Safety Incidents OSHA Severe Injury Reports · 2015–2025
4,113,118Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: JOHN WALL

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of JOHN WALL in 746 WILLOUGHBY WAY, ATLANTA, GA 30312 (NAICS 238990). OSHA activity number 342716917.

Watch John Wall — free Get an email when a new federal OSHA severe-injury report for John Wall is published. One employer, no account, unsubscribe in one click.
Establishment
JOHN WALL
Site address
746 WILLOUGHBY WAY
City
ATLANTA
State
GA
ZIP
30312
Mailing
3959 ORCHARD ROAD, SE, SMYRNA, GA 30080
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238990
Employees
1
Ownership type
A

3 citations on file for this inspection.

1926.21 B02

Serious Gravity 1 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $1630.00 · Current $1630.00
29 CFR 1926.21(b)(2): The employer did not instruct each employee in the recognition and avoidance of unsafe conditions and the regulations applicable to his/her environment to control or eliminate any hazards or other exposure to illness or injury:    (a) The Willoughby Office Building, East side: On or about 10/20/2017, and at times prior, the employer did not provide training to each employee performing work on an aerial lift, in that the employer failed to provide fall protection PPE needed while performing work within the aerial lift basket. The employee was not trained to recognize the unsafe conditions while using this equipment.
Recent events (3)
  • — A (S) $1630
  • — I (S) $978
  • — Z (S) $1630

1926.454 A

Serious Gravity 1 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards:   (a) The Willoughby Office Building, East side: On or about 10/20/2017, and at times prior, the employer did not provide training to each employee performing work on an aerial lift, in that the employer failed to provide fall protection PPE needed while performing work within the aerial lift basket. The employee was not trained to recognize the unsafe conditions while using this equipment.
Recent events (3)
  • — A (S) $0
  • — I (S) $0
  • — Z (S) $0

1926.453 B02 V

Serious Gravity 5 1 instance 2 exposed
Issued
Penalty
Initial $2716.00 · Current $1630.00 Reduced
29 CFR 1926.453(b)(2)(v): A body belt with lanyard attached to the boom or basket was not worn by employee(s) working from an aerial lift:    (a) The Willoughby Office Building, East side: On or about 10/20/2017, and at times prior, the employer exposed employees to ejection/fall hazards of over 12-feet, in that personal fall arrest protection was not provided to TYVEK House Wrap installers working from an aerial lift basket.
Recent events (2)
  • — I (S) $1629.6
  • — Z (S) $2716

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342716917.