Safety Incidents OSHA Severe Injury Reports · 2015–2025
4,113,118Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: DREAMS ARE FREE LLC

Complaint inspection · Health discipline

On , OSHA opened a complaint health inspection of DREAMS ARE FREE LLC in 27 KENT ST SUITE 123, BALLSTON SPA, NY 12020 (NAICS 323113). OSHA activity number 346296536.

Watch Dreams ARE Free LLC — free Get an email when a new federal OSHA severe-injury report for Dreams ARE Free LLC is published. One employer, no account, unsubscribe in one click.
Establishment
DREAMS ARE FREE LLC
Site address
27 KENT ST SUITE 123
City
BALLSTON SPA
State
NY
ZIP
12020
Mailing
27 KENT ST SUITE 123, BALLSTON SPA, NY 12020
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Last modified
Data loaded
NAICS code
323113
Employees
8
Ownership type
A

6 citations on file for this inspection.

1910.133 A01

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $3108.00 · Current $2020.00 Reduced
29 CFR  1910.133(a)(1): The employer did not ensure that each affected employee uses appropriate eye or face protection when exposed to eye or face hazards from flying particles, molten metal, liquid chemicals, acids or caustic liquids, chemical gases or vapors, or potentially injurious light radiation:    (a) On and before 10/21/2022, at facility, for the production manager spraying AlbaChem Eco-Mist Adhesive glue on sheet of paper and then putting ornaments on it containing chemicals such as, but not limited to, acetone, naphtha, and butane.  The employer did not enforce the requirement to use eye protection.
Recent events (2)
  • — I (S) $2020.2
  • — Z (S) $3108

1910.305 A02 I

Serious Gravity 1 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $1865.00 · Current $1212.00 Reduced
29 CFR  1910.305(a)(2)(i): Temporary electrical power and lighting installation(s) 600 volts, nominal, or less were used in prohibited manners:   a) On and before 10/21/2022, at the shipping machine, the employer had daisy-chained multiple extension cords together to provide power to the shipping machine.  The employer failed to protect employees from fire and electrical hazards by connecting three or more extension cords together which can lead to overheating the cord by overloading it.
Recent events (2)
  • — I (S) $1212.25
  • — Z (S) $1865

1910.1200 E01

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $3108.00 · Current $2020.00 Reduced
29 CFR 1910.1200(e)(1): Employer did not develop, implement, and maintain at each workplace, a written hazard communication program which at least describes how the criteria specified in paragraphs (f), (g), and (h) of this section for labels and other forms of warning, safety data sheets, and employee information and training will be met, and which also includes the following:        (a) On and before 10/21/2022, at facility, for the production manager working with AlbaChem Eco-Mist Adhesive glue containing chemicals such as, but not limited to, acetone, naphtha, and butane and the production assistant working with Brother Cleaning Solution GCX-4E05.  Employer did not develop a hazard communication program.
Recent events (2)
  • — I (S) $2020.2
  • — Z (S) $3108

1910.1200 G01

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.1200(g)(1): Employers did not have a safety data sheet in the workplace for each hazardous chemical which they use:  (a) On and before 10/21/2022, at facility, for the production manager working with AlbaChem Eco-Mist Adhesive glue containing chemicals such as, but not limited to, acetone, naphtha, and butane and the production assistant working with Brother Cleaning Solution GCX-4E05.  The employer did not have SDS's.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.1200 H01

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.1200(h)(1): Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area:  (a) On and before 10/21/2022, at facility, for the production manager working with AlbaChem Eco-Mist Adhesive glue containing chemicals such as, but not limited to, acetone, naphtha, and butane and the production assistant working with Brother Cleaning Solution GCX-4E05.  Training was not provided to employees regarding chemical hazards.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1904.29 A

Other-than-serious 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR  1904.29(a):The employer did not use an OSHA 300, 301 and 300A Form or equivalent.  a) On or prior to 10/21/2022, the employer did not keep OSHA 300 Logs or 300A Summaries.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346296536.