Safety Incidents OSHA Severe Injury Reports · 2015–2025
2,004,209Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: DOVER MILLWORK, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of DOVER MILLWORK, INC. in 10862 SHAWNEE ROAD, HARRINGTON, DE 19952 (NAICS 321918). OSHA activity number 343776696.

Watch Dover Millwork, INC. — free Get an email when a new federal OSHA severe-injury report for Dover Millwork, INC. is published. One employer, no account, unsubscribe in one click.
Site address
10862 SHAWNEE ROAD
City
HARRINGTON
State
DE
ZIP
19952
Mailing
10862 SHAWNEE ROAD, HARRINGTON, DE 19952
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
321918
Employees
21
Ownership type
A

7 citations on file for this inspection.

1910.134 F02

Serious Gravity 1 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $1932.00 · Current $1932.00
29 CFR 1910.134(f)(2): Employee(s) using a tight-fitting facepiece respirator were not annually fit tested:  a) 10862 Shawnee Road, Harrington, DE - On February 21, 2019, the employer failed to ensure that employees required to wear tight-fitting facepiece respirators were fit tested annually.
Recent events (2)
  • — I (S) $1932
  • — Z (S) $1932

1910.134 M02 I

Serious Gravity 1 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.134(m)(2)(i): The employer did not establish a record of the qualitative and quantitative fit tests administered to an employee which included the information required by 29 CFR 1910.134(m)(2)(i)(A) through (m)(2)(i)(E):  a) 10862 Shawnee Road, Harrington, DE - On July 22, 2019, the employer failed to ensure that fit test records for employees wearing half-face elastomeric respirators included the type of fit test performed; specific make, model, style, and size of respirator tested; and the the pass/fail results for QLFTs or the fit factor and strip chart recording or other recording of the test results for QNFTs.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.147 C04 II

Serious Gravity 5 5 instances 2 exposed
Issued
Abate by
Penalty
Initial $3221.00 · Current $3221.00
29 CFR 1910.147(c)(4)(ii): Procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, 29 CFR 1910.147(c)(4)(ii)(A), (c)(4)(ii)(B), (c)(4)(ii)(C) and (c)(4)(ii)(D):    a) 10862 Shawnee Road Harrington,DE - On or about February 21, 2019, the employer failed to ensure that the developed energy control procedure clearly identified specific steps to be followed to control hazardous energy for equipment on which employees performed servicing and maintenance, including but not limited to press, table-saw, cut-up saw, jointer, and molder.    NOTE: The procedures must be documented in sufficient detail and provide enough direction so that employees can effectively follow the procedure and determine how to safely perform the servicing and maintenance activities. Over generalization can result in a document which has little or no utility to the employee who must follow procedure. However, while the procedure is required to be written in detail, this does not mean that a separate procedure must be written for each and every machine or piece of equipment. Similar machines and/or equipment (those using the same type and magnitude energy) that has the same or similar types of controls can be covered with a single procedure.
Recent events (2)
  • — I (S) $3221
  • — Z (S) $3221

1910.147 C06 I

Serious Gravity 5 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed:     a) 10862 Shawnee Road Harrington, DE- On or about February 21, 2019, the employer failed to ensure that a periodic inspection of developed energy control procedures were conducted at least annually.     Abatement Note:     *  Where lockout is used for energy control, the periodic inspection shall include a review, between the inspector and each authorized employee, of that employee's responsibilities under the energy control procedure being inspected.1910.147(c)(6)(i)(D)   *  Where tagout is used for energy control, the periodic inspection shall include a review, between the inspector and each authorized and affected employee, of that employee's responsibilities under the energy control procedure being inspected, and the elements set forth in paragraph (c)(7)(ii) of this section.1910.147(c)(6)(ii)   *  The employer shall certify that the periodic inspections have been performed. The certification shall identify the machine or equipment on which the energy control procedure was being utilized, the date of the inspection, the employees included in the inspection, and the person performing the inspection.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.147 C07 I A

Serious Gravity 5 5 instances 2 exposed
Issued
Abate by
Penalty
Initial $3221.00 · Current $0.00 Reduced
29 CFR 1910.147(c)(7)(i)(A): Authorized employee(s) did not receive training in the recognition of applicable hazardous energy sources, the type and magnitude of the energy available in the workplace, and the methods and means necessary for energy isolation:    a) 10862 Shawnee Road Harrington, DE - On or about February 21, 2019, the employer failed to ensure that the training provided for employees to perform servicing and maintenance of equipment, included identification of the specific types, methods and means necessary for energy isolation.
Recent events (2)
  • — I (S) $0
  • — Z (S) $3221

1910.1200 E01 I

Serious Gravity 1 3 instances 2 exposed
Issued
Abate by
Penalty
Initial $1932.00 · Current $1932.00
29 CFR 1910.1200(e)(1)(i): The employer did not compile a list of the hazardous chemicals known to be present using a product identifier that was referenced on the appropriate safety data sheet.     a) 10862 Shawnee Road Harrington, DE - On or about February 21, 2019, the employer failed to develop a hazardous chemical inventory list of all of the hazardous chemicals used and stored in the workplace; including but not limited to Gold Oak Wood Classic finisher, Zinsser-Bull-Eye shellac finisher-finisher and Aqua Zar -Polyurethane.
Recent events (2)
  • — I (S) $1932
  • — Z (S) $1932

1910.1200 G01

Serious Gravity 1 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.1200(g)(1): The employer did not have a safety data sheet in the workplace for each hazardous chemical which they use:    a) 10862 Shawnee Road Harrington, DE - On or about February 21, 2019, the employer failed to make available Safety Data Sheets for each hazardous chemical used or stored in the workplace.  Safety Data Sheets for Sherwin Williams Gold Oak Wood Classic Stain, Zinsser Bulls-Eye Shellac Finisher/Sealer, and Aqua Zar Polyurethane were not available.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

View DOVER MILLWORK, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343776696.