OSHA Inspection: POLYCHEM CORPORATION

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of POLYCHEM CORPORATION in 6277 HEISLEY RD, MENTOR, OH 44060 (NAICS 326112). OSHA activity number 342684883.

Watch Polychem Corporation — free Get an email when a new federal OSHA severe-injury report for Polychem Corporation is published. One employer, no account, unsubscribe in one click.
Site address
6277 HEISLEY RD
City
MENTOR
State
OH
ZIP
44060
Mailing
6277 HEISLEY RD, MENTOR, OH 44060
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
326112
Employees
400
Ownership type
A

7 citations on file for this inspection.

1910.147 C05 II C 1

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $7244.00 · Current $4709.00 Reduced
29 CFR 1910.147(c)(5)(ii)(C)(1): Lockout devices. Lockout devices shall be substantial enough to prevent removal without the use of excessive force or unusual techniques, such as with the use of bolt cutters or other metal cutting tools.    On or about October 5, 2017, the employer did not ensure the lockout device, known as a winder fork, used to isolate the electrical power from the drive chain and sprockets of the Line 10 winders was substantial enough to prevent removal while line operators were conducting setup and changeover of the Line 10 winder machines.
Recent events (2)
  • — I (S) $4709
  • — Z (S) $7244

1910.147 D

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.147(d): Application of control. The established procedures for the application of energy control (the lockout or tagout procedures) shall cover the following elements and actions and shall be done in the following sequence:   On or about October 5, 2017, the employer did not ensure their written energy control procedure for conducting setup and changeover of the winder machines covered all of the elements for the application of hazardous energy control.  The procedure did not ensure energy isolating device operated in such a manner as to isolate the equipment from the energy source (electrical power) [per the 1910.147(d)(3) requirements], employees affixed a lockout device to the electrical energy isolation device [(d)(4)], and verified the isolation and deenergization of the machine had been accomplished [(d)(6)].
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.147 C06 I

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $7244.00 · Current $4709.00 Reduced
29 CFR 1910.147(c)(6)(i): The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed.    On or about October 5, 2017, the employer did not conduct and/or certify an annual periodic inspection of energy control procedures and requirements of the standard were being followed by line operator employees when conducting winder setup and changeover activities.
Recent events (2)
  • — I (S) $4709
  • — Z (S) $7244

1910.219 C04 I

Serious Gravity 5 10 instances 1 exposed
Issued
Abate by
Penalty
Initial $10864.00 · Current $5000.00 Reduced
29 CFR 1910.219(c)(4)(i): Projecting shaft ends shall present a smooth edge and end and shall not project more than one-half the diameter of the shaft unless guarded by nonrotating caps or safety sleeves.    On or about October 5, 2017, the employer did not ensure the mandrel lock projecting from the end of the Line 10 winder shafts was guarded.
Recent events (3)
  • — F (S) $5000
  • — C (S) $10864
  • — Z (S) $10864

1910.305 A02 X

Serious Gravity 1 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $5432.00 · Current $3530.00 Reduced
29 CFR 1910.305(a)(2)(x): Flexible cords and cables shall be protected from accidental damage, as might be caused, for example, by sharp corners, projections, and doorways or other pinch points.    On or about October 5, 2017, the 110/120 volt flexible cord powering the bag sealer machine was not protected from accidental damage by sharp corners of packaging material and side of the machine or other pinch points.  The outer covering (insulation) of the flexible cable was broken exposing the live conductors inside.
Recent events (2)
  • — I (S) $3530
  • — Z (S) $5432

1910.22 A01

Other-than-serious 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.22(a)(1): (1) All places of employment, passageways, storerooms, service rooms, and walking-working surfaces are kept in a clean, orderly, and sanitary condition.  On or about October 5, 2017, the employer did not ensure the floor, passageways and walking working surfaces between the Line 10 winders, Line 9 winders, and shrink oven were kept in a clean and orderly condition.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

1910.22 A02

Other-than-serious 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.22(a)(2): (2) The floor of each workroom is maintained in a clean and, to the extent feasible, in a dry condition.  When wet processes are used, drainage must be maintained and, to the extent feasible, dry standing places, such as false floors, platforms, and mats must be provided.    On or about October 5, 2017, the employer did not ensure the floor and walkway area next to the line 10 was being maintained in a clean and dry condition.