CHICAGO, IL —
OSHA Inspection: JESUS RANGEL DBA JESUS RANGEL
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of JESUS RANGEL DBA JESUS RANGEL in 2149 N RACINE AVE, CHICAGO, IL 60614 (NAICS 238140). OSHA activity number 344595780.
Where did this inspection happen?
- Establishment
- JESUS RANGEL DBA JESUS RANGEL
- Site address
- 2149 N RACINE AVE
- City
- CHICAGO
- State
- IL
- ZIP
- 60614
- Mailing
- 5431 S PAULINA ST, CHICAGO, IL 60609
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 3
- Ownership type
- A
Citations
11 citations on file for this inspection.
1903.19 C01
- Issued
- Abate by
- Penalty
- Initial $325.00 · Current $325.00
General-duty citation text
29 CFR 1903.19(c)(1): The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated: Jesus Rangel dba Jesus Rangel, failed to certify to OSHA within 10 calendar days after the abatement date that each of the following cited violations had been corrected: Citation Number Item Number Abatement Date 01 01 02/28/2020 01 02a 02/28/2020 01 02b 02/28/2020 01 02c 02/28/2020 01 02d 02/28/2020 01 02e 02/28/2020 01 03 02/28/2020 01 04 02/28/2020 01 05a 02/28/2020 01 05b 02/28/2020 In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF THE CORRECTIVE ACTION WORKSHEET).
Recent events (1)
- — Z (O) $325
1926.300 B01
- Issued
- Abate by
- Penalty
- Initial $3470.00 · Current $3470.00
General-duty citation text
29 CFR 1926.300(b)(1): Power operated tool(s), designed to accommodate guards, were not equipped with such guards when in use: a) On January 30, 2020, employees were using unguarded Bosch grinder while performing masonry work. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
- — Z (S) $3470
1926.451 D02
- Issued
- Abate by
- Penalty
- Initial $4048.00 · Current $4048.00
General-duty citation text
29 CFR 1926.451(d)(2): Suspension scaffold outrigger beams were not restrained to prevent movement: a) On January 30, 2020, employees were working from a suspension scaffold which did not have its outrigger beams restrained to prevent movement. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $4048
1926.451 D03 III
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.451(d)(3)(iii): Construction materials such as, but not limited to, masonry units and rolls of roofing felt, were used as counterweights: a) On January 30, 2020, employees were working from a suspension scaffold where construction materials such as bricks and bags of sand were used as counterweights. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $0
1926.451 D03 VI
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.451(d)(3)(vi): Outrigger beams which are not stabilized by bolts or other direct connections to the floor or roof deck were not secured by tiebacks: a) On January 30, 2020, employees were working from a suspension scaffold that did not have its outrigger beams connected to the roof or secured by tiebacks. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $0
1926.451 D16
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.451(d)(16): In addition to the normal operating brake, suspension scaffold power-operated hoists and manually operated hoists did not have a braking device or locking pawl which engages automatically when a hoist makes either of the following uncontrolled movements: an instantaneous change in momentum or an accelerated overspeed: a) On January 30, 2020, employees were working from a manually operated two-point adjustable suspension scaffold that did not have a braking device or locking pawl. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $0
1926.451 D17
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.451(d)(17): Manually operated hoists did not have a positive crank force to descend: a) On January 30, 2020, employees were working from a two-point adjustable suspension scaffold where the manually operated hoist did not have a positive crank force to descend. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $0
1926.451 E01
- Issued
- Abate by
- Penalty
- Initial $2892.00 · Current $2892.00
General-duty citation text
29 CFR 1926.451(e)(1): Safe access was not provided to scaffold platforms when the platforms were more than 2 feet above or below the point of access: a) On January 30, 2020, employees were exposed to a fall hazard while accessing a suspension scaffold platform. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
- — Z (S) $2892
1926.451 G01 II
- Issued
- Abate by
- Penalty
- Initial $4048.00 · Current $4048.00
General-duty citation text
29 CFR 1926.451(g)(1)(ii): Each employee on a single-point or two-point adjustable suspension scaffold was not protected by both a personal fall arrest system and a guardrail system: a) On January 30, 2020, employees were exposed to fall hazards while working from a two-point adjustable suspension scaffold. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $4048
1926.501 B01
- Issued
- Abate by
- Penalty
- Initial $4048.00 · Current $4048.00
General-duty citation text
29 CFR 1926.501(b)(1): Each employee on a walking/working surface with an unprotected side or edge which was 6 feet (1.8 m) or more above a lower level was not protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems: a) On January 30, 2020, employees performing masonry work were exposed to fall hazards from the roof of a three story building. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $4048
1926.501 B04 I
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.501(b)(4)(i): Each employee on walking/working surfaces was not protected from falling through holes (including skylights), more than six feet (1.8 m) above lower levels, by personal fall arrest systems, covers, or guardrail systems erected around such holes: a) On January 30, 2020, employees were exposed to falls while working around unprotected skylights. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $0
More inspections in this industry (NAICS 238140)
RENO, NV—2026-07-16
DC MASONRY
WINNETKA, IL—2026-07-15
CHICAGO STUCCO CO.
LODI, NJ—2026-07-15
J & O MASONRY CONTRACTORS
DORAVILLE, GA—2026-07-14
SUDLOW CONCRETE, INC.
FLAGLER BEACH, FL—2026-07-14
PLANET DESIGN SERVICES, INC.
More inspections in IL
DEERFIELD, IL—2026-07-16
JOHN BURNS CONSTRUCTION COMPANY, LLC
BANNOCKBURN, IL—2026-07-16
BUILDER SERVICES GROUP, INC. DBA CJ INSULATION
BANNOCKBURN, IL—2026-07-16
ROOFING H.P. LLC
HIGHLAND PARK, IL—2026-07-16
UNITED PLUMBING AND DRAIN, INC.
FRANKLIN PARK, IL—2026-07-16
B & M PLASTIC INC.
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344595780.