Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,214Inspections Most recent open 2026-07-16 Last loaded 2026-07-20

OSHA Inspection: MEL MULLET

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of MEL MULLET in 226 INDEPENDENCE DRIVE, ELK MOUND, WI 54739 (NAICS 238130). OSHA activity number 345748222.

Watch MEL Mullet — free Get an email when a new federal OSHA severe-injury report for MEL Mullet is published. One employer, no account, unsubscribe in one click.
Establishment
MEL MULLET
Site address
226 INDEPENDENCE DRIVE
City
ELK MOUND
State
WI
ZIP
54739
Mailing
80 7TH AVE, CLAYTON, WI 54004
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238130
Employees
5
Ownership type
A

7 citations on file for this inspection.

1903.19 C01

Other-than-serious 4 instances 5 exposed
Issued
Abate by
Penalty
Initial $349.00 · Current $349.00
29 CFR 1903.19(c)(1):  The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated:  (a)  Citation 1, Item 1; a serious violation of 29 CFR 1926.102(a)(1) with an abatement date of March 10, 2022.  (b)  Citation 1, Item 2a; a serious violation of 29 CFR 1926.501(b)(13) with an abatement date of March 10, 2022.  (c)  Citation 1, Item 2b; a serious violation of 29 CFR 1926.503(a)(1) with an abatement date of March 10, 2022.  (d)  Citation 1, Item 3; a serious violation of 29 CFR 1926.1052(c)(1)(i) with an abatement date of March 10, 2022.
Recent events (1)
  • — Z (O) $349

1903.19 D01

Other-than-serious 2 instances 5 exposed
Issued
Abate by
Penalty
Initial $349.00 · Current $349.00
29 CFR  1903.19(d)(1): The employer did not submit to the Agency documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required.  (a)  Citation 1, Item 2a; a serious violation of 29 CFR 1926.501(b)(13) with an abatement date of March 10, 2022.  (b)  Citation 1, Item 2b; a serious violation of 29 CFR 1926.503(a)(1) with an abatement date of March 10, 2022.
Recent events (1)
  • — Z (O) $349

1926.102 A01

Serious Gravity 1 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $1865.00 · Current $1865.00
29 CFR 1926.102(a)(1): The employer did not ensure that each affected employee used appropriate eye or face protection when exposed to eye or face hazards from flying particles, molten metal, liquid chemicals, acids or caustic liquids, chemical gases or vapors, or potentially injurious light radiation:  (a) South roof, upper level; Employees were operating a Milwaukee brand model M18 cordless framing nail gun to install sheathing and/or framing members on the roof of a residential multiplex without the use of eye protection.
Recent events (1)
  • — Z (S) $1865

1926.501 B13

Serious Gravity 10 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $4351.00 · Current $4351.00
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b):   (a) Roof structure, various locations; Fall protection system(s) were not in place while employees worked from the roof of a residential multiplex to install sheathing and/or framing members at heights ranging from 8 feet, 3 inches to 23 feet above ground level.
Recent events (1)
  • — Z (S) $4351

1926.503 A01

Serious Gravity 10 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.503(a)(1): The employer did not provide a training program for each employee potentially exposed to fall hazards to enable each employee to recognize the hazards of falling and the procedures to be followed in order to minimize these hazards:  (a) Roof structure, various locations; Training on fall hazards and mitigation methods was not provided for employees who worked from the roof of a residential multiplex to install sheathing and/or framing members at heights ranging from 8 feet, 3 inches to 23 feet above ground level.
Recent events (1)
  • — Z (S) $0

1926.1052 C01 I

Serious Gravity 1 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $1865.00 · Current $1865.00
29 CFR 1926.1052(c)(1)(i): Stairways having four or more risers or rising more than 30 inches (76 cm), whichever is less, were not equipped with at least one handrail:  (a) East end of structure, interior; A newly-constructed stairway comprised of 16 risers with a total rise of approximately 121 inches was used to access the roof and second level and was not equipped with at least one handrail.
Recent events (1)
  • — Z (S) $1865

1926.1053 B13

Serious Gravity 5 1 instance 1 exposed
Issued
Penalty
Initial $2486.00 · Current $2486.00
29 CFR  1926.1053(b)(13): The top or top step of a stepladder was used as a step:  (a) Northeast roof, lower level; The top two steps of a Keller brand model KMT-22 multi-position ladder configured as a stepladder was used for accessing and egressing the roof.
Recent events (1)
  • — Z (S) $2486

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 345748222.