OSHA Inspection: TOM HUMPHRIES DBA HI-TEMP ROOFING

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of TOM HUMPHRIES DBA HI-TEMP ROOFING in 3748 W. WINDSOR AVE., CHICAGO, IL 60625 (NAICS 238140). OSHA activity number 344842752.

Watch TOM Humphries DBA Hi-Temp Roofing — free Get an email when a new federal OSHA severe-injury report for TOM Humphries DBA Hi-Temp Roofing is published. One employer, no account, unsubscribe in one click.
Site address
3748 W. WINDSOR AVE.
City
CHICAGO
State
IL
ZIP
60625
Mailing
3728 N. CENTRAL PARK, CHICAGO, IL 60618
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
4
Ownership type
A

7 citations on file for this inspection.

1903.19 C01

Other-than-serious 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $329.00 · Current $329.00
29 CFR 1903.19(c)(1): The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated:  Tom Humphries dba Hi-Temp Roofing, failed to certify to OSHA within 10 calendar days after the abatement date that each of the following cited violations had been corrected:   Citation Number            Item Number                    Abatement Date  01                                01a                                11/25/2020 01                                01b                                  11/25/2020 01                                02                                    11/25/2020 01                                03a                                  11/25/2020 01                                03b                                  11/25/2020 01                                04                                     11/25/2020   In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF THE CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (O) $329

1926.451 B01

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $4048.00 · Current $4048.00
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports:     a)  On July 20, 2020, employees were exposed to the hazard of falling, approximately 24 feet to the ground, while performing masonry work from a tubular welded frame scaffold platform that was not fully planked.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $4048

1926.451 G01

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level was not protected from falling to that lower level:      a)  On July 20, 2020, employees engaged in masonry work were not protected from the hazards of falling approximately 24 feet to the ground while working from a tubular welded frame scaffold platform.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $0

1926.451 C01 II

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $2892.00 · Current $2892.00
29 CFR 1926.451(c)(1)(ii): Guys, ties, and/or braces were not installed  according to the scaffold manufacturer's recommendations or at the closest horizontal member to the 4:1 height and repeated vertically at locations of horizontal members every 20 feet (56.1 m) or less thereafter for scaffolds 3 feet ((0.91 m) wide or less, and every 26 feet (7.9 m) or less thereafter for scaffolds greater than 3 feet (0.91m) wide:  a)  On July 20, 2020, employees were working from a tubular welded frame scaffold that was five frames high and was not tied to the building.   In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (S) $2892

1926.451 G01 I

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $4048.00 · Current $4048.00
29 CFR 1926.451(g)(1)(i): Each employee on a boatswains' chair, catenary scaffold, float scaffold, needle beam scaffold, or ladder jack scaffold was not protected by a personal fall arrest system:     a) On July 20, 2020, employees were exposed to the hazard of falling while working from a ladder jack scaffold platform elevated approximately 24 feet above the ground.     In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $4048

1926.452 K01

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.452(k)(1): Platforms exceeded a height of 20 feet (6.1 m):    a)  On July 20, 2020, employees were exposed to the hazard of falling while working from a ladder jack scaffold platform exceeding a height of 20 feet.     In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $0

1926.454 A

Serious Gravity 5 2 instances 2 exposed
Issued
Abate by
Penalty
Initial $2892.00 · Current $2892.00
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards:  a)  On or about July 20, 2020, employer did not provide training to each employee in order to recognize hazards associated with working from ladder jack scaffolding and to understand procedures to control or minimize those hazards.  b)  On or about July 20, 2020, employer did not provide training to each employee in order to recognize hazards associated with working from tubular welded frame scaffolding and to understand procedures to control or minimize those hazards.  In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (S) $2892