DENVER, CO —
OSHA Inspection: ENCON COLORADO
Federal Agency inspection · Health discipline
At a glance
On , OSHA opened a federal Agency health inspection of ENCON COLORADO in 8600 WELBY ROAD, DENVER, CO 80229 (NAICS 327390). OSHA activity number 344639836.
Where did this inspection happen?
- Establishment
- ENCON COLORADO
- Site address
- 8600 WELBY ROAD
- City
- DENVER
- State
- CO
- ZIP
- 80229
- Mailing
- 2410 S IVANHOE, DENVER, CO 80222
What kind of inspection was it?
- Inspection type
- Federal Agency (M)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 327390
- Employees
- 500
- Ownership type
- A
Citations
5 citations on file for this inspection.
1910.134 A02
- Issued
- Abate by
- Penalty
- Initial $13494.00 · Current $0.00 Reduced
0560C730
General-duty citation text
29 CFR 1910.134(a)(2): A respirator was not provided by the employer to each employee when such equipment was necessary to protect the health of the employee: (a) Encon Colorado at 8600 Welby Road in Denver, CO 80229: On or before December 17, 2019, the employer did not provide respiratory protection for employees exposed to carbon monoxide from the steam pipe generator system used to cure concrete. This condition exposed employees to the respiratory hazards of inhalation of carbon monoxide and insufficient oxygen levels.
Recent events (3)
- — F (S) $0
- — C (S) $13494
- — Z (S) $13494
1910.134 D01 III
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
0560C730
General-duty citation text
29 CFR 1910.134(d)(1)(iii): The employer did not identify and evaluate the respiratory hazard(s) in the workplace; including a reasonable estimate of employee exposures to respiratory hazards and identification of the contaminant's chemical state and physical form: (a) Encon Colorado at 8600 Welby Road in Denver, CO 80229: On or before December 17, 2019, the employer did not identify and evaluate the respiratory hazard in the workplace, in that employees were exposed to carbon monoxide from the steam pipe generator system used to cure concrete. This condition exposed employees to the hazards of inhalation of carbon monoxide.
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
1910.1000 C
- Issued
- Abate by
- Penalty
- Initial $13494.00 · Current $0.00 Reduced
0560C730
General-duty citation text
29 CFR 1910.1000(c): An employee was exposed to Carbon Monoxide in excess of the 8-hour time weighted average limits of 50 ppm listed in Table Z-3: (a) Encon Colorado at 8600 Welby Road in Denver, CO 80229: On December 16, 2019, an employee was exposed to carbon monoxide at an 8-hour time weighted average of 875 ppm which is 17.5 times the OSHA PEL of 50 ppm. This exposure was determined using a post-exposure carboxyhemoglobin (COHb) measurement. (b) Encon Colorado at 8600 Welby Road in Denver, CO 80229: On or before December 17, 2019, the employer did not identify and evaluate the respiratory hazard in the workplace, in that employees were exposed to carbon monoxide inside the steam generator room. This condition exposed employees to carbon monoxide of approximately 175 ppm at the pipe opening during steam generator operation according to direct reading 4 gas monitor measurements.
Recent events (3)
- — F (S) $0
- — C (S) $13494
- — Z (S) $13494
1910.1000 E
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.1000(e): Feasible administrative or engineering controls were not determined and implemented to achieve compliance with the limits prescribed in 29 CFR 1910.1000(a) through (d): (a) Encon Colorado at 8600 Welby Road in Denver, CO 80229: On December 16, 2019, an employee was exposed to carbon monoxide at an 8-hour time weighted average of 875 ppm which is 17.5 times the OSHA PEL of 50 ppm. This exposure was determined using a post-exposure carboxyhemoglobin (COHb) measurement. Engineering and administrative controls were not implemented to prevent overexposure. (b) Encon Colorado at 8600 Welby Road in Denver, CO 80229: On and before December 17, 2019, the employer did not identify and implement feasible administrative and engineering controls to ensure that employees were not overexposed to carbon monoxide inside the steam generator room and while working next to steam pipes in the yard while the steam system was running. This condition exposed employees to carbon monoxide of approximately 175 ppm measured by direct reading 4 gas meter at the pipe opening. Abatement normally will be multistep as follows: STEP 1: Continuous air monitoring devices shall be provided and used by exposed employees as an interim protective measure until feasible engineering and/or administrative controls can be implemented, or whenever such controls fail to reduce employee exposure to within exposure limits. Abatement due 30 days from issuance date: STEP 2: Submit to the Area Director a written detailed plan of abatement outlining a schedule for the implementation of engineering and /or administrative measures to control employee exposure to hazardous substance as referenced in this Citation. This plan shall include, at a minimum, target dates for the following actions which must be consistent with the abatement dates required by this Citation: 1. Evaluation of engineering/administrative control options; 2. Selection of optimum control methods and completion of design; 3. Procurement, installation, and operation of selected control measures; and 4. Testing and acceptable or modification/redesign of controls. All proposed control measures shall be approved for each particular use by a competent industrial hygienist or other technically qualified person. Abatement due 60 days from issuance date: Step 3: Abatement shall have been completed by the implementation of feasible engineering and/or administrative controls upon verification of their effectiveness in achieving compliance. Abatement due 90 days from issuance date:
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
1910.1200 H01
- Issued
- Abate by
- Penalty
- Initial $9639.00 · Current $9639.00
0560C730
General-duty citation text
29 CFR 1910.1200(h)(1): Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area: (a) Encon Colorado at 8600 Welby Road in Denver, CO 80229: On and before December 17, 2019, the employer did not provide effective written hazard communication training for employees regarding the use of carbon monoxide i the steam pipe generator system used to cure concrete.
Recent events (3)
- — F (O) $9639
- — C (S) $9639
- — Z (S) $9639
More inspections at ENCON COLORADO
DENVER, CO—2023-03-30 00:00:00
ENCON COLORADO
DENVER, CO—2018-05-18 00:00:00
ENCON COLORADO
View ENCON COLORADO's full OSHA safety record →
More inspections in this industry (NAICS 327390)
OGDEN, UT—2026-07-10
OLDCASTLE INFRASTRUCTURE, INC.
CHARDON, OH—2026-07-09
JAB SUPPLY CORPORATION
LINDON, UT—2026-07-07
NEW CAST STONE
ANDERSON, CA—2026-07-06
OUTDOOR CREATIONS INC.
MCKINNEY, TX—2026-07-01
QUIKRETE
More inspections in CO
CASTLE ROCK, CO—2026-07-10
MASTER MAGNETICS, INC.
STRASBURG, CO—2026-07-08
JUNIOR ROOFING LLC
FORT COLLINS, CO—2026-07-08
EDWARDS SEMICONDUCTOR SOLUTIONS LLC
CENTENNIAL, CO—2026-07-08
JORDY CONSTRUCTION
HIGHLANDS RANCH, CO—2026-07-08
HOWELL CONSTRUCTION
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344639836.