CHICAGO, IL —
OSHA Inspection: MARTEL GENERAL CONSTRUCTION
Planned inspection · Health discipline
At a glance
On , OSHA opened a planned health inspection of MARTEL GENERAL CONSTRUCTION in 6478 N. NORTHWEST HIGHWAY, CHICAGO, IL 60631 (NAICS 238140). OSHA activity number 342572476.
Where did this inspection happen?
- Establishment
- MARTEL GENERAL CONSTRUCTION
- Site address
- 6478 N. NORTHWEST HIGHWAY
- City
- CHICAGO
- State
- IL
- ZIP
- 60631
- Mailing
- 147 CRESCENT DR., GLENVIEW, IL 60025
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 5
- Ownership type
- A
Citations
8 citations on file for this inspection.
1910.134 E01
- Issued
- Penalty
- Initial $2173.00 · Current $2173.00
9010
General-duty citation text
29 CFR 1926.103: NOTE: The requirements applicable to construction work under this section are identical to those set forth at 29 CFR 1910.134 of this chapter. 29 CFR 1910.134(e)(1): The employer did not provide a medical evaluation to determine the employee's ability to use a respirator, before the employee was fit tested or required to use the respirator in the workplace: a) 6478 N. Northwest Highway, Chicago, IL 60631 - On August 23, 2017, Martel General Construction did not provide a medical evaluation to an employee required to use a 3M full-face respirator when using a saw to remove brick mortar from a residential building. No abatement certification or documentation is required for this item.
Recent events (1)
- — Z (S) $2173
1910.134 F02
- Issued
- Penalty
- Initial $0.00 · Current $0.00
9010
General-duty citation text
29 CFR 1926.103: NOTE: The requirements applicable to construction work under this section are identical to those set forth at 29 CFR 1910.134 of this chapter. 29 CFR 1910.134(f)(2): Employee(s) using tight-fitting facepiece respirators were not fit tested prior to initial use of the respirator: a) 6478 N. Northwest Highway, Chicago, IL 60631 - On August 23, 2017, Martel General Construction did not provide a fit test to an employee required to use a 3M full-face respirator when using a saw to remove brick mortar from a residential building. No abatement certification or documentation is required for this item.
Recent events (1)
- — Z (S) $0
1910.134 K01
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
9010
General-duty citation text
29 CFR 1926.103: NOTE: The requirements applicable to construction work under this section are identical to those set forth at 29 CFR 1910.134 of this chapter. 29 CFR 1910.134(k)(1): The employer did not provide respirator training that would ensure each employee could demonstrate knowledge of items in section (i)-(vii): a) 6478 N. Northwest Highway, Chicago, IL 60631 - On August 23, 2017, Martel General Construction did not provide training to an employee required to use a 3M full-face respirator when using a saw to remove brick mortar from a residential building. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
- — Z (S) $0
1910.1200 E01
- Issued
- Abate by
- Penalty
- Initial $1630.00 · Current $1630.00
9010
General-duty citation text
29 CFR 1926.59: NOTE: The requirements applicable to construction work under this section are identical to those set forth at 29 CFR 1910.1200 of this chapter. 29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met: a) Martel General Construction did not develop or implement a written hazard communication program in accordance with 29 CFR 1910.1200(e)(1) that would describe or include at least the following: 1) Requirement for labeling and other forms of warning; 2) Safety data sheet availability; 3) Employee information and training; 4) A list of hazardous chemicals known to be present in the workplace; 5) Methods to inform employees of the hazards on non-routine tasks; and 6) Methods to provide other employer(s) access to safety data sheet; information on any precautionary measures and the labeling system used in the workplace. 6478 N. Northwest Highway, Chicago, IL 60631 - On August 23, 2017, employees were exposed to a hazardous chemical, crystalline silica, when using a saw to remove brick mortar and during brick laying activities on a residential building. Crystalline silica was a component of the mortar being cut and the Brixment i.pro masonry cement being used at the worksite. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
- — Z (S) $1630
1910.1200 G01
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
9010
General-duty citation text
29 CFR 1926.59: NOTE: The requirements applicable to construction work under this section are identical to those set forth at 29 CFR 1910.1200 of this chapter. 29 CFR 1910.1200(g)(1): Employer did not have a safety data sheet in the workplace for each hazardous chemical which they use: a) 6478 N. Northwest Highway, Chicago, IL 60631 - On August 23, 2017, Martel General Construction did not ensure that a Safety Data Sheet (SDS) for each hazardous chemical that employees were exposed to was available in the workplace. Employees were exposed to crystalline silica when using a saw to remove brick mortar and during brick laying activities on a residential building. The employer did not have a SDS for crystalline silica, a component of the mortar being removed and the Brixment i.pro masonry cement being used at the worksite. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
- — Z (S) $0
1910.1200 H01
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
9010
General-duty citation text
29 CFR 1926.59: NOTE: The requirements applicable to construction work under this section are identical to those set forth at 29 CFR 1910.1200 of this chapter. 29 CFR 1910.1200(h)(1): Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area: (a) On August 23, 2017, Martel General Construction did not provide information and training to employees exposed to a hazardous chemical, crystalline silica, which was a component of the brick mortar being removed and masonry cement being used at the worksite. (b) On August 23, 2017, Martel General Construction did not provide training to employees by December 1, 2013 on the revised Safety Data Sheet format and content, as well as the new labeling elements as required by the revised hazard communication standard 29 CFR 1910.1200. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
- — Z (S) $0
1926.451 B01
- Issued
- Penalty
- Initial $3803.00 · Current $3803.00
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): a) 6478 N. Northwest Highway, Chicago, IL 60631 - On August 23, 2017, Martel General Construction employees were exposed to the hazard of falling up to approximately 30 feet to the ground while performing masonry work from tubular welded frame scaffold platforms that were not fully planked. No abatement certification or documentation is required for this item.
Recent events (1)
- — Z (S) $3803
1926.451 G01
- Issued
- Penalty
- Initial $3803.00 · Current $3803.00
General-duty citation text
29 CFR 1926.451(g)(1): Employees on scaffolds more than 10 feet (3.1 m) above a lower level were not protected from falling to that lower level by fall protection established in paragraphs (g)(1)(i)-(vii) of this section: a) 6478 N. Northwest Highway, Chicago, IL 60631 - On August 23, 2017, Martel General Construction employees were exposed to the hazard of falling while performing masonry work from tubular welded frame scaffold platforms elevated up to approximately 30 feet above the ground. No abatement certification or documentation is required for this item.
Recent events (1)
- — Z (S) $3803
More inspections in this industry (NAICS 238140)
RENO, NV—2026-07-16
DC MASONRY
WINNETKA, IL—2026-07-15
CHICAGO STUCCO CO.
LODI, NJ—2026-07-15
J & O MASONRY CONTRACTORS
DORAVILLE, GA—2026-07-14
SUDLOW CONCRETE, INC.
FLAGLER BEACH, FL—2026-07-14
PLANET DESIGN SERVICES, INC.
More inspections in IL
DEERFIELD, IL—2026-07-16
JOHN BURNS CONSTRUCTION COMPANY, LLC
BANNOCKBURN, IL—2026-07-16
BUILDER SERVICES GROUP, INC. DBA CJ INSULATION
BANNOCKBURN, IL—2026-07-16
ROOFING H.P. LLC
HIGHLAND PARK, IL—2026-07-16
UNITED PLUMBING AND DRAIN, INC.
FRANKLIN PARK, IL—2026-07-16
B & M PLASTIC INC.
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342572476.