Safety Incidents OSHA Severe Injury Reports · 2015–2025
2,004,209Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: PINO'S CONSTRUCTION CORPORATION

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of PINO'S CONSTRUCTION CORPORATION in 1835 ONTARIO PLACE, NW, WASHINGTON, DC 20009 (NAICS 238110). OSHA activity number 343406187.

Watch Pino'S Construction Corporation — free Get an email when a new federal OSHA severe-injury report for Pino'S Construction Corporation is published. One employer, no account, unsubscribe in one click.
Site address
1835 ONTARIO PLACE, NW
City
WASHINGTON
State
DC
ZIP
20009
Mailing
6820 ANNAPOLIS ROCK ROAD, WOODBINE, MD 21797
Inspection type
Referral (C)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238110
Employees
8
Ownership type
A

9 citations on file for this inspection.

1926.21 B02

Serious Gravity 1 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $1663.00 · Current $1000.00 Reduced
29 CFR 1926.21(b)(2): The employer did not instruct each employee in the recognition and avoidance of unsafe conditions and the regulations applicable to his/her environment to control or eliminate any hazards or other exposure to illness or injury:    a) Job Site - The employer failed to provide training where employee's were exposed to hazards such as a lack of cave-in protection for an employee in an excavation, damaged flexible cords, and a lack of ground fault circuit interrupters, on or about 08/20/2018.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (2)
  • — I (S) $1000
  • — Z (S) $1663

1926.403 B02

Serious Gravity 1 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $1663.00 · Current $1000.00 Reduced
29 CFR 1926.403(b)(2): Listed, labeled, or certified equipment was not installed and used in accordance with instructions included in the listing, labeling, or certification:    a) Basement Level - Employee was using an extension cord plugged into a 4-way electrical outlet that was hanging by its conductors to supply power to a Milwaukee Rotary Hammer Drill, serial number 5316-20, 110 volt, 15 amp service, on or about 08/20/2018.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (2)
  • — I (S) $1000
  • — Z (S) $1663

1926.404 B01 I

Serious Gravity 1 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.404(b)(1)(i): Employer did not use either ground fault circuit interrupters as specified in paragraph (b)(1)(ii) of this section, or an assured equipment grounding conductor program as specified in paragraph (b)(1)(iii) of this section to protect employees on construction sites:  a) Exterior Front of Row House - An employee was using a temporary electrical outlet to provide power to a Milwaukee portable electric rotary drill, model 1-9/16", serial number 5316-20 and a ground fault circuit interrupter was not provided, 110v/15amp service, on or about 08/20/2018.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.405 B02

Serious Gravity 1 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.405(b)(2): In energized installations, each outlet box did not have a cover, faceplate, or fixture canopy:  a) Basement Level - An employee was using a 4 way outlet that was missing the cover plate, to supply power to a Milwaukee Rotary Hammer Drill, model number 5316-20, 110v/15 amp service, on or about 08/20/2018.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.405 G02 IV

Serious Gravity 1 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.405(g)(2)(iv): Flexible cords were not connected to devices and fittings so that strain relief is provided to prevent pull from being directly transmitted to joints or terminal screws:  a) Exterior Front of Row House - An employee was using an extension cord that was showing signs of a strain on the plug end to supply power to a Milwaukee portable electric rotary drill, model 1-9/16", serial number 5316-20, 110v/15amp service, on or about 08/20/2018.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.416 E01

Serious Gravity 1 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.416(e)(1): Worn or frayed electric cords or cables were used:  a) Exterior Front of Row House - An employee was using an extension cord that was frayed in several places to supply power to a Milwaukee portable electric rotary drill, model 1-1/16", serial number 5316-20, 110v/15amp service, on or about 08/20/2018.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.651 J02

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $2772.00 · Current $1700.00 Reduced
29 CFR 1926.651(j)(2): Protection was not provided by placing and keeping excavated or other materials or equipment at least 2 feet (.61m) from the edge of excavations, or by the use of retaining devices that were sufficient to prevent materials or equipment from falling or rolling into excavations, or by a combination of both if necessary:    a) Exterior Front of Row House - An employee was hand digging a footer in an excavation that was 9 feet in depth and the spoil pile was right at the edge, exposing the employee to a struck by hazard, on or about 08/20/2018.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (2)
  • — I (S) $1700
  • — Z (S) $2772

1926.651 K01

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.651(k)(1): Daily inspections of excavations, the adjacent areas, and protective systems were not made by a competent person for evidence of a situation that could have resulted in possible cave-ins, indications of failure of protective systems:  a) Exterior Front of Row House - A daily inspection of an excavation was not conducted by a competent person as evidenced by; an employee that was in an excavation that measured 9 feet in depth without cave-in protection and there was a spoil pile located at the edge of the excavation, on or about 08/20/2018.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.652 A01

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $3880.00 · Current $2300.00 Reduced
29 CFR 1926.652(a)(1): Each employee in an excavation was not protected from cave-ins by an adequate protective system designed in accordance with 29 CFR 1926.652 (b) or (c):    a) Exterior Front of Row House - An employee was hand digging a footer in an excavation that measured 9 feet in depth and cave-in protection was not provided, on or about 08/20/2018.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification.  This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $2300
  • — Z (S) $3880

MACY'S

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343406187.