WASHINGTON, DC —
OSHA Inspection: PINO'S CONSTRUCTION CORPORATION
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of PINO'S CONSTRUCTION CORPORATION in 1835 ONTARIO PLACE, NW, WASHINGTON, DC 20009 (NAICS 238110). OSHA activity number 343406187.
Where did this inspection happen?
- Establishment
- PINO'S CONSTRUCTION CORPORATION
- Site address
- 1835 ONTARIO PLACE, NW
- City
- WASHINGTON
- State
- DC
- ZIP
- 20009
- Mailing
- 6820 ANNAPOLIS ROCK ROAD, WOODBINE, MD 21797
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238110
- Employees
- 8
- Ownership type
- A
Citations
9 citations on file for this inspection.
1926.21 B02
- Issued
- Abate by
- Penalty
- Initial $1663.00 · Current $1000.00 Reduced
General-duty citation text
29 CFR 1926.21(b)(2): The employer did not instruct each employee in the recognition and avoidance of unsafe conditions and the regulations applicable to his/her environment to control or eliminate any hazards or other exposure to illness or injury: a) Job Site - The employer failed to provide training where employee's were exposed to hazards such as a lack of cave-in protection for an employee in an excavation, damaged flexible cords, and a lack of ground fault circuit interrupters, on or about 08/20/2018. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (2)
- — I (S) $1000
- — Z (S) $1663
1926.403 B02
- Issued
- Abate by
- Penalty
- Initial $1663.00 · Current $1000.00 Reduced
General-duty citation text
29 CFR 1926.403(b)(2): Listed, labeled, or certified equipment was not installed and used in accordance with instructions included in the listing, labeling, or certification: a) Basement Level - Employee was using an extension cord plugged into a 4-way electrical outlet that was hanging by its conductors to supply power to a Milwaukee Rotary Hammer Drill, serial number 5316-20, 110 volt, 15 amp service, on or about 08/20/2018. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (2)
- — I (S) $1000
- — Z (S) $1663
1926.404 B01 I
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.404(b)(1)(i): Employer did not use either ground fault circuit interrupters as specified in paragraph (b)(1)(ii) of this section, or an assured equipment grounding conductor program as specified in paragraph (b)(1)(iii) of this section to protect employees on construction sites: a) Exterior Front of Row House - An employee was using a temporary electrical outlet to provide power to a Milwaukee portable electric rotary drill, model 1-9/16", serial number 5316-20 and a ground fault circuit interrupter was not provided, 110v/15amp service, on or about 08/20/2018. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.405 B02
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.405(b)(2): In energized installations, each outlet box did not have a cover, faceplate, or fixture canopy: a) Basement Level - An employee was using a 4 way outlet that was missing the cover plate, to supply power to a Milwaukee Rotary Hammer Drill, model number 5316-20, 110v/15 amp service, on or about 08/20/2018. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.405 G02 IV
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.405(g)(2)(iv): Flexible cords were not connected to devices and fittings so that strain relief is provided to prevent pull from being directly transmitted to joints or terminal screws: a) Exterior Front of Row House - An employee was using an extension cord that was showing signs of a strain on the plug end to supply power to a Milwaukee portable electric rotary drill, model 1-9/16", serial number 5316-20, 110v/15amp service, on or about 08/20/2018. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.416 E01
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.416(e)(1): Worn or frayed electric cords or cables were used: a) Exterior Front of Row House - An employee was using an extension cord that was frayed in several places to supply power to a Milwaukee portable electric rotary drill, model 1-1/16", serial number 5316-20, 110v/15amp service, on or about 08/20/2018. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.651 J02
- Issued
- Abate by
- Penalty
- Initial $2772.00 · Current $1700.00 Reduced
General-duty citation text
29 CFR 1926.651(j)(2): Protection was not provided by placing and keeping excavated or other materials or equipment at least 2 feet (.61m) from the edge of excavations, or by the use of retaining devices that were sufficient to prevent materials or equipment from falling or rolling into excavations, or by a combination of both if necessary: a) Exterior Front of Row House - An employee was hand digging a footer in an excavation that was 9 feet in depth and the spoil pile was right at the edge, exposing the employee to a struck by hazard, on or about 08/20/2018. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (2)
- — I (S) $1700
- — Z (S) $2772
1926.651 K01
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.651(k)(1): Daily inspections of excavations, the adjacent areas, and protective systems were not made by a competent person for evidence of a situation that could have resulted in possible cave-ins, indications of failure of protective systems: a) Exterior Front of Row House - A daily inspection of an excavation was not conducted by a competent person as evidenced by; an employee that was in an excavation that measured 9 feet in depth without cave-in protection and there was a spoil pile located at the edge of the excavation, on or about 08/20/2018. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.652 A01
- Issued
- Abate by
- Penalty
- Initial $3880.00 · Current $2300.00 Reduced
General-duty citation text
29 CFR 1926.652(a)(1): Each employee in an excavation was not protected from cave-ins by an adequate protective system designed in accordance with 29 CFR 1926.652 (b) or (c): a) Exterior Front of Row House - An employee was hand digging a footer in an excavation that measured 9 feet in depth and cave-in protection was not provided, on or about 08/20/2018. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $2300
- — Z (S) $3880
More inspections in this industry (NAICS 238110)
FREELAND, WA—2026-07-10
WA317992031 - NORTH RIVER CONCRETE PUMPING LLC
MERIDIAN, ID—2026-07-10
DIAMOND CONCRETE, LLC
WEBSTER, TX—2026-07-09
ZITRO CONCRETE CONSTRUCTION LLC
CHICAGO, IL—2026-07-09
GOEBEL FORMING, LLC
SAN ANTONIO, TX—2026-07-08
URBAN CONCRETE CONTRACTORS LTD
More inspections in DC
WASHINGTON, DC—2026-06-30
U.S. DEPARTMENT OF AGRICULTURE
WASHINGTON, DC—2026-06-16
MACY'S
WASHINGTON, DC—2026-06-02
RIGO MULTISERVICES
WASHINGTON, DC—2026-06-02
DDC CPL LLC
WASHINGTON, DC—2026-06-02
DDC CPL LLC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343406187.