1,224,460Inspections Most recent open 2026-07-13 Last loaded 2026-07-16
Safety Incidents OSHA Severe Injury Reports · 2015–2025

OSHA Inspection: CHAMPION MODULAR, INC.

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of CHAMPION MODULAR, INC. in 451 SOUTHERN AVE., STRATTANVILLE, PA 16258 (NAICS 321992). OSHA activity number 345356216.

Watch Champion Modular, INC. — free Get an email when a new federal OSHA severe-injury report for Champion Modular, INC. is published. One employer, no account, unsubscribe in one click.
Site address
451 SOUTHERN AVE.
City
STRATTANVILLE
State
PA
ZIP
16258
Mailing
451 SOUTHERN AVE. PO BOX 269, STRATTANVILLE, PA 16258
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
321992
Employees
193
Ownership type
A

4 citations on file for this inspection.

1926.451 F07

Serious Gravity 10 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $8900.00
29 CFR  1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration:; Such activities were not performed only by experienced and trained employees selected for such work by the competent person.  "As referenced in 29CFR 1910.27(a)."   a.)  Champion Modular, Inc. //Rolling Platform Scaffold//- On or about 5/28/21,  after the scaffold partially tipped, the scaffold was not being moved and erected under the direction/supervision of competent person.  Several employees who were moving and erecting scaffolding, had not been provided with scaffold training.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $8900
  • — Z (S) $0

1926.452 W05

Serious Gravity 10 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR  1926.452(w)(5): Mobile scaffolds were not stabilized to prevent tipping during movement:  "As referenced in 29CFR 1910.27(a)."  a.)  Champion Modular, Inc. //Rolling Platform Scaffold//- On or about 5/28/21, the scaffolding partially tipped over.  After the scaffold tipped,  techniques and measures were not utilized to stabilize the scaffold prior to trying to erect.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.454 B

Serious Gravity 10 2 instances 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR  1926.454(b): The employer did not have each employee involved in erecting, disassembling, moving, operating, repairing, maintaining, or inspecting a scaffold trained by a competent person to recognize any hazards associated with the work in question: "As referenced in 29CFR 1910.27(a)."  a.)  Champion Modular, Inc. //Rolling Platform Scaffold//  - On or about 5/28/21,  after the scaffold had partially tipped, the scaffolds were being inspected, moved, and erected under the direction of  personnel had not received scaffold training to a level to be a competent person.  b.)  Champion Modular, Inc. //Rolling Platform Scaffold//  - On or about 5/28/21,  after the scaffold had partially tipped, several employees who were moving and erecting scaffolding, had not been provided with scaffold training.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 F03

Other-than-serious Gravity 10 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $13653.00 · Current $0.00 Reduced
29 CFR  1926.451(f)(3):Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity:  "As referenced in 29CFR 1910.27(a)."  a.)  Champion Modular, Inc. //Rolling Platform Scaffold// - On or about 5/28/21, and at times prior thereto, the scaffolds were not being inspected  a person who had the total and complete knowledge to be a competent person.   ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (O) $0
  • — Z (S) $13653

View CHAMPION MODULAR, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 345356216.