VOLO, IL —
OSHA Inspection: KANZLER CONSTRUCTION, LLC
Federal Agency inspection · Safety discipline
At a glance
On , OSHA opened a federal Agency safety inspection of KANZLER CONSTRUCTION, LLC in 30846 N US HIGHWAY 12, VOLO, IL 60073 (NAICS 212312). OSHA activity number 344872924.
Where did this inspection happen?
- Establishment
- KANZLER CONSTRUCTION, LLC
- Site address
- 30846 N US HIGHWAY 12
- City
- VOLO
- State
- IL
- ZIP
- 60073
- Mailing
- 30846 N US HIGHWAY 12, VOLO, IL 60073
What kind of inspection was it?
- Inspection type
- Federal Agency (M)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Last modified
- Data loaded
Establishment context
- NAICS code
- 212312
- Employees
- 10
- Ownership type
- A
Citations
4 citations on file for this inspection.
1910.219 D01
- Issued
- Abate by
- Penalty
- Initial $4096.00 · Current $4096.00
General-duty citation text
29 CFR 1910.219(d)(1):Pulley(s) with part(s) seven feet or less from the floor or work platform were not guarded in accordance with the requirements specified in 29 CFR 1910.219(m) and (o): a) On or about August 7, 2020, the employer did not ensure that the engine of the EXTEC Screen Machine was equipped with permanent guards during operation to protect employees from rotating pulleys and in-going nip points. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — C (S) $4096
- — Z (S) $4096
1910.219 E03 I
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.219(e)(3)(i):Vertical or inclined belt(s) were not enclosed by guard(s) conforming to the requirements specified at 29 CFR 1910.219(m) and (o): a) a) On or about August 7, 2020, the employer did not ensure that the engine of the EXTEC Screen Machine was equipped with permanent guards during operation to protect employees from rotating belts and in-going nip points. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — C (S) $0
- — Z (S) $0
1910.147 C04 I
- Issued
- Abate by
- Penalty
- Initial $4096.00 · Current $4096.00
General-duty citation text
29 CFR 1910.147(c)(4)(i):Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a) On or about August 7, 2020, the employer failed to utilize a procedure to control the potentially hazardous energy for machines, such as EXTEC Screen Machine when performing unjamming of the equipment. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — C (S) $4096
- — Z (S) $4096
1910.147 C07 I
- Issued
- Abate by
- Penalty
- Initial $4096.00 · Current $4096.00
General-duty citation text
29 CFR 1910.147(c)(7)(i):The employer did not provide adequate training to ensure that the purpose and function of the energy control program was understood by employees: a) On or about August 7, 2020, the employer did not ensure that all employees that were unjamming EXTEC Screen Machine had the knowledge and skills needed to control the potentially hazardous energy. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — C (S) $4096
- — Z (S) $4096
More inspections in this industry (NAICS 212312)
BEDFORD, PA—2026-04-10
NEW ENTERPRISE STONE & LIME CO. INC.
PASO ROBLES, CA—2026-03-23
BLUE MOUNTAIN MINERALS
MANGILAO, GU—2026-01-07
CORE TECH INTERNATIONAL CORPORATION
LEBEC, CA—2026-01-06
NATIONAL CEMENT COMPANY OF CALIFORNIA, INC.
LUCERNE VALLEY, CA—2025-11-18
SPECIALTY MINERALS INC.
More inspections in IL
DEERFIELD, IL—2026-07-16
JOHN BURNS CONSTRUCTION COMPANY, LLC
BANNOCKBURN, IL—2026-07-16
BUILDER SERVICES GROUP, INC. DBA CJ INSULATION
BANNOCKBURN, IL—2026-07-16
ROOFING H.P. LLC
HIGHLAND PARK, IL—2026-07-16
UNITED PLUMBING AND DRAIN, INC.
FRANKLIN PARK, IL—2026-07-16
B & M PLASTIC INC.
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344872924.