Safety Incidents OSHA Severe Injury Reports · 2015–2025
2,004,209Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: PROBUILDERO CORP

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of PROBUILDERO CORP in 615 FIFTH AVE, LARCHMONT, NY 10538 (NAICS 238140). OSHA activity number 344603873.

Watch Probuildero Corp — free Get an email when a new federal OSHA severe-injury report for Probuildero Corp is published. One employer, no account, unsubscribe in one click.
Establishment
PROBUILDERO CORP
Site address
615 FIFTH AVE
City
LARCHMONT
State
NY
ZIP
10538
Mailing
1721 BATH AVE, BROOKLYN, NY 11214
Inspection type
Complaint (B)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
7
Ownership type
A

12 citations on file for this inspection.

1910.1200 E01

Deleted Serious Gravity 10 1 instance 7 exposed
Issued
Abate by
Penalty
Initial $4048.00 · Current $0.00 Reduced
29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met: (Construction Reference: 1926.59)  Location: 615 5th Ave, New Rochelle, NY 10801  a) On or about February 4th, 2020, employees were using and mixing hazardous chemicals such as but not limited to Portlandt Mortar on a scaffold to conduct brickwork. The employer does not have a written hazard communication program.
Recent events (2)
  • — I (S) $0
  • — Z (S) $4048

1910.1200 G08

Deleted Serious Gravity 10 1 instance 7 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.1200(g)(8): The employer did not ensure that material safety data sheets were readily accessible to the employees in their work area during each work shift: (Construction Reference: 1926.59)  Location: 615 5th Ave, New Rochelle, NY 10801  a) On or about February 4th, 2020, employees were using and mixing hazardous chemicals such as but not limited to Portlandt Mortar on a scaffold to conduct brickwork and the employer did not maintain any safety data sheets at the job site.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.1200 H01

Deleted Serious Gravity 10 1 instance 7 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.1200(h)(1): Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area: (Construction Reference: 1926.59)  Location: 615 5th Ave, New Rochelle, NY 10801  a) On or about February 4th, 2020, employees were using and mixing hazardous chemicals such as but not limited to Portlandt Mortar. The employer did not provide hazard communication training to the employees.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.50 G

Serious Gravity 10 1 instance 7 exposed
Issued
Penalty
Initial $4048.00 · Current $2571.00 Reduced
29 CFR 1926.50(g): Where employees were exposed to injurious corrosive materials, suitable facilities for quick drenching or flushing of the eyes and body were not provided within the work area for immediate emergency use:    Location: 615 5th Ave, New Rochelle, NY 10801    a) On or about February 4th, 2020, employees were using and mixing hazardous chemicals such as but not limited to Portlandt Mortar to conduct brickwork without an eye wash station.
Recent events (2)
  • — I (S) $2571
  • — Z (S) $4048

1926.451 C01 II

Serious Gravity 10 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $4048.00 · Current $2571.00 Reduced
29 CFR 1926.451(c)(1)(ii): Guys, ties, and/or braces were not installed  according to the scaffold manufacturer's recommendations or at the closest horizontal member to the 4:1 height and repeated vertically at locations of horizontal members every 20 feet (56.1 m) or less thereafter for scaffolds 3 feet ((0.91 m) wide or less, and every 26 feet (7.9 m) or less therafter for scaffolds greater than 3 feet (0.91m) wide:    Location: 615 5th Ave, New Rochelle, NY 10801    a) On or about February 4th, 2020, employees were working on a 5 level scaffold that was not braced.
Recent events (2)
  • — I (S) $2571
  • — Z (S) $4048

1926.451 C02 I

Serious Gravity 10 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $4048.00 · Current $2571.00 Reduced
29 CFR 1926.451(c)(2)(i): Footings were not level, sound, rigid, and capable of supporting the loaded scaffold without settling or displacement:    Location: 615 5th Ave, New Rochelle, NY 10801    a) On or about February 4th, 2020, employees were working on a scaffold whose base plates were not located in such manner to prevent settling or displacement.
Recent events (2)
  • — I (S) $2571
  • — Z (S) $4048

1926.451 E05 I

Serious Gravity 10 2 instances 4 exposed
Issued
Abate by
Penalty
Initial $4048.00 · Current $2571.00 Reduced
29 CFR 1926.451(e)(5)(i): Ramps and walkways 6 feet (1.8 m) or more above lower levels did not have guardrail systems that comply with subpart M of this part -- Fall Protection:    Location: 615 5th Ave, New Rochelle, NY 10801    a) On or about February 4th, 2020, employees were working on a scaffold whose access was a walkway without a guardrail system, approximately 12ft from the ground.    b) On or about February 4th, 2020, employees were working on a scaffold whose access was a walkway without a guardrail system, approximately 24ft from the ground.
Recent events (2)
  • — I (S) $2571
  • — Z (S) $4048

1926.451 F03

Serious Gravity 10 2 instances 7 exposed
Issued
Abate by
Penalty
Initial $4048.00 · Current $2571.00 Reduced
29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity:    Location: 615 5th Ave, Larchmont, NY 10538    a) On or about February 4th, 2020, employees were working on an approximately 24ft scaffold which had not been inspected by a competent person before each work shift.    b) On or about February 4th, 2020, employees were working on an approximately 12ft scaffold which had not been inspected by a competent person before each work shift.
Recent events (2)
  • — I (S) $2571
  • — Z (S) $4048

1926.451 F07

Serious Gravity 10 2 instances 7 exposed
Issued
Abate by
Penalty
Initial $4048.00 · Current $2573.00 Reduced
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration:; Such activities were not performed only by experienced and trained employees selected for such work by the competent person:    Location: 615 5th Ave, New Rochelle, NY 10801    a) On or about February 4th, 2020, employees were working on an approximately 24ft scaffold which had not been erected by trained and experienced employees under the supervision and direction of a competent person qualified in scaffolds.    b) On or about February 4th, 2020, employees were working on an approximately 12ft scaffold which had not been erected by trained and experienced employees under the supervision and direction of a competent person qualified in scaffolds.
Recent events (2)
  • — I (S) $2572.5
  • — Z (S) $4048

1926.454 B

Serious Gravity 10 2 instances 7 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.454(b): The employer did not have each employee involved in erecting, disassembling, moving, operating, repairing, maintaining, or inspecting a scaffold trained by a competent person to recognize any hazards associated with the work in question:  Location: 615 5th Ave, New Rochelle, NY 10801  a) On or about February 4th, 2020, employees were working on an approximately 24ft scaffold with no adequate training to recognize the hazards on-site.   b) On or about February 4th, 2020, employees were working on an approximately 12ft scaffold with no adequate training to recognize the hazards on-site.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 G01 VI

Serious Gravity 10 2 instances 7 exposed
Issued
Abate by
Penalty
Initial $4048.00 · Current $2573.00 Reduced
29 CFR 1926.451(g)(1)(vi): Each employee performing overhand bricklaying operations from a supported scaffold was not protected from falling from all open sides and ends of the scaffold (except at the side next to the wall being laid) by the use of a personal fall arrest system or guardrail system (with minimum 200 pound toprail capacity):    Location: 615 5th Ave, New Rochelle, NY 10801    a) On or about February 4th, 2020, employees were working on an approximately 24ft scaffold without the adequate fall protection.    b) On or about February 4th, 2020, employees were working on an approximately 12ft scaffold without the adequate fall protection.
Recent events (2)
  • — I (S) $2572.5
  • — Z (S) $4048

1926.454 A

Serious Gravity 10 2 instances 7 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards:  Location: 615 5th Ave, New Rochelle, NY 10801  a) On or about February 4th, 2020, employees were working on an approximately 24ft scaffold with no adequate training to recognize the hazards on-site.   b) On or about February 4th, 2020, employees were working on an approximately 12ft scaffold with no adequate training to recognize the hazards on-site.
Recent events (2)