ARLINGTON HEIGHTS, IL —
OSHA Inspection: OHI, LLC
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of OHI, LLC in 837 N. PINE, ARLINGTON HEIGHTS, IL 60005 (NAICS 238130). OSHA activity number 344878582.
Where did this inspection happen?
- Establishment
- OHI, LLC
- Site address
- 837 N. PINE
- City
- ARLINGTON HEIGHTS
- State
- IL
- ZIP
- 60005
- Mailing
- 106 GARLISCH, ELK GROVE VILLAGE, IL 60007
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238130
- Employees
- 5
- Ownership type
- A
Citations
7 citations on file for this inspection.
1926.100 A
- Issued
- Abate by
- Penalty
- Initial $3084.00 · Current $1460.00 Reduced
General-duty citation text
29 CFR 1926.100(a): Employees were not protected by protective helmets while working in areas where there was a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns: a) On or about August 10, 2020, employees were exposed to head injury while walking and working without protective helmets below carpentry work activities. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (S) $1460
- — Z (S) $3084
1926.102 A01
- Issued
- Abate by
- Penalty
- Initial $3084.00 · Current $1460.00 Reduced
General-duty citation text
29 CFR 1926.102(a)(1): Employees were not provided with eye and face protection when machines or operations present potential eye or face injury from physical, chemical, or radiation agents: a) On or about August 10, 2020, employees were exposed to eye injury while operating pneumatic nail guns and electric saws without the benefit of eye protection. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (S) $1460
- — Z (S) $3084
1926.451 B01
- Issued
- Abate by
- Penalty
- Initial $5398.00 · Current $2540.00 Reduced
General-duty citation text
29 CFR 1926.451(b)(1): Platform(s) on all working levels of scaffolds, were not fully planked or decked between the front uprights and guardrail supports: a) On or about August 10, 2020, employees were exposed to the hazard of falling approximately 19 feet while working from scaffolding that was not fully planked. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $2540
- — Z (S) $5398
1926.451 G01
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level were not protected from falling to that lower level: a) On or about August 10, 2020, employees were exposed to the hazard of falling approximately 19 feet while working from scaffolding without guardrail systems or other fall protection. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.501 B13
- Issued
- Abate by
- Penalty
- Initial $5398.00 · Current $2540.00 Reduced
General-duty citation text
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501(b): a) On or about August 10, 2020, employees were exposed to the hazard of falling approximately 14 feet to the exterior of the building while performing carpentry work from a second level deck at the front elevation of the building. b) On or about August 10, 2020, employees were exposed to the hazard of falling approximately 10 feet to a second story deck of the building while performing carpentry work from an upper level/attic space of the building. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $2540
- — Z (S) $5398
1926.503 A01
- Issued
- Abate by
- Penalty
- Initial $5398.00 · Current $2540.00 Reduced
General-duty citation text
29 CFR 1926.503(a)(1): The employer did not provide a training program for each employee potentially exposed to fall hazards to enable each employee to recognize the hazards of falling and the procedures to be followed in order to minimize these hazards: a) On or about August 10, 2020, the employer did not provide training to enable employees to recognize the hazards of falling and the procedures to be followed to eliminate or control such hazards at the worksite. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $2540
- — Z (S) $5398
1926.1053 B04
- Issued
- Abate by
- Penalty
- Initial $3084.00 · Current $1460.00 Reduced
General-duty citation text
29 CFR 1926.1053(b)(4): Ladder(s) were used for purposes other than the purpose for which they were designed: a) On or about August 10, 2020, employees were exposed to fall hazards while using an 8 foot stepladder to climb to and from an upper level deck/attic space. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (S) $1460
- — Z (S) $3084
More inspections in this industry (NAICS 238130)
ENCINITAS, CA—2026-07-13
LOU RIDDLE CONSTRUCTION
MERIDIAN, ID—2026-07-10
IDAHO HOMES CONSTRUCTION LLC
KIMBERLY, WI—2026-07-10
ENRIQUE RESENDIC
METTER, GA—2026-07-10
M.A.P.C CONSTRUCTION, LLC
SLINGER, WI—2026-07-10
RAMIREZ HOME BUILDERS LLC
More inspections in IL
BLOOMINGTON, IL—2026-07-13
UNKNOWN CONTRACTOR
GRANITE CITY, IL—2026-07-13
UNITED STATES STEEL CORPORATION
DECATUR, IL—2026-07-10
TILLAMOOK ILLINOIS, LLC
NEW LENOX, IL—2026-07-10
A.D GENERAL CONSTRUCTION LLC
LOCKPORT, IL—2026-07-09
ROBERTO GOMEZ DBA ROBERTO GOMEZ
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344878582.