Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,214Inspections Most recent open 2026-07-16 Last loaded 2026-07-20

OSHA Inspection: DM EMM LLC

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of DM EMM LLC in 17590 KURTZ SCHOOL ROAD, STEWARTSTOWN, PA 17363 (NAICS 238170). OSHA activity number 345916969.

Watch DM EMM LLC — free Get an email when a new federal OSHA severe-injury report for DM EMM LLC is published. One employer, no account, unsubscribe in one click.
Establishment
DM EMM LLC
Site address
17590 KURTZ SCHOOL ROAD
City
STEWARTSTOWN
State
PA
ZIP
17363
Mailing
206 CRAIN COURT CIR APT TB, GLEN BURNIE, MD 21061
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Last modified
Data loaded
NAICS code
238170
Employees
3
Ownership type
A

8 citations on file for this inspection.

1926.451 B05 II

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $4351.00 · Current $4351.00
29 CFR  1926.451(b)(5)(ii):The end of a platform greater than 10 feet in length extended over its support more than 18 inches and the platform was not designed and installed so that the cantilevered portion of the platform is able to support employees without tipping, or has guardrails which block employee access to the cantilevered end:  (a) 17590 Kurtz School Road Stewartstown PA - An employee worked from a pump jacks scaffolding to hang siding on the residential home.  The scaffolding consisted of an Alum-A-Pole pump jack scaffolding, which included two poles, two pump jacks, and a stage, erected across the side of the residential home,  The employer attached a 2x12 plank that extended it from 3 to 4 feet past the end of the engineered metal planking and was working from it, thereby exposing the employee who worked on the scaffolding to the hazard of the 2x12 snapping and the employee falling to a lower level, on or about April 25, 2022.  Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
  • — Z (S) $4351

1926.451 B08

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR  1926.451(b)(8):At all points of a scaffold where the platform changes direction, such as turning a corner, the platform that rests on a bearer at an angle other than a right angle was not laid first, and platforms which rest at right angles over:  (a) 17590 Kurtz School Road Stewartstown PA - An employee worked from a pump jacks scaffolding to hang siding on the residential home.  The scaffolding consisted of an Alum-A-Pole pump jack scaffolding, which included two poles, two pump jacks, and a stage, erected across the side of the residential home,  The employer attached a 2x12 plank that extended it from 3 to 4 feet past the end of the engineered metal planking and was working from it and would use it to step around to get to the other pump jack scaffold to exit the platforms , exposing the employee who worked on the scaffolding to the hazard of the 2x12 snapping because it was not on a bearer to support the 2x12 and the employee falling approximately 25 feet to a lower level, on or about April 25, 2022.  Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
  • — Z (S) $0

1926.451 C02

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, or uprights did not bear on base plates and mud sills or other adequate firm foundation:  (a) 17590 Kurtz School Road Stewartstown PA - An employee worked from a pump jacks scaffolding to hang siding on the residential home.  The scaffolding consisted of an Alum-A-Pole pump jack scaffolding, which included two poles, two pump jacks, and a stage, erected across the front of the residential home,  The pump jack scaffolding upright poles did not bear on a mud sill, thereby exposing employees to injuries, on or about April 25, 2022.  Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

1926.451 C03

Serious Gravity 10 2 instances 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR  1926.451(c)(3):Supported scaffold poles, legs, post, frames, and/or uprights were not plumb and braced to prevent swaying and displacement:  (a) 17590 Kurtz School Road Stewartstown PA - An employee worked from a pump jacks scaffolding to hang siding on the residential home.  The scaffolding consisted of an Alum-A-Pole pump jack scaffolding, which included two poles, two pump jacks, and a stage, erected across the front of the residential home,  The pump jack scaffolding upright poles at the front were not plumb and level, thereby exposing employees to injuries, on or about April 25, 2022.  (b) 17590 Kurtz School Road Stewartstown PA - An employee worked from a pump jacks scaffolding to hang siding on the residential home.  The scaffolding consisted of an Alum-A-Pole pump jack scaffolding, which included two poles, two pump jacks, and a stage, erected across the north side of the residential home,  The pump jack scaffolding upright poles at the west side of the residential home were not plumb and level, thereby exposing employees to injuries, on or about April 25, 2022.  Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
  • — Z (S) $0

1926.451 G04 I

Serious Gravity 10 2 instances 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR  1926.451(g)(4)(i):Guardrail systems were not installed along all open sides and ends of platforms.  (a) 17590 Kurtz School Road Stewartstown PA - An employee worked from a pump jacks scaffolding to hang siding on the residential home.  The scaffolding consisted of an Alum-A-Pole pump jack scaffolding, which included two poles, two pump jacks, and a stage, erected across the front of the residential home,  The pump jack scaffolding at the front of the house was not equipped with side guard rails, thereby exposing employees to injuries, on or about April 25, 2022.  (b) 17590 Kurtz School Road Stewartstown PA - An employee worked from a pump jacks scaffolding to hang siding on the residential home.  The scaffolding consisted of an Alum-A-Pole pump jack scaffolding, which included two poles, two pump jacks, and a stage, erected across the north side of the residential home, The pump jack scaffolding at the north side of the house was not equipped with side guard rails, thereby exposing employees to injuries, on or about April 25, 2022.  Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
  • — Z (S) $0

1926.452 J02

Serious Gravity 10 2 instances 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR  1926.452(j)(2):Poles were not secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary.  (a) 17590 Kurtz School Road Stewartstown PA - An employee worked from a pump jacks scaffolding to hang siding on the residential home.  The scaffolding consisted of an Alum-A-Pole pump jack scaffolding, which included two poles, two pump jacks, and a stage, erected across the front of the residential home,  The pump jack scaffolding at the front of the house was not equipped with bracing or equivalent at the bottom, thereby exposing employees to injuries, on or about April 25, 2022.  (b) 17590 Kurtz School Road Stewartstown PA - An employee worked from a pump jacks scaffolding to hang siding on the residential home.  The scaffolding consisted of an Alum-A-Pole pump jack scaffolding, which included two poles, two pump jacks, and a stage, erected across the north side of the residential home, The pump jack scaffolding at the north side of the house was not equipped with bracing or equivalent at the bottom, thereby exposing employees to injuries, on or about April 25, 2022.  Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
  • — Z (S) $0

1926.21 B02

Serious Gravity 5 2 instances 3 exposed
Issued
Abate by
Penalty
Initial $3108.00 · Current $3108.00
29 CFR  1926.21(b)(2):The employer did not instruct each employee in the recognition and avoidance of unsafe conditions and the regulations applicable to his/her environment to control or eliminate any hazards or other exposure to illness or injury:  (a) 17590 Kurtz School Road Stewartstown PA - An employee worked from a pump jacks scaffolding to hang siding on the residential home that had several violations and another employee was working under the scaffold without a hard hat on and the employer did not instruct the employees to recognize hazards, thereby exposing employees to injuries, on or about April 25, 2022.   Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $3108

1926.100 A

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets:  (a) 17590 Kurtz School Road Stewartstown PA, - The owner was working from a pump jacks scaffolding approximately 25 feet high hang siding on the front of a residential home, and his employee was working under him with out a hard hat on, thereby exposing employees to injuries, on or about April 25, 2022.   Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 345916969.