FRANKLIN PARK, IL —
OSHA Inspection: METAL BOX INTERNATIONAL, LLC
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of METAL BOX INTERNATIONAL, LLC in 11600 KING ST, FRANKLIN PARK, IL 60131 (NAICS 337124). OSHA activity number 343654562.
Where did this inspection happen?
- Establishment
- METAL BOX INTERNATIONAL, LLC
- Site address
- 11600 KING ST
- City
- FRANKLIN PARK
- State
- IL
- ZIP
- 60131
- Mailing
- 1555 W 44TH ST, CHICAGO, IL 60609
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- A
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 337124
- Employees
- 60
- Ownership type
- A
Citations
17 citations on file for this inspection.
1910.23 B09
- Issued
- Abate by
- Penalty
- Initial $5304.00 · Current $7000.00
General-duty citation text
29 CFR 1910.23(b)(9): Ladders were not inspected before the initial use in each work shift, or more frequently as necessary, to identify any visible defects that could cause injury: a) Spot Welding Area- On April 23, 2019, the employer failed to ensure that all ladders, including the Alco-Lite Aluminum A-Frame Ladder, were inspected prior to being placed into service on each shift to identify visible defects. The ladder was bent and missing all four slip resistant feet covers. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
- — F (S) $7000
- — C (S) $5304
- — Z (S) $5304
1910.23 B10
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.23(b)(10): Ladders having defects were not marked and taken out of service until repaired: a) Spot Welding Area- On April 23, 2019, the employer failed to ensure that the Alco-Lite Aluminum A-Frame Ladder, with structural damage to the frame was removed from service and tagged until it was repaired. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
1910.136 A
- Issued
- Abate by
- Penalty
- Initial $5304.00 · Current $0.00 Reduced
General-duty citation text
29 CFR 1910.136(a): The employer did not ensure that each affected employee uses protective footwear when working in areas where there is a danger of foot injuries due to falling or rolling objects, or objects piercing the sole, or when the use of protective footwear will protect the affected employee from an electrical hazard, such as a static-discharge or electric-shock hazard, that remains after the employer takes other necessary protective measures: a) Production Areas- On April 23, 2019, the employer did not require the use of protective footwear by an employee that was exposed to forklift traffic, moving equipment, metal scrap, large carts, and metal parts. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
- — F (S) $0
- — C (S) $5304
- — Z (S) $5304
1910.147 C04 I
- Issued
- Abate by
- Penalty
- Initial $9282.00 · Current $7000.00 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a) Shear Department- On or about November 6, 2018, the employer failed to develop and document machine specific procedures to control the potentially hazardous energy for machines, such as Shear #4. This failure prevented employees from knowing the proper information on how to secure all sources of energy, such as electrical, pneumatic, and potential gravitational energy. b) Shear Department- On or about April 4, 2019, the employer failed to develop and document machine specific procedures to control the potentially hazardous energy for machines, such as Shear #2. This failure prevented employees from knowing the proper information on how to secure all sources of energy, such as electrical, pneumatic, and potential gravitational energy. c) Shear Department- On or about April 16, 2019, the employer failed to develop and document machine specific procedures to control the potentially hazardous energy for machines, such as Shear #1. This failure prevented employees from knowing the proper information on how to secure all sources of energy, such as electrical, pneumatic, and potential gravitational energy. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
- — F (S) $7000
- — C (S) $9282
- — Z (S) $9282
1910.147 C04 II
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.147(c)(4)(ii): Procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, 29 CFR 1910.147(c)(4)(ii)(A), (c)(4)(ii)(B), (c)(4)(ii)(C) and (c)(4)(ii)(D): a) Stamping Department- On or about March 14, 2019, the established procedures for the application of energy control did not specify the procedural steps for dissipating the hazardous kinetic energy from the flywheel, blocking and securing the potential gravitational energy, and means of securing and dissipating stored pneumatic energy on the mechanical presses, such as Press #13, Press #14, Press #24 and Press #3673, and the Minster Press, at the facility. b) Bending Department- On or about April 23, 2019, the established procedures for the application of energy control did not specify the procedural steps for dissipating the hazardous kinetic energy from the flywheel, blocking and securing the potential gravitational energy, and means of securing and dissipating stored pneumatic energy on the press brakes, such as Press Brake #17, at the facility. c) Shear Department- On or about April 16, 2019, the established procedures for the application of energy control did not specify the procedural steps for securing the potential gravitational energy, and means of securing and dissipating stored pneumatic energy on the shears, such as Shear #1, at the facility. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
1910.147 C06 I
- Issued
- Abate by
- Penalty
- Initial $9282.00 · Current $9000.00 Reduced
General-duty citation text
1910.147(c)(6)(i) The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed. a) Stamping Department- On or about March 14, 2019, employees were exposed to machine hazards associated with the unexpected energization of Press #13, Press #14, Press #24 and Press #3673, and the Minster Press, at the facility. The employer did not conduct periodic inspection at least annually to ensure that the procedure and requirements of this standard were being followed for this equipment. b) Bending Department- On or about April 23, 2019, employees were exposed to machine hazards associated with the unexpected energization of Press Brake #17 at the facility. The employer did not conduct periodic inspection at least annually to ensure that the procedure and requirements of this standard were being followed for this equipment. c) Shear Department- On or about April 16, 2019, an employee was exposed to machine hazards associated with the unexpected energization of Shear #1. The employer did not conduct periodic inspection at least annually to ensure that the procedure and requirements of this standard were being followed for this equipment. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
- — F (S) $9000
- — C (S) $9282
- — Z (S) $9282
1910.212 A01
- Issued
- Abate by
- Penalty
- Initial $5304.00 · Current $7000.00
General-duty citation text
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks: a) Bending Department- On or about April 24, 2019, the employer failed to ensure that all areas where hazards were created by rotating parts were guarded. The rotating flywheel on Press Brake #17 was not fully enclosed. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
- — F (S) $7000
- — C (S) $5304
- — Z (S) $5304
1910.212 A03 II
- Issued
- Abate by
- Penalty
- Initial $9282.00 · Current $7000.00 Reduced
General-duty citation text
29 CFR 1910.212(a)(3)(ii): Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s): a) Shear Department- On or about April 9, 2019, the employer failed to ensure that all areas where hazards created by the point of operation were guarded on Shear #4. The shear was being used at times without a guard in place. The guard that was available was at other times inadequate to prevent employees from becoming injured while performing cutting of parts. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
- — F (S) $7000
- — C (S) $9282
- — Z (S) $9282
1910.217 C01 I
- Issued
- Abate by
- Penalty
- Initial $9282.00 · Current $7000.00 Reduced
General-duty citation text
29 CFR 1910.217(c)(1)(i): The employer did not provide and ensure the usage of point of operation guards or properly applied point of operation devices on every operation performed on mechanical power press(es): a) Stamping Area- On or about December 13, 2018, the employer failed to ensure that all mechanical power presses, such as the Press #3673, were being used with the use of point of operation guarding. The point of operation was not guarded when the mechanical power press was being run in continuous mode while the operator reached in to retrieve cut parts. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
- — F (S) $7000
- — C (S) $9282
- — Z (S) $9282
1910.217 D09 I
- Issued
- Abate by
- Penalty
- Initial $6630.00 · Current $1000.00 Reduced
General-duty citation text
29 CFR 1910.217(d)(9)(i): The employer did not establish a die setting procedure for mechanical power press(es) that would ensure compliance with 29 CFR 1910.217(c): a) Stamping Department- On or about April 1, 2019, the employer failed to ensure that a die setting procedure was established and utilized when employees were performing die set-up on the Mechanical Power Presses at the facility. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
- — F (O) $1000
- — C (S) $6630
- — Z (S) $6630
1910.255 B05
- Issued
- Abate by
- Penalty
- Initial $3978.00 · Current $1000.00 Reduced
General-duty citation text
29 CFR 1910.255(b)(5): The hazard of flying sparks was not, wherever practical, eliminated by installing a shield guard of safety glass or suitable fire resistant plastic at the point of operation: a) Spot Welding Area- On or about April 23, 2019, the employer failed to provide guarding for flying sparks produced on resistance welders such as Spot Welders #3, #21, and #26, by providing screens, guarding or eliminating the sparking from the machines. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equip ment, photographic or video evidence of abatement, or other written records.
Recent events (3)
- — F (O) $1000
- — C (S) $3978
- — Z (S) $3978
1910.303 B01
- Issued
- Abate by
- Penalty
- Initial $5304.00 · Current $1000.00 Reduced
General-duty citation text
29 CFR 1910.303(b)(1): Electrical equipment was not free from recognized hazards that were likely to cause death or serious physical harm to employees: a) Spot Welding Area- On April 23, 2019, the employer failed to ensure that all electrical equipment, such as the wiring for Spot Welding Machines #21 and #26, were free from recognized hazards in that the cords had exposed live electrical parts and showed evidence of damage. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
- — F (O) $1000
- — C (S) $5304
- — Z (S) $5304
1910.305 A02 X
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.305(a)(2)(x): Flexible cords and cables were not protected from accidental damage, as might be caused, for example, by sharp corners, projections, and doorways or other pinch points. a) Spot Welding Area- On April 23, 2019, the employer failed to ensure that all flexible cords, such as the cords supplying power to Spot Welding Machine #9, #21, and #26, were protected from accidental damage and pinch hazards. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
- — F (O) $0
- — C (S) $0
- — Z (S) $0
1910.303 B07 I
- Issued
- Abate by
- Penalty
- Initial $5304.00 · Current $1000.00 Reduced
General-duty citation text
29 CFR 1910.303(b)(7)(i): Unused openings in boxes, raceways, auxiliary gutters, cabinets, equipment cases, or housings were not effectively closed to afford protection substantially equivalent to the wall of the equipment: a) Spot Welding Area- unused openings on the 220 volt disconnect boxes on Spot Welder Machines #3 and #26 were not effectively closed to afford protection substantially equivalent to the wall of the equipment. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
- — F (O) $1000
- — C (S) $5304
- — Z (S) $5304
1910.305 G01 IV A
- Issued
- Abate by
- Penalty
- Initial $6630.00 · Current $0.00 Reduced
General-duty citation text
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: a) Spot Welding Area- On April 23, 2019, the employer failed to provide permanent wiring for the Spot Welding Machines. Flexible cords were run to each of these fixed pieces of equipment. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
- — F (S) $0
- — C (S) $6630
- — Z (S) $6630
1910.333 C02
- Issued
- Abate by
- Penalty
- Initial $9282.00 · Current $2000.00 Reduced
General-duty citation text
29 CFR 1910.333(c)(2): The employer did not ensure that qualified persons were capable of working safely on energized circuits and were familiar with the proper use of special precautionary techniques, personal protective equipment, insulating and shielding materials, and insulated tools. a) Spot Welding Area- On or about April 25, 2019, the employer failed to ensure only qualified persons who had appropriate knowledge of PPE required for electrical work, performed work on circuit parts or equipment. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
- — F (O) $2000
- — C (S) $9282
- — Z (S) $9282
1904.39 A02
- Issued
- Penalty
- Initial $6630.00 · Current $0.00 Reduced
General-duty citation text
29 CFR 1904.39(a)(2): The employer did not report within 24-hours a work-related incident resulting in in-patient hospitalization, amputation or the loss of an eye. a) On or about November 7, 2018, the employer did not report an amputation to an employees fingers as a result of a work-related incident to OSHA within twenty-four (24) hours. No abatement certification or documentation is required for this item.
Recent events (3)
- — F (O) $0
- — C (O) $6630
- — Z (O) $6630
More inspections in this industry (NAICS 337124)
OCALA, FL—2026-06-04
ADMIRAL FURNITURE, LLC
DULUTH, MN—2026-05-12
111228 - ALUMINUM CABINET COMPANY INC
CHICAGO, IL—2026-04-17
EDSAL MANUFACTURING COMPANY, LLC
PUNXSUTAWNEY, PA—2026-01-27
WINDWARD OUTDOOR, LLC
SALEM, OR—2025-12-30
317742734 - BEST CABINETS LLC
More inspections in IL
DEERFIELD, IL—2026-07-16
JOHN BURNS CONSTRUCTION COMPANY, LLC
BANNOCKBURN, IL—2026-07-16
BUILDER SERVICES GROUP, INC. DBA CJ INSULATION
BANNOCKBURN, IL—2026-07-16
ROOFING H.P. LLC
HIGHLAND PARK, IL—2026-07-16
UNITED PLUMBING AND DRAIN, INC.
FRANKLIN PARK, IL—2026-07-16
B & M PLASTIC INC.
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343654562.