WASHINGTON, DC —
OSHA Inspection: JAP CONSTRUCTION, LLC
Unprogrammed Related inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Related safety inspection of JAP CONSTRUCTION, LLC in 721 KENNEDY AVE., NW, WASHINGTON, DC 20006 (NAICS 236116). OSHA activity number 344570601.
Where did this inspection happen?
- Establishment
- JAP CONSTRUCTION, LLC
- Site address
- 721 KENNEDY AVE., NW
- City
- WASHINGTON
- State
- DC
- ZIP
- 20006
- Mailing
- 2309 18TH ST NW, WASHINGTON, DC 20009
What kind of inspection was it?
- Inspection type
- Unprogrammed Related (G)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236116
- Employees
- 1
- Ownership type
- A
Citations
9 citations on file for this inspection.
1926.200 G01
- Issued
- Abate by
- Penalty
- Initial $5398.00 · Current $4200.00 Reduced
General-duty citation text
29 CFR 1926.200(g)(1): Construction areas were not posted with legible traffic signs at points of hazards: (a) 721 Kennedy St., NW, Roadway - A construction laborer acting as a flagger was exposed to a struck-by hazard from oncoming vehicular traffic while standing in the travelled way of a two-way street in order to control vehicular traffic while one of the lanes was closed by a parked truck and trailer in use at the construction site, and no advanced signage was provided to warn approaching motorist of the lane closure as required by Section 6G.03 of the MUTCD-2009. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $4200
- — Z (S) $5398
1926.200 G02
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.200(g)(2): The design and use of all traffic control devices, including signs, signals, markings, barricades, and other devices, for protection of construction workers, did not conform to Part 6 of the MUTCD (incorporated by reference, see �1926.6). (a) 721 Kennedy St., NW, Roadway - A construction laborer acting as a flagger was exposed to a struck-by hazard from oncoming vehicular traffic while standing in the travelled way of a two-way street in order to control vehicular traffic while one of the lanes was closed, and no transition areas were provided to direct motorists from the normal travel path to a new path as required by Section 6C.05 of the MUTCD-2009. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.200 G02
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.200(g)(2): The design and use of all traffic control devices, including signs, signals, markings, barricades, and other devices, for protection of construction workers, did not conform to Part 6 of the MUTCD (incorporated by reference, see �1926.6): (a) 721 Kennedy St., NW, Roadway - A construction laborer acting as a flagger was exposed to a struck-by hazard from oncoming vehicular traffic while standing in the travelled way of a two-way street in order to control vehicular traffic while one of the lanes was closed, and flagger stations were not located such that approaching road users would have sufficient distance to stop at an intended stopping point as required by Section 6E.08 of the MUTCD-2009. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.201 A
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.201(a): 29 CFR 1926.201(a): Signaling by flaggers and the use of flaggers, including warning garments worn by flaggers, did not conform to Part 6 of the MUTCD (incorporated by reference, see �1926.6): (a) 721 Kennedy St., NW, Roadway - A construction laborer who was not provided with a reflective vest was exposed to a struck-by hazard from oncoming vehicular traffic while standing in the travelled way of a two-way street acting as a flagger to control vehicular traffic with one of the lanes closed, whereas section 6E.02 of the MUTCD-2009 requires that flaggers shall wear high-visibility, reflective safety apparel that meets the ANSI Performance Class 2 or 3 to clearly identify the wearer as a person. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.201 A
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.201(a): Signaling by flaggers and the use of flaggers, including warning garments worn by flaggers, did not conform to Part 6 of the MUTCD (incorporated by reference, see �1926.6): (a) 721 Kennedy St., NW, Roadway - A construction laborer was exposed to a struck-by hazard from oncoming vehicular traffic while standing in the travelled way of a two-way street acting as a flagger using a 4 by 5 inch utility marking flag to control vehicular traffic with one of the lanes closed, whereas Section 6E.03 of the MUTCD-2009 requires that, flags, when used, shall be red or fluorescent orange/red in color, shall be a minimum of 24 inches square, and shall be securely fastened to a staff that is approximately 36 inches in length. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.201 A
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.201(a): 29 CFR 1926.201(a): Signaling by flaggers and the use of flaggers, including warning garments worn by flaggers, did not conform to Part 6 of the MUTCD (incorporated by reference, see �1926.6): (a) 721 Kennedy St., NW, Roadway - A construction laborer acting as a flagger was exposed to a struck-by hazard from oncoming vehicular traffic while standing in the travelled way of a two-way street using an inadequate flag and unapproved hand signals to control vehicular traffic with one of the lanes closed, whereas Section 6E.07 of the MUTCD-2009 requires that, standardized signaling methods as described in the section shall be used. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 B01
- Issued
- Abate by
- Penalty
- Initial $3932.00 · Current $2400.00 Reduced
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): a) 721 Kennedy St., NW, Front of Building On or about January 16, 2020, the outrigger platform of a supported frame scaffold occupied by masons were not fully planked. (b) 721 Kennedy St., NW, Front of Building On or about January 16, 2020, the first full platform of a supported frame scaffold occupied by masons were not fully planked. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (2)
- — I (S) $2400
- — Z (S) $3932
1926.451 G01
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.451(g)(1): Employees on scaffolds more than 10 feet (3.1 m) above a lower level were not protected from falling to that lower level by fall protection established in paragraphs (g)(1)(i)-(vii) of this section: (a) 721 Kennedy St., NW, Front of Building - On or about January 16, 2020, masons were exposed to a 12 foot fall hazard from a supported frame scaffold which had not been provided with standard guardrails or end rails. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 H01
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.451(h)(1): Each employee on a scaffold was not provided with additional protection from falling hand tools, debris, and other small objects through the installation of toeboards, screens, guardrail systems, or through the erection of debris nets, catch platforms, or canopy structures that contain or deflect the falling objects: (a) Kennedy St., NW, Front of Building On or about January 16, 2020, masons were exposed to falling objects from a scaffold platform elevated 8 feet above the ground which had not been provided with toe boards or similar means to contain tools and materials. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections in this industry (NAICS 236116)
DELAVAN, WI—2026-07-15
TERONOMY BUILDERS, INC.
QUINCY, MA—2026-07-15
UNITEDWOR VM CONTRACTOR CORP
NEWTON, MA—2026-07-14
DELLBROOK CONSTRUCTION, LLC
NEWTON, MA—2026-07-14
GARDEN HOMES
PLAIN CITY, OH—2026-07-09
RUSCILLI CONSTRUCTION
More inspections in DC
WASHINGTON, DC—2026-06-30
U.S. DEPARTMENT OF AGRICULTURE
WASHINGTON, DC—2026-06-16
MACY'S
WASHINGTON, DC—2026-06-02
RIGO MULTISERVICES
WASHINGTON, DC—2026-06-02
DDC CPL LLC
WASHINGTON, DC—2026-06-02
DDC CPL LLC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344570601.