COLRAIN, MA —
OSHA Inspection: POULIN GRAIN, INC
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of POULIN GRAIN, INC in 53 COOMBS HILL RD, COLRAIN, MA 01340 (NAICS 424510). OSHA activity number 344560420.
Where did this inspection happen?
- Establishment
- POULIN GRAIN, INC
- Site address
- 53 COOMBS HILL RD
- City
- COLRAIN
- State
- MA
- ZIP
- 01340
- Mailing
- 24 RAILROAD SQ, NEWPORT, VT 05855
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 424510
- Employees
- 251
- Ownership type
- A
Citations
4 citations on file for this inspection.
1910.147 C04 I
- Issued
- Abate by
- Penalty
- Initial $13494.00 · Current $6747.00 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section. 53 Coombs Rd., Colrain: On or about January 9, 2020, procedures were not developed, documented and utilized for the control of potentially hazardous energy for employees operating the Walinga brand augers installed on the companies delivery trucks. Specific abatement documentation that this violation has been corrected must be provided within 10 days of the abatement in accordance with 29CFR1903.19(d)(1).
Recent events (2)
- — I (S) $6747
- — Z (S) $13494
1910.147 C06 II
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.147(c)(6)(ii): The employer did not certify that the periodic inspections have been performed: 53 Coombs Rd., Colrain: On or about January 9, 2020 the employer had not certified that any periodic inspection of lock out tag out procedures had been performed for any equipment including but not limited to the delivery truck's unloading augers and associated off loading equipment. Specific abatement documentation that this violation has been corrected must be provided within 10 days of the abatement in accordance with 29CFR1903.19(d)(1).
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 C07 I
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.147(c)(7)(i): The employer did not provide training to ensure that the purpose and function of the energy control program were understood by authorized, affected, and other employees and that the knowledge and skills required for the safe application, usage, and removal of the energy controls were acquired by authorized employees: 53 Coombs Rd., Colrain: On or about January 9, 2020, an Employee performing servicing and maintenance activities on equipment including, but not limited to, augers and associated unloading equipment on delivery vehicles which had multiple energy sources including pneumatic, hydraulic, and mechanical energy did not possess sufficient knowledge and skills required for the safe application, usage, and removal of the energy controls in the performance of their job duties. Specific abatement documentation that this violation has been corrected must be provided within 10 days of the abatement in accordance with 29CFR1903.19(d)(1).
Recent events (2)
- — I (S) $0
- — Z (S) $0
1904.39 A02
- Issued
- Penalty
- Initial $5000.00 · Current $2500.00 Reduced
General-duty citation text
29 CFR 1904.39(a)(2):Within twenty-four (24) hours after the in-patient hospitalization of one or more employees or an employee's amputation or an employee's loss of an eye, as a result of a work-related incident, the employer did not report the in-patient hospitalization, amputation, or loss of an eye to OSHA: 53 Coombs Rd., Colrain, MA: On or about January 15, 2020, the employer had not reported within 24 hours an employee amputation and subsequent hospitalization which occurred on January 9, 2020 . Specific abatement documentation that this violation has been corrected must be provided within 10 days of the abatement in accordance with 29CFR1903.19(d)(1).
Recent events (2)
- — I (O) $2500
- — Z (O) $5000
More inspections at POULIN GRAIN, INC
NEWPORT, VT—2024-07-02 00:00:00
POULIN GRAIN, INC.
NORTH BENNINGTON, VT—2019-03-08 00:00:00
POULIN GRAIN, INC.
ENOSBURG FALLS, VT—2011-09-13 00:00:00
POULIN GRAIN, INC.
NEWPORT, VT—2003-10-09 00:00:00
POULIN GRAIN INC.
NEWPORT, VT—2002-08-01 00:00:00
POULIN GRAIN INC.
View POULIN GRAIN, INC's full OSHA safety record →
More inspections in this industry (NAICS 424510)
POMEROY, WA—2026-07-01
WA317991893 - POMEROY GRAIN GROWERS INC
EDISON, NE—2026-06-30
AG VALLEY COOP
SCIO, OR—2026-06-10
317744473 - BEACON SEED LLC
HEALY, KS—2026-05-29
BARTLETT GRAIN CO
GOODLAND, KS—2026-05-28
THE SCOULAR COMPANY - GOODLAND
More inspections in MA
WORCESTER, MA—2026-07-10
QUINSIGAMOND COMMUNITY COLLEGE
FITCHBURG, MA—2026-07-10
KELLEY WOOD PRODUCTS, INC.
EVERETT, MA—2026-07-10
HORIZON RETAIL CONSTRUCTION INC
NORTON, MA—2026-07-09
DYNAMIC RESIDENTIAL ROOF MARKETING, LLC
NORTON, MA—2026-07-09
LM GENERAL CONSTRUCTION INC.
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344560420.