Safety Incidents OSHA Severe Injury Reports · 2015–2025
4,113,118Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: DONE RIGHT ROOFING, INC.

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of DONE RIGHT ROOFING, INC. in CLAREMONT MIDDLE SCHOOL 107 S. ST., CLAREMONT, NH 03743 (NAICS 238160). OSHA activity number 343369666.

Watch Done Right Roofing, INC. — free Get an email when a new federal OSHA severe-injury report for Done Right Roofing, INC. is published. One employer, no account, unsubscribe in one click.
Site address
CLAREMONT MIDDLE SCHOOL 107 S. ST.
City
CLAREMONT
State
NH
ZIP
03743
Mailing
13 PINE HILL RD., ASHLAND, MA 01721
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238160
Employees
6
Ownership type
A

2 citations on file for this inspection.

1926.501 B11

Deleted Serious Gravity 10 5 instances 5 exposed
Issued
Penalty
Initial $3880.00 · Current $0.00 Reduced
29 CFR 1926.501(b)(11): Each employee on a steep roof with unprotected sides and edges 6 feet (1.8 m) or more above lower levels was not protected from falling by guardrail systems with toeboards, safety net systems or personal fall arrest systems:   a. Site - On or about July 31, 2018, employees engaged in roofing activities were not utilizing fall protection and were exposed to falls of over 20 feet.
Recent events (2)
  • — I (S) $0
  • — Z (S) $3880

1926.1053 B01

Deleted Serious Gravity 10 3 instances 5 exposed
Issued
Penalty
Initial $3880.00 · Current $0.00 Reduced
29 CFR 1926.1053(b)(1): Where portable ladders were used for access to an upper landing surface and the ladder's length allows, the ladder side rails did not extend at least 3 feet (.9 m) above the upper landing surface being accessed:  Instance a. Site - On or about July 31, 2018, the Werner 24 foot extension ladder utilized by employees to access the roof area did not extend 3 feet above the upper landing surface.  Instance b. Site - On or about July 31, 2018, the 16 foot extension ladder utilized by employees to access the roof area did not extend 3 feet above the upper landing surface.  Instance c. Site - On or about July 31, 2018, the 30 foot extension ladder utilized by employees to access the upper roof area did not extend 3 feet above the upper landing surface.
Recent events (2)
  • — I (S) $0
  • — Z (S) $3880

View DONE RIGHT ROOFING, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343369666.