US, LLC
SEATTLE, WA—2026-07-09
WA317992010 - FLAGSHIP MANAGEMENT LLC
STATESBORO, GA—2026-07-08
TAYLOR BUILT PRODUCTS
, AK—2026-07-08
ANGUS ENTERPRISES
LOS ANGELES, CA—2026-07-08
CHILLEST INDUSTRIES LLC
More inspections in ID
BOISE, ID—2026-07-16
RAYMOND MANAGEMENT COMPANY
MERIDIAN, ID—2026-07-15
TRIPLE R CONSTRUCTION LLC
MERIDIAN, ID—2026-07-15
MIRZON CONSTRUCTION LLC
MERIDIAN, ID—2026-07-15
EASTER SEALS - GOODWILL NORTHERN ROCKY MOUNTAINS
NAMPA, ID—2026-07-15
ELITE STEEL ERECTORS, LLC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342184421.