OSHA Inspection: EAGLE ONE ROOFING & RESTORATION, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of EAGLE ONE ROOFING & RESTORATION, INC. in 2404 RIDGE, EVANSTON, IL 60201 (NAICS 238160). OSHA activity number 344837703.

Watch Eagle ONE Roofing & Restoration, INC. — free Get an email when a new federal OSHA severe-injury report for Eagle ONE Roofing & Restoration, INC. is published. One employer, no account, unsubscribe in one click.
Site address
2404 RIDGE
City
EVANSTON
State
IL
ZIP
60201
Mailing
6409 FAIRFIELD AVE. #2, BERWYN, IL 60402
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238160
Employees
8
Ownership type
A

3 citations on file for this inspection.

1903.19 C01

Other-than-serious 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $325.00 · Current $325.00
29 CFR  1903.19(c)(1): Within 10 calendar days after the abatement date, the employer must certify to OSHA (the Agency) that each cited violation has been abated, except as provided in paragraph (c)(2) of this section.   Eagle One Roofing & Restoration, Inc., failed to certify to OSHA within 10 calendar days after the abatement date that each of the following cited violations had been corrected:   Citation Number                                         Item Number                                                Abatement Date  01                                                                      01a                                                                      09/23/2020  01                                                                      01b                                                                      09/23/2020    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF THE CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (O) $325

1926.501 B13

Serious Gravity 10 8 instances 8 exposed
Issued
Abate by
Penalty
Initial $4048.00 · Current $4048.00
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501(b):         a) Side and rear of building - On or about July 14, 2020, employees were exposed to fall hazards while working without fall protection from a steep pitched roof having a ground to eave height of approximately 20 feet.      b) Front of building  -  On or about July 14, 2020, employees were exposed to fall hazards while working without fall protection from a low slope roof having a ground to eave height of approximately 12 feet.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $4048

1926.451 G01 I

Serious Gravity 10 8 instances 8 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.451(g)(1)(i): Each employee on a boatswains' chair, catenary scaffold, float scaffold, needle beam scaffold, or ladder jack scaffold was not protected by a personal fall arrest system:          a) Rear of building - On or about July 14, 2020, employees were exposed to fall hazards while working without fall protection from ladder jack scaffolding at an elevation of approximately 18 feet.  b) Side of building - On or about July 14, 2020, employees were exposed to fall hazards while working without fall protection from ladder jack scaffolding at an elevation of approximately 18 feet.   In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344837703.