Safety Incidents OSHA Severe Injury Reports · 2015–2025
4,113,118Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: JOSE RENIERY MARTINEZ

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of JOSE RENIERY MARTINEZ in 4460 ALISTER PARK DRIVE LOT 277, CUMMING, GA 30040 (NAICS 238140). OSHA activity number 342957917.

Watch Jose Reniery Martinez — free Get an email when a new federal OSHA severe-injury report for Jose Reniery Martinez is published. One employer, no account, unsubscribe in one click.
Site address
4460 ALISTER PARK DRIVE LOT 277
City
CUMMING
State
GA
ZIP
30040
Mailing
2281 PLASTER ROAD APT 9, ATLANTA, GA 30345
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
4
Ownership type
A

9 citations on file for this inspection.

1903.19 C01

Other-than-serious 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $1037.00 · Current $1037.00
29 CFR 1903.19(c)(1): The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated:  a) On or about July 23, 2018, the employer failed to submit certification of corrective action for citation 1, items 1-7,  issued on 04/062018, with an abatement due date of 05/02/2018.
Recent events (1)
  • — Z (O) $1037

1903.19 D01

Other-than-serious 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $1037.00 · Current $1037.00
29 CFR 1903.19(d)(1): The employer did not submit to the Agency documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required.  a) On or about July 23, 2018, the employer failed to submit documentation and certification of corrective action for citation 1, items 1-7,  issued on 04/062018, with an abatement due date of 05/02/2018.
Recent events (1)
  • — Z (O) $1037

1926.25 A

Serious Gravity 5 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $2217.00 · Current $2217.00
29 CFR 1926.25(a): During the course of construction, alteration, or repairs,  debris was not kept cleared from work areas, passageways, and stairs, in and around buildings or other structures:  On or about February 14, 2018, at 4460 Allister Park Drive, Cumming, Georgia:  Four employees performing masonry work were exposed to trip, fall, and impalement hazards from brick shards and scrap lumber when the employer did not remove the debris left on the ground around the house and tubular welded frame scaffold while employees were engaged in construction activities.
Recent events (1)
  • — Z (S) $2217

1926.100 A

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $2217.00 · Current $2217.00
29 CFR 1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets:  On or about February 14, 2018, at 4460 Allister Park Drive, Cumming, Georgia:  Two employees performing masonry work were exposed to struck-by hazards from falling bricks and tools of employee working above them from a porch roof and scaffold when they worked beneath those employees without wearing hard hats.
Recent events (1)
  • — Z (S) $2217

1926.451 B01

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $2772.00 · Current $2772.00
29 CFR 1926.451(b)(1): Where the employer made a demonstration that a space wider than 1 inch was necessary between adjacent plank units and the platform and uprights, the platform was not planked or decked as fully as possible:  On or about February 14, 2018, at 4460 Allister Park Drive, Cumming, Georgia:  An employee performing masonry work was exposed to a fall hazard of approximately 7-feet when the work platform of the tubular welded frame scaffold was not fully planked.
Recent events (1)
  • — Z (S) $2772

1926.451 C02

Serious Gravity 5 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $2772.00 · Current $2772.00
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames,  or uprights did not bear on base plates, mud sills or other adequate firm foundation:  On or about February 14, 2018, at 4460 Allister Park Road, Cumming, Georgia:  Four employees performing masonry work were exposed to a fall hazard of approximately 11.3-feet while working from a tubular welded frame scaffold that did not have mud sills installed under each of the scaffold poles.
Recent events (1)
  • — Z (S) $2772

1926.451 E01

Serious Gravity 5 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $2772.00 · Current $2772.00
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used.  Cross braces were used as a means of access:  On or about February 14, 2018, at 4460 Allister Park Drive, Cumming, Georgia:  Four employees performing masonry work were exposed to fall hazards of approximately 11.3-feet and greater while climbing the frame of a tubular welded frame scaffold because the employer did not install a ladder.
Recent events (1)
  • — Z (S) $2772

1926.451 H01

Serious Gravity 5 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $2217.00 · Current $2217.00
29 CFR 1926.451(h)(1): Each employee on a scaffold was not provided with additional protection from falling hand tools, debris, and other small objects through the installation of toeboards, screens, guardrail systems, or through the erection of debris nets, catch platforms, or canopy structures that contain or deflect the falling objects.  For falling objects too large, heavy or massive to be contained or deflected, the employer did not place and secure such potential falling objects away from the edge of the surface from which they could fall:  On or about February 14, 2018, at 4460 Allister Park Drive, Cumming, Georgia:  Three employees performing masonry work were exposed to struck-by hazards from falling bricks and tools of the employees working above them from the work platforms of a tubular welded frame scaffold that did not have toe boards installed.
Recent events (1)
  • — Z (S) $2217

1926.501 B13

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $2772.00 · Current $2772.00
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b):   On or about February 14, 2018, at 4460 Allister Park Road, Cumming, Georgia:  An employee performing masonry work was exposed to a fall hazard of approximately 12.3-feet when he worked from the porch roof without using fall protection.
Recent events (1)
  • — Z (S) $2772

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342957917.