On , OSHA opened a planned safety inspection of JESUS RANGEL DBA JESUS RANGEL in 2149 N RACINE AVE, CHICAGO, IL 60614 (NAICS 238140). OSHA activity number 344595780.

Watch Jesus Rangel DBA Jesus Rangel — free Get an email when a new federal OSHA severe-injury report for Jesus Rangel DBA Jesus Rangel is published. One employer, no account, unsubscribe in one click.
Site address
2149 N RACINE AVE
City
CHICAGO
State
IL
ZIP
60614
Mailing
5431 S PAULINA ST, CHICAGO, IL 60609
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
3
Ownership type
A

11 citations on file for this inspection.

1903.19 C01

Other-than-serious 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $325.00 · Current $325.00
29 CFR 1903.19(c)(1): The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated:   Jesus Rangel dba Jesus Rangel, failed to certify to OSHA within 10 calendar days after the abatement date that each of the following cited violations had been corrected:   Citation Number            Item Number                    Abatement Date  01                                01                                   02/28/2020  01                                02a                                   02/28/2020  01                               02b                                   02/28/2020 01                               02c                                   02/28/2020 01                               02d                                  02/28/2020 01                               02e                                   02/28/2020 01                               03                                  02/28/2020 01                               04                                  02/28/2020 01                               05a                                   02/28/2020 01                               05b                                   02/28/2020        In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF THE CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (O) $325

1926.300 B01

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $3470.00 · Current $3470.00
29 CFR 1926.300(b)(1):  Power operated tool(s), designed to accommodate guards, were not equipped with such guards when in use:   a)  On January 30, 2020, employees were using unguarded Bosch grinder while performing masonry work.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (S) $3470

1926.451 D02

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $4048.00 · Current $4048.00
29 CFR 1926.451(d)(2): Suspension scaffold outrigger beams were not restrained to prevent movement:  a)  On January 30, 2020, employees were working from a suspension scaffold which did not have its outrigger beams restrained to prevent movement.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $4048

1926.451 D03 III

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.451(d)(3)(iii): Construction materials such as, but not limited to, masonry units and rolls of roofing felt, were used as counterweights:  a)  On January 30, 2020, employees were working from a suspension scaffold where construction materials such as bricks and bags of sand were used as counterweights.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $0

1926.451 D03 VI

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.451(d)(3)(vi): Outrigger beams which are not stabilized by bolts or other direct connections to the floor or roof deck were not secured by tiebacks:  a)  On January 30, 2020, employees were working from a suspension scaffold that did not have its outrigger beams connected to the roof or secured by tiebacks.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $0

1926.451 D16

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.451(d)(16): In addition to the normal operating brake, suspension scaffold power-operated hoists and manually operated hoists did not have a braking device or locking pawl which engages automatically when a hoist makes either of the following uncontrolled movements: an instantaneous change in momentum or an accelerated overspeed:    a)  On January 30, 2020, employees were working from a manually operated two-point adjustable suspension scaffold that did not have a braking device or locking pawl.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $0

1926.451 D17

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.451(d)(17):  Manually operated hoists did not have a positive crank force to descend:    a)  On January 30, 2020, employees were working from a two-point adjustable suspension scaffold where the manually operated hoist did not have a positive crank force to descend.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $0

1926.451 E01

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $2892.00 · Current $2892.00
29 CFR 1926.451(e)(1): Safe access was not provided to scaffold platforms when the platforms were more than 2 feet above or below the point of access:     a)  On January 30, 2020, employees were exposed to a fall hazard while accessing a suspension scaffold platform.     In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (S) $2892

1926.451 G01 II

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $4048.00 · Current $4048.00
29 CFR 1926.451(g)(1)(ii): Each employee on a single-point or two-point adjustable suspension scaffold was not protected by both a personal fall arrest system and a guardrail system:  a)  On January 30, 2020, employees were exposed to fall hazards while working from a two-point adjustable suspension scaffold.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $4048

1926.501 B01

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $4048.00 · Current $4048.00
29 CFR 1926.501(b)(1):  Each employee on a walking/working surface with an unprotected side or edge which was 6 feet (1.8 m) or more above a lower level was not protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems:    a)  On January 30, 2020, employees performing masonry work were exposed to fall hazards from the roof of a three story building.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $4048

1926.501 B04 I

Serious Gravity 10 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.501(b)(4)(i):  Each employee on walking/working surfaces was not protected from falling through holes (including skylights), more than six feet (1.8 m) above lower levels, by personal fall arrest systems, covers, or guardrail systems erected around such holes:    a)  On January 30, 2020, employees were exposed to falls while working around unprotected skylights.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $0