WATERTOWN, NY —
OSHA Inspection: TIMELESS FRAMES
Planned inspection · Health discipline
At a glance
On , OSHA opened a planned health inspection of TIMELESS FRAMES in 1 FISHER CIRCLE, WATERTOWN, NY 13601 (NAICS 321999). OSHA activity number 345589162.
Where did this inspection happen?
- Establishment
- TIMELESS FRAMES
- Site address
- 1 FISHER CIRCLE
- City
- WATERTOWN
- State
- NY
- ZIP
- 13601
- Mailing
- 1 FISHER CIRCLE, WATERTOWN, NY 13601
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 321999
- Employees
- 11
- Ownership type
- A
Citations
4 citations on file for this inspection.
1910.147 C04 I
- Issued
- Abate by
- Penalty
- Initial $4144.00 · Current $3108.00 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a) Timeless Frames, 1 Fisher Circle, Watertown, NY. Mill Area. On or about 10/20/21, an Authorized Employee was performing maintenance activities on a Unimak Gold 95 Molder (100 psi). The employer did not develop, document and utilize energy control procedures for the pneumatic source of energy for machines including, but not limited to the Unimak Gold 95 Molding Machine. b) Timeless Frames, 1 Fisher Circle, Watertown, NY. Mill Area. On or about 10/20/21, An Authorized Employee performing maintenance on the Unimak Gold 95 Molder (440 volt) did not utilize the procedures for the control of potentially hazardous energy (electrical). Abatement certification must be submitted for this item.
Recent events (2)
- — I (S) $3108
- — Z (S) $4144
1910.147 C07 I A
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.147(c)(7)(i)(A): Authorized employee(s) did not receive training in the recognition of applicable hazardous energy sources, the type and magnitude of the energy available in the workplace, and the methods and means necessary for energy isolation. a) Timeless Frames, 1 Fisher Circle, Watertown, NY. Mill Area. On or about 10/20/2021, an Authorized Employee was performing maintenance on the Unimak Gold 95 Molder Machine powered by both electrical and pneumatic energy sources. The pneumatic energy source was not locked or tagged out prior to beginning maintenance activities on the machine. The employee(s) were not trained in the recognition of applicable energy sources (pneumatic), the type and magnitude of the energy available in the workplace and the methods and means necessary for the energy isolated. Abatement certification must be submitted for this item.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 C07 III B
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.147(c)(7)(iii)(B): Additional retraining was not provided whenever a periodic inspection under 29 CFR 1910.147(c)(6) revealed that there were deviations from or inadequacies in the employee's knowledge or use of the energy control procedures: a) Timeless Frames, 1 Fisher Circle, Watertown, NY. Mill Area. On or about 10/20/21, Prior to providing maintenance on the Unimak Gold 95 Molder Machine, an Authorized Employee did not lock out the energy sources(s) per the Energy Control Procedure. The employee was not provided with retraining on the use of energy control procedures. Abatement certification must be submitted for this item.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 D04 I
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.147(d)(4)(i): Lockout or tagout devices were not affixed to each energy isolating device by authorized employees: a) Timeless Frames, 1 Fisher Circle, Watertown, NY, Mill Area. On or about 10/20/21, an Authorized Employee was performing maintenance work including, but not limited to, changing blades on a Unimak Gold 95 Molder and did not affix a lockout device on the electrical energy source. Abatement certification must be submitted for this item.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections in this industry (NAICS 321999)
NORTH WILKESBORO, NC—2026-07-07
161501 - MILLER BEE SUPPLY, INC.
MIAMI, FL—2026-06-26
FLORIDA LUMBER COMPANY
PLATO, MN—2026-06-25
111471 - GREAT OAK EQUINE
PLATO, MN—2026-06-25
111470 - GREAT OAK EQUINE
DULUTH, MN—2026-06-23
111455 - NORTHSHORE WOOD PRODUCTS INC
More inspections in NY
POUGHKEEPSIE, NY—2026-07-13
MARCO BOARD HOUSE, INC.
CORTLANDT MANOR, NY—2026-07-13
LG BUILDERS INC.
CORTLANDT MANOR, NY—2026-07-13
RJW RENOVATIONS, LLC
HEMPSTEAD, NY—2026-07-13
NYSDOCCS NASSAU AREA OFFICE
NIAGARA FALLS, NY—2026-07-10
NTVI FEDERAL INC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 345589162.