OSHA Inspection: FORTE BUILDERS CO.

Unprogrammed Related inspection · Safety discipline

On , OSHA opened an unprogrammed Related safety inspection of FORTE BUILDERS CO. in 1462 WOLFF ST., DENVER, CO 80204 (NAICS 236116). OSHA activity number 342639895.

Watch Forte Builders CO. — free Get an email when a new federal OSHA severe-injury report for Forte Builders CO. is published. One employer, no account, unsubscribe in one click.
Establishment
FORTE BUILDERS CO.
Site address
1462 WOLFF ST.
City
DENVER
State
CO
ZIP
80204
Mailing
2200 E. 104TH AVE. SUITE 107, THORNTON, CO 80233
Inspection type
Unprogrammed Related (G)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236116
Employees
4
Ownership type
A

1 citation on file for this inspection.

1926.416 A03

Other-than-serious 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $2173.00 · Current $1500.00 Reduced
29 CFR 1926.416(a)(3): Before work began, the employer did not ascertain by inquiry, direct observation, or by instruments, whether any part of an energized electric power circuit, exposed or concealed, was so located that the performance of the work could bring any person, tool, or machine into physical or electrical contact with the electric power circuit:    (a)  Forte Builders, Co. at 1462 Wolff St., Denver, CO 80204:  On and before September 7, 2017, before work began, the controlling employer did not ascertain by inquiry, direct observation, or by instruments whether any part of an energized electrical circuit, exposed or concealed, was so located that the performance of the work could bring any person, tool, or machine into physical or electrical contact with the electrical power circuit.  The employer did not ensure that framing subcontractor employees maintained a safe approach distances when conducting framing activities in close proximity to energized overhead power lines.  Xcel Energy confirmed that the overhead power lines were in close proximity to the building under construction and were energized to 7,620 (phase to ground).  This condition exposed employees to electrical shock hazards.
Recent events (2)
  • — I (O) $1500
  • — Z (S) $2173

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342639895.