OSHA Inspection: JOSE LUENGUA

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of JOSE LUENGUA in 1 COREY RD BENTLEY BROOK BUILDING, HANCOCK, MA 01237 (NAICS 238160). OSHA activity number 346004518.

Watch Jose Luengua — free Get an email when a new federal OSHA severe-injury report for Jose Luengua is published. One employer, no account, unsubscribe in one click.
Establishment
JOSE LUENGUA
Site address
1 COREY RD BENTLEY BROOK BUILDING
City
HANCOCK
State
MA
ZIP
01237
Mailing
24 CAROL ANN DR, ALBANY, NY 12205
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238160
Employees
7
Ownership type
A

7 citations on file for this inspection.

1903.19 C01

Other-than-serious 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $349.00 · Current $349.00
29 CFR  1903.19(c)(1):The employer did not certify to OSHA, within 10 calendar days after the abatement date, that each cited violation has been abated:  As of September 13, 2022 the Employer had not certified to OSHA that the abatement was completed for the violations from Inspection 1600451, issued on 7/5/2022 with a final order date of 8/1/2022.
Recent events (1)
  • — Z (O) $349

1903.19 D01

Other-than-serious 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $349.00 · Current $349.00
29 CFR  1903.19(d)(1):The employer did not submit to the Agency documents demonstrating that abatement is complete for any serious violation for which the Agency indicates in the citation that such abatement documentation is required:  As of September 7, 2022, the Employer had not submitted to the Agency the abatement documentation required for the violation issued on 7/5/2022 on which it was indicated that such abatement documentation was required to be submitted to the Agency.
Recent events (1)
  • — Z (O) $349

1926.501 B13

Serious Gravity 10 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $4351.00 · Current $2176.00 Reduced
29 CFR  1926.501(b)(13): Each employee engaged in residential construction activities 6 feet (1.8 m) or more above lower levels was not  protected by guardrail systems, safety net system, or personal fall arrest system:  1 Corey Rd. (Bentley Brook Building)., Hancock, MA : On or about June 7, 2022, 2 employees observed roofing this residential structure more than 50 feet above the ground below  were not  protected by guardrail systems, safety net system, or personal fall arrest system.   Abatement documentation that this violation has been corrected must be provided within 10 days of the abatement in accordance with 29CFR1903.19(d)(1).
Recent events (2)
  • — I (S) $2175.5
  • — Z (S) $4351

1926.502 D15

Serious Gravity 10 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $4351.00 · Current $0.00 Reduced
29 CFR  1926.502(d)(15):Anchorages used for attachment of personal fall arrest equipment were not capable of supporting at least 5,000 pounds (22.2 kN) per employee attached:  1 Corey Rd. (Bentley Brook Building)., Hancock, MA : On or about June 7, 2022, several employees observed roofing this residential building were attached to anchors that were improperly installed with nails instead of the required screws  invalidating the manufacturers  5,000 pound load per employee rating.  Specific abatement documentation that this violation has been corrected must be provided within 10 days of the abatement in accordance with 29 CFR 1903.19(d)(1).
Recent events (2)
  • — I (S) $0
  • — Z (S) $4351

1926.503 A01

Serious Gravity 10 1 instance 7 exposed
Issued
Abate by
Penalty
Initial $4351.00 · Current $2175.00 Reduced
29 CFR  1926.503(a)(1):The employer did not provide a training program for each employee who might be exposed to fall hazards:  1 Corey Rd. (Bentley Brook Building)., Hancock, MA : On or about June 7, 2022,  employee(s) observed roofing this residential structure  were exposed to fall hazards as part of their assigned duties and the employer had not trained them prior to exposure to these hazards in topics such as but not limited to recognition of fall hazards, dangers of fall hazards and procedures each employee must take to prevent or minimize risk of such exposures.  Specific abatement documentation that this violation has been corrected must be provided within 10 days of the abatement in accordance with 29 CFR 1903.19(d)(1).
Recent events (2)
  • — I (S) $2175
  • — Z (S) $4351

1926.503 B01

Serious Gravity 10 1 instance 7 exposed
Issued
Abate by
Penalty
Initial $4351.00 · Current $0.00 Reduced
29 CFR  1926.503(b)(1):The employer did not verify compliance with paragraph (a) of this section by preparing a written certification record:  1 Corey Rd. (Bentley Brook Building)., Hancock, MA : On or about June 7, 2022, the employer had not prepared a written certification record of fall protection training which included the name or other identity of the person trained,  the signature of the person trained, date(s) the training was completed and the signature of the person who conducted the training.   Specific abatement documentation that this violation has been corrected must be provided within 10 days of the abatement in accordance with 29 CFR 1903.19(d)(1).
Recent events (2)
  • — I (S) $0
  • — Z (S) $4351

1926.1053 B05 I

Serious Gravity 10 1 instance 7 exposed
Issued
Penalty
Initial $4351.00 · Current $2175.00 Reduced
29 CFR  1926.1053(b)(5)(i):Non-self-supporting ladders were not  used at an angle such that the horizontal distance from the top support to the foot of the ladder is approximately one-quarter of the working length of the ladder (the distance along the ladder between the foot and the top support):  1 Corey Rd. (Bentley Brook Building)., Hancock, MA : On or about June 7, 2022, several employees were observed climbing down the roof access ladder which was set  such that the horizontal distance from the top support to the foot of the ladder was approximately one-third of the working length of the ladder.  Specific abatement documentation that this violation has been corrected must be provided within 10 days of the abatement in accordance with 29 CFR 1903.19(d)(1).
Recent events (2)