MISSOURI CITY, TX —
OSHA Inspection: E AND D CONSTRUCTION
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of E AND D CONSTRUCTION in 3314 DRY CREEK DRIVE, MISSOURI CITY, TX 77459 (NAICS 238140). OSHA activity number 345209332.
Where did this inspection happen?
- Establishment
- E AND D CONSTRUCTION
- Site address
- 3314 DRY CREEK DRIVE
- City
- MISSOURI CITY
- State
- TX
- ZIP
- 77459
- Mailing
- 10019 MOROCCO RD UNIT A, HOUSTON, TX 77041
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 3
- Ownership type
- A
Citations
3 citations on file for this inspection.
1926.416 E01
- Issued
- Penalty
- Initial $1755.00 · Current $1053.00 Reduced
General-duty citation text
29 CFR 1926.416(e)(1):Worn or frayed electric cords or cables were used: a) On or about March 22, 2021 at the worksite, employees were exposed to electrical hazards when using a damaged extension cord to power a cement mixing paddle.
Recent events (2)
- — I (S) $1053
- — Z (S) $1755
1926.451 B01
- Issued
- Penalty
- Initial $2341.00 · Current $1405.00 Reduced
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): a) On or about March 22, 2021, at the worksite, employees were engaged in masonry work while on a scaffold platform that was not fully planked, exposing them to a fall hazard.
Recent events (2)
- — I (S) $1404.6
- — Z (S) $2341
1926.451 E01
- Issued
- Penalty
- Initial $2341.00 · Current $1405.00 Reduced
General-duty citation text
29 CFR 1926.451(e)(1): When scaffold platforms are more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface shall be used. Crossbraces shall not be used as a means of access. a) On or about March 22, 2021 at the worksite, employees were using the scaffold framework as means of accessing a two tier scaffold, exposing them to a fall hazard.
Recent events (2)
- — I (S) $1404.6
- — Z (S) $2341
More inspections in this industry (NAICS 238140)
RENO, NV—2026-07-16
DC MASONRY
WINNETKA, IL—2026-07-15
CHICAGO STUCCO CO.
LODI, NJ—2026-07-15
J & O MASONRY CONTRACTORS
DORAVILLE, GA—2026-07-14
SUDLOW CONCRETE, INC.
FLAGLER BEACH, FL—2026-07-14
PLANET DESIGN SERVICES, INC.
More inspections in TX
WICHITA FALLS, TX—2026-07-16
UNITED RENTALS, INC.
SAN MARCOS, TX—2026-07-16
CASA MECHANICAL SERVICES, LTD.
CLARKSVILLE, TX—2026-07-15
SEQUOIAS TREE EXPERT LLC
EL PASO, TX—2026-07-15
SURE STEEL
CORPUS CHRISTI, TX—2026-07-15
NORTH STAR ENERGY SOLUTIONS LLC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 345209332.