Safety Incidents OSHA Severe Injury Reports · 2015–2025
4,113,118Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: SPEICHER'S CONSTRUCTION

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of SPEICHER'S CONSTRUCTION in 115 DASHEM LANE, MILLHEIM, PA 16854 (NAICS 238160). OSHA activity number 343922308.

Watch Speicher'S Construction — free Get an email when a new federal OSHA severe-injury report for Speicher'S Construction is published. One employer, no account, unsubscribe in one click.
Site address
115 DASHEM LANE
City
MILLHEIM
State
PA
ZIP
16854
Mailing
172 AMISH SCHOOL DRIVE, AARONSBURG, PA 16820
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238160
Employees
9
Ownership type
A

3 citations on file for this inspection.

1926.501 B13

Serious Gravity 10 2 instances 3 exposed
Issued
Abate by
Penalty
Initial $3978.00 · Current $3100.00 Reduced
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system:    (a) 115 Dashem Lane Millheim PA - An employee was observed performing roofing work activity on an 1 in 12 pitch residential porch roof without the benefit of a fall protection system, thereby exposing employees to a fall of approximately 9 feet 6 inches to the ground below, on or about April 10, 2019.    (b) 115 Dashem Lane Millheim PA - An employee was observed performing roofing work activity on an 1 in 12 pitch residential second porch roof without the benefit of a fall protection system, thereby exposing employees to a fall of approximately 8 feet 8 inches to the ground below, on or about April 10, 2019.    (c) 115 Dashem Lane Millheim PA - Employees were performing roofing work activity on an 8 in 12 pitch residential main roof without the benefit of a fall protection system, thereby exposing employees to a fall of approximately 18 feet high to the ground below, on or about April 10, 2019.    Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $3100
  • — Z (S) $3978

1926.1053 B13

Serious Gravity 5 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $2842.00 · Current $2200.00 Reduced
29 CFR 1926.1053(b)(13): The top or top step of a stepladder was used as a step:    (a) 115 Dashem Lane Millheim PA  - Employee(s) were using a eight foot Werner stepladder and stepped on the top step of the ladder to gain access to the back porch roof of the residential home , thereby exposing employees to an 8 foot 8 inch fall, on or about April 10, 2019.    Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $2200
  • — Z (S) $2842

1926.503 A01

Serious Gravity 5 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $2842.00 · Current $2200.00 Reduced
29 CFR 1926.503(a)(1): The employer did not provide a training program for each employee potentially exposed to fall hazards to enable each employee to recognize the hazards of falling and the procedures to be followed in order to minimize these hazards:    (a)  ) 115 Dashem Lane Millheim PA  - The employer did not provide training to employee(s) which would have allowed employees to recognize the hazards of falling and the equipment and procedures to use to minimize those hazards, thereby exposing employees to possible injuries, on or about April 10, 2019.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $2200
  • — Z (S) $2842

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343922308.