ORLAND PARK, IL —
OSHA Inspection: JOSE RAMOS DBA GRC CONSTRUCTION
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of JOSE RAMOS DBA GRC CONSTRUCTION in 16158 SOUTH LA GRANGE ROAD, ORLAND PARK, IL 60462 (NAICS 238140). OSHA activity number 346269871.
Where did this inspection happen?
- Establishment
- JOSE RAMOS DBA GRC CONSTRUCTION
- Site address
- 16158 SOUTH LA GRANGE ROAD
- City
- ORLAND PARK
- State
- IL
- ZIP
- 60462
- Mailing
- 2454 N. LOWELL, CHICAGO, IL 60639
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 7
- Ownership type
- A
Citations
4 citations on file for this inspection.
1903.19 C01
- Issued
- Abate by
- Penalty
- Initial $501.00 · Current $501.00
General-duty citation text
29 CFR 1903.19(c)(1): Within 10 calendar days after the abatement date, the employer must certify to OSHA (the Agency) that each cited violation has been abated, except as provided in paragraph (c)(2) of this section. a) On October 7, 2022, employees were exposed to the hazard of falling approximately 40 feet to the ground, while performing masonry work from a Hydro Mobile M2 Mast Climbing Work Platform that was not fully planked. Citation Number Item Number Abatement Date 01001a03/20/2023 01001b03/20/2023 0100203/20/2023
Recent events (1)
- — Z (O) $501
1926.451 B01
- Issued
- Abate by
- Penalty
- Initial $6250.00 · Current $6250.00
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): a) On October 7, 2022, employees were exposed to the hazard of falling approximately 40 feet to the ground, while performing masonry work from a Hydro Mobile M2 Mast Climbing Work Platform that was not fully planked. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $6250
1926.451 G01
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level was not protected from falling to that lower level. a) On October 7, 2022, employees were exposed to the hazard of falling approximately 40 feet to the ground, while performing masonry work from a Hydro Mobile M2 Mast Climbing Work Platform that was not equipped with guard rails. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $0
1926.454 A
- Issued
- Abate by
- Penalty
- Initial $4465.00 · Current $4465.00
General-duty citation text
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards: a) On or about October 7, 2022, employer did not provide training to each employee in order to recognize hazards associated with working from a Hydro Mobile M2 Mast Climbing Work Platform and to understand procedures to control or minimize those hazards. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
- — Z (S) $4465
More inspections in this industry (NAICS 238140)
RENO, NV—2026-07-16
DC MASONRY
WINNETKA, IL—2026-07-15
CHICAGO STUCCO CO.
LODI, NJ—2026-07-15
J & O MASONRY CONTRACTORS
DORAVILLE, GA—2026-07-14
SUDLOW CONCRETE, INC.
FLAGLER BEACH, FL—2026-07-14
PLANET DESIGN SERVICES, INC.
More inspections in IL
DEERFIELD, IL—2026-07-16
JOHN BURNS CONSTRUCTION COMPANY, LLC
BANNOCKBURN, IL—2026-07-16
BUILDER SERVICES GROUP, INC. DBA CJ INSULATION
BANNOCKBURN, IL—2026-07-16
ROOFING H.P. LLC
HIGHLAND PARK, IL—2026-07-16
UNITED PLUMBING AND DRAIN, INC.
FRANKLIN PARK, IL—2026-07-16
B & M PLASTIC INC.
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346269871.