Safety Incidents OSHA Severe Injury Reports · 2015–2025
2,004,209Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: GUGLY, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of GUGLY, INC. in 1 LAKE ST., OAK PARK, IL 60302 (NAICS 238130). OSHA activity number 342997111.

Watch Gugly, INC. — free Get an email when a new federal OSHA severe-injury report for Gugly, INC. is published. One employer, no account, unsubscribe in one click.
Establishment
GUGLY, INC.
Site address
1 LAKE ST.
City
OAK PARK
State
IL
ZIP
60302
Mailing
408 N. AUSTIN AVE., OAK PARK, IL 60302
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238130
Employees
4
Ownership type
A

12 citations on file for this inspection.

1926.20 B01

Serious Gravity 10 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $3880.00 · Current $2095.00 Reduced
29 CFR 1926.20(b)(1):  The employer did not initiate or maintain an accident prevention program(s) as may be necessary to comply with this part:     a)  On or about March 7, 2018, the employer did not maintain programs to provide for compliance with the OSH Act to control or minimize the safety and health hazards associated with the construction work that his employees are required to perform.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $2095
  • — Z (S) $3880

1926.20 B02

Serious Gravity 10 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.20(b)(2): The employer did not initiate and maintain programs which provided for frequent and regular inspections of the job site, materials and equipment to be made by a competent person(s):  a)  On or about March 7, 2018, the employer did not initiate a program which provided for frequent and regular inspections of the job site by a competent person.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.21 B02

Serious Gravity 10 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.21(b)(2): The employer did not instruct each employee in the recognition and avoidance of unsafe conditions and the regulations applicable to his/her environment to control or eliminate any hazards or other exposure to illness or injury:  a) On or about March 7, 2018, the employer did not instruct each employee in the recognition and avoidance of unsafe conditions and the applicable regulations or how to control or eliminate any hazards associated with the work being performed.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.503 A01

Serious Gravity 10 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.503(a)(1):  The employer did not provide a training program for each employee potentially exposed to fall hazards to enable each employee to recognize the hazards of falling and the procedures to be followed in order to minimize these hazards:  a)  On or about March 7, 2018, employees were exposed to fall hazards while performing carpentry work and the employer did not provide a training program to recognize fall hazards and the procedures to be followed in order to minimize those hazards.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.403 I02 I

Serious Gravity 10 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $3880.00 · Current $2095.00 Reduced
29 CFR 1926.403(i)(2)(i):  Live parts of electric equipment operating at 50 volts or more were not guarded against accidental contact by cabinets or other forms of enclosures, nor by any of the means listed in subparagraphs (A) through (D) of this paragraph:      a)  On March 7, 2018, employees were exposed to electrical shock from unguarded live wires.      In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $2095
  • — Z (S) $3880

1926.405 B01

Serious Gravity 10 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.405(b)(1): Conductors entering boxes, cabinets, and fittings were not protected from abrasion:  a)  On March 7, 2018, employees were exposed electrical shock where live conductors were not protected from abrasion when entering boxes and cabinets.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.405 G02 III

Serious Gravity 10 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.405(g)(2)(iii): Flexible cords were not used in continuous lengths without splice or tap:  a)  On March 7, 2018, employees were exposed to electrical shock where flexible cords were spliced together and not protected.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.405 A02 II E

Serious Gravity 10 1 instance 3 exposed
Issued
Penalty
Initial $3880.00 · Current $2095.00 Reduced
29 CFR 1926.405(a)(2)(ii)(E):  Lamps used in temporary wiring for general illumination were not protected from accidental contact or breakage:      a)  On March 7, 2018, the employer did not ensure that the lamps used in temporary wiring to illuminate the work area were protected from accidental contact or breakage.      No abatement certification or documentation is required for this item.
Recent events (2)
  • — I (S) $2095
  • — Z (S) $3880

1926.405 A02 II F

Serious Gravity 10 1 instance 3 exposed
Issued
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.405(a)(2)(ii)(F): Temporary lights were suspended by their electric cords when such lights and cords were not designed for suspension:  a)  On March 7, 2018, the employer did not ensure that temporary lights were suspended by cords designed for such use.  No abatement certification or documentation is required for this item.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.405 A02 II J

Serious Gravity 10 1 instance 3 exposed
Issued
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.405(a)(2)(ii)(J): Flexible cords used with temporary and portable lights were not designed for hard or extra-hard usage:  a)  On March 7, 2018, the employer did not ensure that flexible cords used with temporary lighting were designed for extra hard use.  No abatement certification or documentation is required for this item.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.501 B01

Serious Gravity 10 1 instance 3 exposed
Issued
Penalty
Initial $3880.00 · Current $2095.00 Reduced
29 CFR 1926.501(b)(1):  Each employee on a walking/working surface with an unprotected side or edge which was 6 feet (1.8 m) or more above a lower level was not protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems:      a)  On March 7, 2018, employees performing masonry work were exposed to fall hazards of approximately 10 feet.      No abatement certification or documentation is required for this item.
Recent events (2)
  • — I (S) $2095
  • — Z (S) $3880

1926.1052 C01 II

Serious Gravity 5 1 instance 3 exposed
Issued
Penalty
Initial $2772.00 · Current $1420.00 Reduced
29 CFR 1926.1052(c)(1)(ii): Stairways having four or more risers or rising more than 30 inches (76 cm), whichever is less, were not equipped with at least one stairrail system along each unprotected side or edge:    a)  On March 7, 2018, employees were accessing the upper floors of the building by way of stairways that did not have a stairrail system along the unprotected side.    No abatement certification or documentation is required for this item.
Recent events (2)
  • — I (S) $1420
  • — Z (S) $2772

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342997111.