Safety Incidents OSHA Severe Injury Reports · 2015–2025
4,113,118Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: SAUL BALTAZAR RESENDIZ GATICA

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of SAUL BALTAZAR RESENDIZ GATICA in 207 MIRACLE STRIP PKWY S, FORT WALTON BEACH, FL 32548 (NAICS 238140). OSHA activity number 344337282.

Watch Saul Baltazar Resendiz Gatica — free Get an email when a new federal OSHA severe-injury report for Saul Baltazar Resendiz Gatica is published. One employer, no account, unsubscribe in one click.
Site address
207 MIRACLE STRIP PKWY S
City
FORT WALTON BEACH
State
FL
ZIP
32548
Mailing
760 DOORMORE AVE APT 103, BATON ROUGE, LA 70806
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
5
Ownership type
A

9 citations on file for this inspection.

1926.451 B01

Serious Gravity 5 2 instances 4 exposed
Issued
Penalty
Initial $3856.00 · Current $3856.00
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii):  a. On a scaffold at a commercial construction site, located at 207 Miracle Strip Parkway S. in Fort Walton Beach, Florida; On or about September 26, 2019 , the 3rd working level of a tubular frame scaffold system, located on the North side of the building, were not fully planked or decked between the front uprights and the guardrail supports, exposing employees to a 20-foot fall hazard.  b. On a scaffold at a commercial construction site, located at 207 Miracle Strip Parkway S. in Fort Walton Beach, Florida; On or about September 26, 2019 , the 4th working level of a tubular frame scaffold system, located on the East side of the building, were not fully planked or decked between the front uprights and the guardrail supports, exposing employees to a 26-foot fall hazard.
Recent events (1)
  • — Z (S) $3856

1926.451 B10

Serious Gravity 5 1 instance 4 exposed
Issued
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.451(b)(10): Scaffold components manufactured by different manufacturers were intermixed with force so as to distort the scaffold's structural integrity:  a. On a scaffold at a commercial construction site, located at 207 Miracle Strip Parkway S. in Fort Walton Beach, Florida; On or about September 26, 2019, the tubular frame scaffold system, located on the North side of the building, contained components manufactured by different manufacturers that were intermixed with such force that the fifth stage scaffold frame was physically bent and distorted, exposing the employees to struck-by and fall hazards during a scaffold system collapse.
Recent events (1)
  • — Z (S) $0

1926.451 C01 II

Serious Gravity 5 7 instances 4 exposed
Issued
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.451(c)(1)(ii): 29 CFR 1926.451(c)(1)(ii): Supported scaffolds with a height to base width ratio of more than four to one (4:1) were not restrained from tipping by installing guys, ties, and braces at each end of the scaffold and/or at horizontal intervals not to exceed 30 feet (9.1 m):   a. On a scaffold at a commercial construction site, located at 207 Miracle Strip Parkway S. in Fort Walton Beach, Florida; On or about September 26, 2019, the employer exposed employees to struck-by and fall hazards by not properly installing ties to the scaffold system.
Recent events (1)
  • — Z (S) $0

1926.451 E01

Serious Gravity 5 1 instance 4 exposed
Issued
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used:   a. On a scaffold at a commercial construction site, located at 207 Miracle Strip Parkway S. in Fort Walton Beach, Florida; On or about September 26, 2019, the employer exposed employees to fall hazards, in that an point of access to the scaffold, such as but not limited to a hook-on ladder, was not provided for use.
Recent events (1)
  • — Z (S) $0

1926.451 F03

Serious Gravity 5 1 instance 4 exposed
Issued
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity:  a. On a scaffold at a commercial construction site, located at 207 Miracle Strip Parkway S. in Fort Walton Beach, Florida; On or about September 26, 2019, the employer exposed employees to struck-by and fall hazards, in that the scaffold system contained safety discrepancies that should have been recognized and corrected during an inspection that was conducted by a competent person.
Recent events (1)
  • — Z (S) $0

1926.451 G04 I

Serious Gravity 10 2 instances 4 exposed
Issued
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms.  a. On a scaffold at a commercial construction site, located at 207 Miracle Strip Parkway S. in Fort Walton Beach, Florida; On or about September 26, 2019, the employer exposed employees to fall hazards, in that guardrail systems were not installed along all open sides and ends of platforms while performing stucco work.
Recent events (1)
  • — Z (S) $0

1926.451 G04 XV

Serious Gravity 5 2 instances 4 exposed
Issued
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.451(g)(4)(xv): Crossbracing used in place of a midrail was unacceptable because the crossing point of two braces is between 20 inches (0.5 m) and 30 inches ((0.8 M) above the work platform or as a toprail when the crossing point of two braces is not between 20 inches (0.5 m) and 30 inches (0.8 m) above the work platform or as a toprail when the crossing point of two braces is between 38 inches (0.97 m) and 48 inches (1.3 m) above the work platform.  The endpoints at each upright were more than 48 inches (1.3 m) apart.  a. On a scaffold at a commercial construction site, located at 207 Miracle Strip Parkway S. in Fort Walton Beach, Florida; On or about September 26, 2019, the employer exposed an employee to fall hazards greater that 20-foot, in that the cross-braces were used as a toprail, there was no midrail installed, and endpoints at each upright were more than 48 inches apart as the employee performed stucco work.
Recent events (1)
  • — Z (S) $0

1926.452 C02

Serious Gravity 5 7 instances 4 exposed
Issued
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.452(c)(2): Tubular welded frames and panels were not braced by cross, horizontal, or diagonal braces, or combination thereof, which would have secured vertical members together laterally:  a. On a scaffold at a commercial construction site, located at 207 Miracle Strip Parkway S. in Fort Walton Beach, Florida; On or about September 26, 2019, the employer exposed employees to struck-by and fall hazards greater that 20-foot, in that cross braces were missing from scaffold platforms, which did not secure vertical members together laterally, as employees conducted stucco work.
Recent events (1)
  • — Z (S) $0

1910.1200 E01

Other-than-serious 1 instance 4 exposed
Issued
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met:  a. At a commercial construction site, located at 207 Miracle Strip Parkway S. in Fort Walton Beach, FL 32548: On or about September 26, 2019, the employer exposed employees to hazardous chemicals, in that a written Hazard Communication Program was not provided to employees prior to applying exterior wall stucco materials, such as but not limited to Master Wall, Inc. brand products.  OR IN THE ALTERNATIVE: 29 CFR 1926.59:  An employer engaged in construction activities did not comply with the requirements set forth in Part 1910, Section 1200, Hazard Communication.
Recent events (1)
  • — Z (O) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344337282.